C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological.

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

EUMETNET Presentation for Regional Meeting for Strengthening Regional Cooperation in Meteorology, Hydrology and Climate Services for Disaster Risk Management.
© Crown copyright Met Office WINPROF-II. Tim Oakley, WINPROF II Programme Manager, May 2008.
1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik Draft Interoperability Proposal Terry Davies SRNWP Meeting October 8-11, 2007.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
WMO Outcomes & Recommendations of the Workshop on Radar Data Exchange WMO; Name of Department (ND)
COSMO General Meeting September 2012 Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction EUMETNET C-SRNWP Programme:
COSMO General Meeting, Cracow C-SRNWP PROGRAMME 18 September, EUMETNET/C-SRNWP PROGRAMME: STATUS and PLANS Responsible member: Hungarian Meteorological.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
Regional Report on the current status of the exchange of weather radar data. RA VI Stuart Matthews, UK Met Office on behalf of EUMETNET OPERA April 24th.
Challenges in Urban Meteorology: A Forum for Users and Providers OFCM Panel Summaries Bob Dumont Senior Staff Meteorologist OFCM.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
SRNWP data pool Jean-Marie Bettems / MeteoSwiss Claudia Heret / DWD COSMO GM Roma, September 5 th, 2011.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
GIE/EIG EUMETNET, Registered Number RPM Bruxelles Status of the EUMETNET C-SRNWP project Gergely Bölöni C-SRNWP: Coordination on Short Range.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
2011 Key Issues Review Harnessing Aerospace Experience for Modern Earth and Climate Information Systems and Services Rick Ohlemacher Energy & Environment.
1 Addressing Critical Skills Shortages at the NWS Environmental Modeling Center S. Lord and EMC Staff OFCM Workshop 23 April 2009.
COSMO General Meeting, Offenbach C-SRNWP PROGRAMME 10 September, EUMETNET/C-SRNWP PROGRAMME: STATUS and PLANS Responsible member: Hungarian Meteorological.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
© Crown copyright Met Office Requirements, objectives and desired outcomes for the Workshop Stuart Goldstraw, CBS IOS ET-SBO Chair, 24 th April 2013.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
SRNWP meeting, Dubrovnik OMSZ PROPOSAL October, OMSZ proposal for becoming responsible member of the C-SRNWP programme ANDRÁS HORÁNYI
ALADIN/AROME workshop Preliminary conclusions of the joint meeting of CSSI and LSMG April, 2003, Prague1 JOINT MEETING OF CSSI and LSMG JOINT MEETING.
Page 1© Crown copyright 2004 Quality Management of a European Wind Profiler Network (CWINDE) Tim Oakley TECO-05 Bucharest, 4 th -7 th May.
Second GPM Applications Workshop 9-10.June Partners in the GPM Constellation Second GPM Applications Workshop 9-10.June.2015.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Dr L. P. Riishojgaard, WIGOS Project Manager WMO Secretariat, Geneva WMO; OBS.
European Cooperation on Nowcasting Yong Wang, ZAMG.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Climate Services: The Pacific Climate Information System (PaCIS) Approach Eileen L. Shea NOAA IDEA Center 31 st Climate Diagnostics.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
4th EUMETCAL Workshop, Toulouse 26 – 28 August 2008 Opportunities and Challenges The WMO Education and Training Programme Jeff Wilson.
1 Symposium on the 50 th Anniversary of Operational Numerical Weather Prediction Dr. Jack Hayes Director, Office of Science and Technology NOAA National.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Discussion, Questions, Identification of problems.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.
WMO Polar and High Mountain activities GLOBAL CRYOSPHERE WATCH
Users Requirements The inconsistencies between the UR and GCOS-2006 identified in some of the URDs will be reduced with the new iteration of the GCOS.
Responsible member: Hungarian Meteorological Service Period:
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
LAM and Short Range NWP Some thoughts from Brussels
ALADIN / HIRLAM 19th Workshop / All-Staff Meeting Utrecht, May 2009
Highlights of activities
Status of the EUMETNET C-SRNWP project
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
SRNWP-PEPS COSMO General Meeting September 2005
2nd SRNWP Workshop on Short Range Ensemble 7-8 April 2005 Bologna
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Activities of WG7 Chiara Marsigli.
Presentation transcript:

C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological Service Period: Andras Horanyi

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles C-SRNWP: MAIN OBJECTIVES Improved scientific cooperation between the 5 LAM Consortia (ALADIN, COSMO, HIRLAM, LACE, Met Office) in Europe for numerical weather prediction (NWP) through the initiation and execution of joint projects –Expert Teams and their workplans Enhanced operational cooperation through harmonisation of standards and increased interoperability between models –Interoperability (SRNWP-I) and verification (SRNWP-V) programmes Effective diffusion of NWP knowledge and enhanced practical cooperation in NWP –Thematic SRNWP workshops –Webpage: srnwp.met.hu

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP CONSORTIA (5) and MODELS (4) CONSORTIAMODEL ALADIN ALADIN (ALARO, AROME, HARMONIE) COSMO HIRLAM HIRLAM, HARMONIE (ALADIN, ALARO, AROME) LACE ALADIN (ALARO, AROME, HARMONIE) Met OfficeUnified Model Remark: ALADIN (LACE) and HIRLAM are working on code collaboration around the IFS/ARPEGE/ALADIN/ALARO/AROME (HARMONIE) code

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles

LIST OF EXPERT TEAMS (CROSS- CONSORTIA WORKING GROUPS) Data assimilation and use of observations Diagnostics, validation and verification (  SRNWP-V) Dynamics and lateral boundary coupling Link with applications Physical parameterisation (upper air) Predictability and EPS Surface and soil processes (model and data assimilation) System aspects (  SRNWP-I)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SURFACE DATA EXCHANGE FOR VALIDATION The COSMO consortium initiated the surface and near- surface data exchange for the validation of surface schemes of the NWP models The involved „supersites”: Lindenberg, Payerne, Capofiume, Sodankylaa, Cabauw, Toulouse, Cardington (Valday, Debrecen) The data access can be granted to SRNWP members at the webpage (already 10 users: de Morsier, Machulskaya, Mahfouf, Bush, Vogel, Calvet, Bonafe, Kangas, Samuelsson, Albergel)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles LATERAL BOUNDARY CONDITION (LBC) ISSUES ECMWF TAC subgroup: on the update of the Optional Project on LBCs A possible future Optional Programme on EPS boundaries were emerged (two options) –Operational resolution (T639) and operational ensemble size (50+1) –Higher resolution (T799) and half of the operational ensemble size (24+1) A third proposal from the LAMEPS community –„VAREPS” system: High resolution (T1279 or T799) until two days and lower resolution (T639) afterwards (until 6 days)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles LATERAL BOUNDARY CONDITION (LBC) ISSUES Next steps –Tests for the newly proposed option (thanks to Martin Leutbecher) –Scientific and user meeting at ECMWF during the spring of 2012

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP-I: DELIVERABLES (1) D1: report about the standard output format (+list of parameters, maintenance plan) –Achieved (see EUMETNET portal, GRIB2 on model grids, Consortia softwares to be used  the maintenance would be easier) D2: Requirements and specifications of the adaptors –Not yet fully ready (see also EUMETNET portal) D3: Development of four 2-way adaptors (specific LAM format to standard format and its inverse) –Completed

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP-I: DELIVERABLES (2) D4: Software for enabling any of the LAMs to use any of the global models as initial and lateral boundary conditions –Ongoing D5: Long term sustainability plan –Outline plan D6 (extra): Encoding/decoding of model outputs into GRIB2 format  Delay of the programme execution (the complete surface solution cannot be given during this programme phase)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP-V

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP-V: DELIVERABLES (PREVIOUS PROGRAMME) All the main deliverables are completed: –D1: Operational verification comparison of one version of each of the 4 regional European LAM model (ALADIN, COSMO, HIRLAM, Unified Model, see at EUMETNET portal) –D2: Additional models to the intercomparison –D3: Inventory and recommendations of „new” scale selective verification methods –D4: Catalogue of non-GTS data sources –D5: Exchange methods and code for verification of severe weather forecasts (too early for completion)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles Mean sea level pressure bias amd RMSE Monthly frequency biases for precipitation ≥1mm

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP-V: DELIVERABLES (Phase II, just started) ND1: Continuation of operational verification comparison of one version of each of the 4 regional European LAM model (ALADIN, COSMO, HIRLAM, Unified Model) ND2: Additional verification variables: cloud amount, cloud base, visibility, wind gusts for instance) ND3: Spatial and scale selective verification of precipitation using gridded daily precipitation annalyses, high resolution radar data and OPERA radar composites ND4: Inclusion of severe/high impact weather verification ND5: Full documentation of the methods used in the intercomparison

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles SRNWP: ISSUES At the moment there is no chairperson for the physics ET C-SRNWP PM is asked to act as Interim Forecasting Capability Programme Manager (resource difficulties) SRNWP-V: summary of verification results to be „published” soon SRNWP-I: a follow-on proposal should be prepared Pushing OPERA to produce 2D and 3d radar data with proper quality control at the OPERA Data Hub (already in 2012?)

EUMETNET FORECASTING ROADMAP (UNTIL 2020)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles INTRODUCTORY REMARKS EUMETNET adopted its (high-level) strategy last year –Improved efficiency with shared services –Collective investment in science, technology and skills –Essential partnership with EU/EC The next step is to produce roadmaps for observations, climate, forecasting, aviation and EU Drafting Teams were established for these „capability areas” –Forecasting Roadmap Drafting Team members: Massimo Ferri (chair, STAC), Vesa Nietosvaara (EUMETCAL), Michael Staudinger (EMMA), Clive Wilson (SRNWP-V), Rachel North (SRNWP-I), Jeanette Onvlee (HIRLAM), Piet Termonia (ALADIN), Marco Arpagaus (COSMO), Fredrik Linde (Sweden), Ilda Novo (Portugal), Adrian Broad (PFAC), Jose Antonio Garcia-Moya (Spain), Andras Horanyi (C-SRNWP); Massimo Capaldo („external support”)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles HIGH-LEVEL GOALS ALREADY DEFINED BY THE ASSEMBLY F1: Throughout the decade EUMETNET will support Members in ensuring that they always have highly skilled forecasters through shared training and shared best practise F2: EUMETNET will assist members and their modelling Consortia to develop their forecast models and processes in order to produce the best possible short term forecasts for their clients F3: EUMETNET will have facilitated through a strategic discussion among Members, the identification and initiation of projects for collaboration, harmonisation and coordination in support of more efficient forecasting systems and improved regional and short range weather forecasts

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles TASKS OF THE DRAFTING TEAM Identification of priorities between existing (C-SRNWP, SRNWP-I, SRNWP-V, EMMA, SATREP, EUMETCAL) and proposed new programmes Propose programmes (with their rationale, resource requirements) in the period of Identify cross-cutting issues with the other EUMETNET capability areas

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles HIGH PRIORITY AREAS Protection of past investments Improved communication with users and understanding their requirements Severe and high impact weather forecasting to be improved via –Better nowcasting (also addressing developments of advanced applications for key customers) –High resolution EPS forecasts to address the reliability of convection permitting forecasts and improvement their accuracy Enhanced coordination (Forecasting Capability Area)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles PROPOSED HIGH PRIORITY NEW PROGRAMMES Nowcasting: as extension of SRNWP towards ultra-short range –0,3 FTE as programme manager Short range ensemble prediction: based on the tools already developed by SRNWP-I and SRNWP-V (including the interpretation of uncertainty information by the forecasters – through EUMETCAL) –Phase I: feasibility study –Phase II: demonstration project (Regional climate modelling – should be part of the Climate Roadmap)

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles

SRNWP - RECENT STAGE: TRANSITION SRNWP-V programme is accepted until the end of 2012 SRNWP-I is valid until the end of 2011 (just prolonged without new resources and deliverables) –Continuation proposal should be prepared until autumn C-SRNWP is valid until the end of 2011: no decision yet on its prolongation or its transformation to the EUMETNET Forecasting Capability Programme

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles (FORECASTING) ROADMAP: NEXT STEPS The roadmap should be accepted until the end of the year  the priorities will be clarified Full programme proposals should be ready until spring 2012 (preliminary ones until this autumn) The new (updated) programmes (in agreement with the roadmaps) can start at the beginning of 2013

HIRLAM-ALADIN All Staff Workshop, 5-8 April, 2011, Norrköping GIE/EIG EUMETNET, Registered Number RPM Bruxelles / srnwp.met.hu