2014 Worst Case Discharge Exercise Huntington Beach, CA April 30 th –May 2 nd, 2014 Presented By Jill K. Lemon, USCG Contingency Planner.

Slides:



Advertisements
Similar presentations
ConocoPhillips Transportation Emergency Response Program
Advertisements

Welcome to SMMs Presentation offering a synopsis of our Emergency Response Service on a 24 Hour basis PRESS RIGHT MOUSE CLICK IF YOU WANT TO MOVE BACK.
Thank you to the 2015 Virginia Emergency Management Symposium Sponsors.
United States Coast Guard Vessel Response Plan Requirements CDR Doug Simpson Sector Ohio Valley Chief, Prevention Dept.
Cook Inlet Harbor Safety Committee Informational Meeting Enhancing the Marine Transportation System (MTS) in Cook Inlet.
Presentation to RRT/NWAC Spills Prevention, Preparedness and Response Program Dale Jensen, Program Manager March 10, 2011.
Visual 3.1 Unified Command Unit 3: Unified Command.
Singapore’s Actions Against Oil Pollution
NORTHWEST STRAITS INITIATIVE FACILITATING COMMUNITY ENGAGEMENT IN OIL SPILL RESPONSE.
FOUO Golden Guardian 2009 The Governor’s Annual Statewide Exercise Series BG Jack Hagan Deputy Director, Training & Exercise Division California Office.
Spring 2009 San Diego State University Emergency Management Program
SHIPBOARD OIL POLLUTION EMERGENCY PLAN
Salvage and Marine Firefighting & CAPS/Dispersant Regulations: Vessel Response Plans for Oil 33 CFR Part 155.
Salvage and Marine Firefighting Requirements: Vessel Response Plans for Oil 33 CFR Part 155.
Passenger Vessel Safety Specialist Paul Culver Seventh Coast Guard District.
“The Cruise Industry’s Efforts to Enhance Passenger ShiP SAFETY” Bud Darr SVP, Technical and Regulatory Affairs May 28, 2015 Miami, Florida BAHAMAS SHIPOWNERS.
CLICK TO EDIT MASTER TITLE STYLE TRIPR FLAMMABLE LIQUID UNIT TRAINS 1.0 PRE-INCIDENT PLANNING AND PREPAREDNESS.
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
NATIONAL RESPONSE SYSTEM OPA 90. World spills by size Oil Spills Involving More Than 10 Million Gallons Gallons in millions Rank according to total volume.
Federal On-Scene Coordinator Representative Course
MARINE UNDERWRITERS OF SAN FRANCSICO, INC. Marine Seminar Wednesday, April 29, 2009.
©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
RRT/NWAC Sector Puget Sound COTP/FOSC Report: COTP/ FOSC: Capt Scott Ferguson Presenter: LCDR Wade Gough, USCG June 2011.
National Response Center (NRC)  The primary function of the National Response Center is to serve as the sole national point of contact for reporting all.
Unit 6: Unified Command. Unit Objectives  Define Unified Command.  List the advantages of Unified Command.  Identify the primary features of Unified.
Unclas December 2008 U. S. Coast Guard Continuity of Operations (COOP)
NWS Partners Meeting 2010 Dave Westerholm, Director National Oceanic and Atmospheric Administration’s Office of Response and Restoration June 9, 2010.
Harbor Safety Committee of the San Francisco Bay Region Established by state law to prevent oil spills in San Francisco Bay by planning “for the safe navigation.
Clare County Council Oil spill Contingency Plan Recent Major Exercises Paul Moroney BE (Civil), C. Eng. M.I.E.I. M.C.I.Arb. Head of the Environment Section.
U.S. Department of Commerce National Oceanic and Atmospheric Administration (NOAA) NOAA’s Office of Response and Restoration NOAA’s Hazardous Materials.
Functional Tabletop and Worst Case Drills in 2014 Commander Katie Blanchard Sector Puget Sound & Elin Storey Ecology Spills Program Drill Coordinator.
Safe Seas 2006National Oceanic and Atmospheric Administration Safe Seas 2006 Reducing the Impact of Spills: Integrating Observation, Analysis, and Response.
Recent RRT Activities with Canada RRT1  Redrafts of inland CANUSEAST and CANUSQUE (along with RRT2 ) plans to be finalized soon.  CANUSLANT updated in.
Marine Pollution Form unified command with Coast Guard and responsible party (spiller) Form unified command with Coast Guard and responsible party.
MEXUS Activities Overview CAPT DANIEL RYAN Eighth Coast Guard District Chief, Marine Safety Division.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Planning Ahead: NCP, RCP, Area Plans, LEPC Plans, and Homeland Security.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
Background: A Barge owned by Samsung collided with the M/V HEBEI SPIRIT on December 8, 2007, 10 km (6.2 miles) off the coast of South Korea, west of Taean.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
2015 San Diego Area Contingency Plan. San Diego FOSC Zone Orange County/San Diego Line Approx. Interstate 5 US/Mexico Border Out 12 NM.
It’s More Than Just A Spill By: Joseph Leonard and Maren Harding.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Incident Command System and Unified Command USCG Sector San Diego Federal On-Scene Coordinator (FOSC) Zone.
EMS Seminar #4 – Disaster Preparedness Joseph Ip BSc (Hon), MSc, MD VGH Emergency May 28, 2002.
Heather A. Parker, USCG D13 Seattle, WA Heather A. Parker, USCG D13 Seattle, WA.
1 11th Coast Guard District District Response Advisory Team (DRAT)
Improving California’s Oil Spill Prevention & Response A Summary of Senate Bill 414 Amy Trainer, Executive Director Environmental Action Committee of West.
Sector San Francisco USCG Sector San Francisco State ACM – 18 January 2012.
OPRC Level 3 Spill Management Roles & Responsibilities.
LA Basin Petroleum Pipeline Release TTX Goal Raising awareness of local and regional capabilities Building relationships and enhancing coordination Identifying.
Regional Response Team Meeting AUG 12, U.S. Coast Guard Sector San Diego 1.Cases 2.Exercises 3.Items of interest.
Refugio May 2015 – Discharge discovered May 19th, 2015 RP’s worse case estimate: 101,000-gallons of Santa Barbara Crude.
OPRC Level 3 The Contingency Planning Process. OPRC Level 3.
2011 Spill Management Team Exercise
Marine safety Unit Savannah
Point Estero Incident CWO Ricketson
Welcome! March 24, 2011.
2016 Industry-Led WCD Drill
USCG Roles & Responsibilities During a Ship Fire
Welcome! 5 January 2012 ~ Happy New Year! ~.
Washington State Department of Ecology
National Response Center (NRC)
NAMIRG Project Kick off meeting 2018 Brussels, 24 January 2018
IS-700.A: National Incident Management System, An Introduction
Cost Documentation Training
CRISIS MANAGEMENT PLAN
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

2014 Worst Case Discharge Exercise Huntington Beach, CA April 30 th –May 2 nd, 2014 Presented By Jill K. Lemon, USCG Contingency Planner

2014 Worst Case Discharge Exercise Huntington Beach, CA April 30 th –May 2 nd, 2014 Presented by Jill K. Lemon, USCG Contingency Planner

The Exercise ConocoPhillips/Polar Tankers, Inc. sponsored this exercise of the Polar Tanker Vessel Response Plan (VRP) Ship Oil Pollution Emergency Plan (SOPEP) and California Contingency Plan for its fleet of tankers operating in California. Exercise aimed at improving preparedness for response at Polar Tankers/ConocoPhillips and throughout the State of California.

Organizations Involved Various members of the California response community, including representatives from the following organizations: Polar Tankers, Inc. (Polar Tankers) ConocoPhillips Alaska, Inc. (CPAI) United States Coast Guard (USCG) California Department of Fish & Wildlife, Office of Oil Spill Response (OSPR) NJ Resources, Inc. (NJR) Sound Solutions Consulting The Response Group (TRG)

Exercise Overview The first 24 hours of a response to a scenario consisting of a major oil spill from the M/V POLAR INTREPID on her approach to Long Beach Harbor, CA. This exercise was in a Command Post Style The drill started Wednesday April 30 th at noon, which will simulate being midnight between April 30 th and May 1 st.

Scenario Summary The M/V POLAR INTREPID is inbound Port of Long Beach night of April 30 th in anticipation of discharging full cargo at Pier T, Berth 121 morning of May 1 st. At approximately 2350 on Arpil; 30 th, an outbound vessel loses control and collides with the port side of the M/V POLAR INTREPID. The vessel glances off the M/V POLAR INTREPID causing side-shell damage but does not penetrate the inner hull. The collision holes the 4 Port ballast tank to the sea, an damage extends from above to below the waterline. The main deck is deformed but not ruptured. The vessels separate after the collision.

Scenario Continued While the inner hull was not penetrated, there is a large initial release of approximately 10,000 barrels of Alaska North Slope (ANS) crude indicating internal damage between the ballast and cargo tanks. Cargo continues to be released through the holed ballast tank.

Goals and Objectives Conduct an Incident Management Team (IMT) exercise based on the National Preparedness for Response Exercise Program (PREP) to include Salvage and Marine Fire Fighting operations, and the newly established State of California Volunteer Coordination processes.

Artificialities The Incident will not be declared a SONS. Disposition of the other vessel involved in casualty will not be a consideration. Terrorism will not be a consideration. Incident Investigation will not be exercised. MTSRU will not be exercised. There will be no serious injuries/ fatalities.

Artificialities Cont. The Global Incident Management Assist Team (GIMAT) will already be in the area for their annual training. Claims processing will be limited to the establishment of a claims number. There will be no actual equipment equipment deployment Weather will be simulated; tides & currents will be real.

Participating Organizations ConocoPhillips: Polar Tankers, Inc. (PTI) / ConocoPhillips Marine Tier 1 Team (MTOT) Global Incident Management Assist Team (GIMAT) Crisis Management and Emergency Response (CMER) Global Marine Salvage Functional Support Team (GMS FST) Industry Partners: Chevron

Organizations Cont. Response Organizations: Global Diving & Salvage (GDS) Marine Spill Response Corporation (MSRC) National Response Corporation Environmental Services (NRCES) Oiled Wildlife Care Network (OWCN) T & T Salvage United States Coast Guard: Sector Los Angeles/Long Beach (LA/LB) USCG District 11 (D11) USCG Salvage Engineering Response Team (SERT)

Organizations Cont. Other Federal Agencies: U.S National Oceanic and Atmospheric Administration (NOAA) U.S Fish and Wildlife Service State of California: Department of Fish and Wildlife (CDFW); Office of Oil Spill Response (OSPR) California Office of Emergency Services (OES) Local Agencies: Long Beach Fire Department Los Angeles Fire Department

Organizations Cont. Contractors: Bayside Technical Solutions FOSS Maritime Herbert Engineering NJ Resources, Inc. (NJR0 O’Brien’s Response Management (ORM) PIER Systems Sound Solutions Consultants The Response Group (TRG)

Natural Resource Damage Assessment (NRDA) During the exercise, the natural resource trustees exercised their notification and initial coordination protocols as they received information from the Scientific Support Coordinator (SSC), State, and Federal emergency response personnel that the exercise scenario has escalated to a point where there is potential need for NRDA.

Lessons Learned

Safety and Situation in OPS “The practice of imbedding Safety Officer and a Situation Unit staff member in the operations group is a best practice that should be continues for all large- scale events”

Software Issues Working with software inhibited some aspects, and sped-up (skipped valuable portions) of others Difficulty accessing forms in paper Pre-Tactics sped up “The pre-tactics meeting period was being driven by TRG, not the PSC & OSC. As a result, tactics development started before strategies were actually developed and verified.” All 213rr were added to the system, resources became hard to track amongst the “desk chairs and pencils”

Over use of Deputies Operations had (7) Deputies Training artificiality Broken up by discipline, but didn’t coordinate too well Redundancy with Branch Directors Planning had (6) Deputies Training artificiality Assigned to assist Unit Leaders

Thank You Questions?