20. ESLS Workshop, HZB, 19.-20.Nov.2012 STATUS ANKA Outline:General Insertion NANO ………..CAT-ACT …………CLIC Control-System-upgrade Short bunches: EOS …………………Flute.

Slides:



Advertisements
Similar presentations
Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
Advertisements

Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Status of the SESAME Machine
AS Diagnostic Collaboration Mark Boland
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
Erhard Huttel ISS/ANKA 1 CLIC damping wiggler CERN Vacuum Requirements etc. for ANKA General Requirements for UHV Vacuum: Pressure without.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Low Emittance RF Gun Developments for PAL-XFEL
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ELECTRON MOVING AT CONSTANT VELOCITY
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
People Xavier Stragier Marnix van der Wiel (AccTec) Willem op ‘t Root Jom Luiten Walter van Dijk Seth Brussaard Walter Knulst (TUDelft) Fred Kiewiet Eddy.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
PETRA III, A New High Brilliant Light Source At DESY
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
MAX IV linac overview and scope of automation Sara Thorin.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
Report Technical Director Storage-Ring-Installation Completed
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
Status of the CLIC DR wiggler design and production at BINP
Challenges of vacuum chambers with adjustable gap for SC undulators
Status and prospects of VEPP-5 Injection Complex
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
WP11: electron and proton beam testing
Paul Scherrer Institut
Injection facility for Novosibirsk Super Charm Tau Factory
The design of interaction region
Electron Source Configuration
LHC (SSC) Byung Yunn CASA.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
Compact linear accelerator FLUTE: status update
Status of the ASTRID2 RF systems
CLIC Feasibility Demonstration at CTF3
Electron Optics & Bunch Compression
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
Presentation transcript:

20. ESLS Workshop, HZB, Nov.2012 STATUS ANKA Outline:General Insertion NANO ………..CAT-ACT …………CLIC Control-System-upgrade Short bunches: EOS …………………Flute UAB

20. ESLS Workshop, HZB, Nov.2012 General Extensions of Building nearly finished Dipole Vacuum chamber exchanged to increase flux for CD12-beamline Prepare installation of Insertion for Image-beamline Increased failure-rate of hardware (Power-supplies) after 12 y of operation 4 failures / y Exchange-program started

20. ESLS Workshop, HZB, Nov.2012 Building Extension North West (2012) Image-Beamline: Hutches installed, Frontend 2012 South-East (2011) LABS South West (2009) NANO-Beamline++ West CATACT Beamlines In operation: 17 In constr.: 1 Approved: 1 EOS installed SCU14 out Dipole vacuum chamber exchanged Vacuum chamber for Image installed

20. ESLS Workshop, HZB, Nov.2012 SCU14 is gone Design parameter: Period: 14 mm No Periods: 100 Magnetic gap: 16/12/8/(5) mm Current:1000 A Field:0.6 T Reduced current due to quench 350 A Taper entered beam path after warming up (yearly maintenance) Corrugated cold vacuum chamber, gap effective < 5 mm Current 350 A Field: 0.2 T k:0.03

20. ESLS Workshop, HZB, Nov.2012 Daresbury Wiggler in Loan from Daresbury for 2 y To be replaced by SCU18? Gap: 45 mm Period: 20 cm Length: 1 m Field:1.08 T k:20 Gap limited to 45 mm Due to limitation of the NANO-beamline-frontend More flux for NANO-beamline (except first harmonic)

20. ESLS Workshop, HZB, Nov.2012 CAT-ACT-Beamline Catalysis and Actinide Research X-ray absorption / fluorescent 3-60 keV 2 experimental station, one for radioactive samples (10 6 above limit)

20. ESLS Workshop, HZB, Nov.2012 Installation Valve to be moved. One additional vacuum chamber plus scraper. One or two valves? Additional bellows? At least it fits!

20. ESLS Workshop, HZB, Nov.2012 CAT-ACT-Wiggler (BINP) Period-length48mm Number of Main Poles36 Pole scheme¼ - ¾ 1 -1 …¾ -¼ Magnetic Field2.5T Ramp-Time< 5min k11.2 < mA4.3 < 5kW Magnetic gap20mm Vacuum stay clear15mm Budker Institute of Nuclear Physics

20. ESLS Workshop, HZB, Nov.2012 Coils Pole scheme: ½ -1 1 …- ½: radiation off centre ¼ - ¾ 1 -1 …1 - ¾ - ¼ :radiation centered sextupole component zero Inner coil: Higher field (6.3 T) Smaller Current (380 A) Outer coil: Smaller Field (4.8 T) Higher Current (760 A) 2 Power supplies ¼ coils plus main outer plus main inner coils ¾ coils plus main outer coils Adjusting both PS against each other allows compensation of 1st Integral (kick)

20. ESLS Workshop, HZB, Nov.2012 Beta-Function full ring SUL Image NANO/2 RF Injection CAT-ACT RF WERA CAT-ACT off 4 fold symmetry CAT-ACT on Wiggler does vertical focusing Tune shift Global tune adjustment 1fold symmetry around CAT-ACT

20. ESLS Workshop, HZB, Nov.2012 Compensation of BETA Beat CAT-ACT on Local tune adjustment Need: Additional Power Supplies For neighboring Q4/Q5 Current reduced by ~1%

20. ESLS Workshop, HZB, Nov.2012 ANKA-CERN-Cooperation Develop Wiggler for CLIC (BINP) TEST Wiggler at ANKA (Comparable Energy 2.8 GeV) for Heat load and Vacuum chamber (NEG coating) Use Wiggler as Insertion (for ANKA)

20. ESLS Workshop, HZB, Nov.2012 ANKA-CERN-Cooperation Emittance minimal for: 3 T 56 cm Heat load on vacuum chamber from up stream wiggler in the vertical: 50 / mA

20. ESLS Workshop, HZB, Nov.2012 CLIC-Wiggler Specification Field:3 T Period:51 mm No Periods: 34 Vacuum gap:13mm Magnet gap:18mm Max heat-load (CLIC)50 W Heat load (ANKA)4 W k<16 Vacuum chamber exchangeable Magnet-cooling indirect by liquid He Vacuum chamber cooling (liquid N2 / Cold-heads)

20. ESLS Workshop, HZB, Nov.2012 CLIC Wiggler Design Li He Transfer-line Heat-link Magnet-pole

20. ESLS Workshop, HZB, Nov.2012 Cold Diac In (Diamond) Invest effect of electron clouds and ions Heating of cold vacuum chamber by beam Thanks to DIAMOND offering the possibility to do this experiment, And the continuous support during installation and the investigation.

20. ESLS Workshop, HZB, Nov.2012 Electro Optical Sampling B.Steffen,V.Schlott,F.Müller: DIPAC09 Cooperation: KIT, TH Dortmond, TH Berlin, SLS PhD Theses Nicole Hiller Measure short e-bunch-length fs laser pulse is stretched (gratings), polarized, passing through elec.opt.crystal, e-pulse is changing polarization, laser pulse is analyzed, gives bunchlength

20. ESLS Workshop, HZB, Nov.2012 EOS-Setup Linear transfer motorized, crystal Linear transfer pneumatic, shield For normal operation the crystal is withdrawn, shield put in to cover the hole

20. ESLS Workshop, HZB, Nov.2012 EOS-Setup Beam coming from laser (red) Beam going on grating (red) and out of grating (orange) Beam going in crystal (orange) and out of crystal (green) Polarizing beam splitter

20. ESLS Workshop, HZB, Nov.2012 Control-System-Renovation Present control system: Developed by COSYLAB: Operator Console (Clients, Java) Ethernet Server (C++), ACS Manager LonWorks-Bus ADC / DAC / DIO / Serial interface Power-supplies Chosen to avoid expensive hardware (VME) But: Unique development for ANKA Prevents integration of development from EPICS/TANGO community PVSS PLC S7 (Vacuum) Failure rate of hardware increases! Exchange of hardware (PS) needed! New hardware with serial link (Ethernet) internal DAC/ADC Time to change!

20. ESLS Workshop, HZB, Nov.2012 Control-System-Upgrade PVSS-Manager/ ACS Manager / EPICS / Soft IOC ANKA office111maintained by KIT 20 €/m ANKA machine121maintained by KIT ANKA machine192maintained by ANKA Embedded Server BPMs MOXA Serial-Interface Device LON-Works-Bus / Ethernet Ethernet Operator consoles: CSS / JAVAConsole-Layer Server-Layer-virtualized:

20. ESLS Workshop, HZB, Nov.2012 Matlab-Middle-Layer-Tools Matlab-Middle-Layer-Accelerator-Toolbox: Measuring: Responds-Matrix Chromaticity Beam-Based Alignment First turns LOCO

20. ESLS Workshop, HZB, Nov.2012 Flute-Status 45 MW Klystron 21/2 Cell Photo-gun S-bend-linac Compressor chicane Fern-Infrarot-Linac-Und-Test-Experiment Produce small bunches for THz Radiation In cooperation with PSI Will be built up in Cyclotron bunker LINAC /Modulator in kind contribution PSI

20. ESLS Workshop, HZB, Nov.2012 Flute-Built-up 21/2 cell Photo-gun Power: 20 MW Pulse:0.1-3 nC Pulse-Rate:10 Hz Frequency:3 GHz Energy.7 MeV Ti-Sa-Laser: Pulse-Length:120 fs Pulse-Power:2.5 mJ Wavelength:800 nm 266 nm Compressor: Deflection:y° Field:0.x T Length.0.z m R5635 mm S-Bend-Linac Power: 25 MW Number Cells:156 Length:5.2 m Energy.42 MeV

20. ESLS Workshop, HZB, Nov.2012 Simulation SR constant field SR edge radiation Transition radiation comparable flux Gun to compressor: ASTRA Compressor: CSR

20. ESLS Workshop, HZB, Nov.2012 SESAME Energy-SR2.5GeV Booster0.8GeV Microtron0.022GeV Current0.4A Periods8DBA Circumference133.2m Tune horiz. / vert.7.25 / 5.19 Nat. Chroma. h / v-14 / -14 Emittance25nm Mom. Comp Radiation loss0.6MeV

20. ESLS Workshop, HZB, Nov.2012 BESSY I at SESAME Status: 22 MeV Microtron is running: 2µs 8 mA 800 MeV Booster is being built up Storage-ring-magnets are being purchased by CERN 20 M$ contribution Iran, Israel, Jordan,Turkey, SESAME is in Jordan, close to Europe! SESAME was born in Europe! Cyprus (EU) is member of SESAME! Can SESAME be part of ESLS community?

20. ESLS Workshop, HZB, Nov.2012 Thanks for your attention and Support