ECLOUD’12 (the 5 th electron-cloud workshop) 2012.6.6 Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Nano-Beam Scheme for SuperKEKB Andrew Hutton Slides taken from talks by Haruyo Koiso, Yukiyoshi Ohnishi & Masafumi Tawada.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Survey of KEKB magnets and monuments for SuperKEKB Mika Masuzawa(KEK) Yasunobu Ohsawa(KEK) Naohiro Abe, Kenji Mishima (PASCO) Survey of KEKB Magnets and.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
SuperKEKB Project Status Mika Masuzawa (KEK). Contents 1.Introduction – SuperKEKB Luminosity goal – What was presented at XI SuperB Dec.2009 by.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Belle II Science and Overall Project Tom Browder University of Hawaii.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
Electron Cloud Effects in SuperB
Observations and Predictions for DAFNE and SuperB
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
The PEP-II Interaction e+e- Factories Workshop
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Status of SuperKEKB Design: Lattice and IR
SuperB General Meeting June , Perugia (Italy)
LAL meeting on e+ studies, Oct. 2010
Interaction Region Design Options e+e- Factories Workshop
Summary of Washington DOE Review
SuperB IRC Meeting Frascati, Nov. 13th 2007
Proposal for a CESR Damping Ring Test Facility
Makoto Tobiyama KEK Accelerator Laboratory and SOKENDAI
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac Mt. Tsukuba Damping Ring

KEKB was shut down on Jun 30 th 2010, and upgrade of KEKB has started. KEKB B-factory : – Electorn-positron collider with asymmetric energies of 8 GeV (e-) and 3.5 GeV (e+). – Made a great contribution to confirmation of CP violation in the neutral B meson system. – Operation period : 1998 to 2010 – Peak luminosity : 2.1×10 34 cm -2 s -1 – Total integrated luminosity : 1040 /fb To pursue research on flavor physics, much more luminosity is required and the SuperKEKB project was begun in – Commissioning of SuperKEKB will start in the second half of FY /6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 2 Prof. Suzuki (Director General of KEK) pressed the beam abort switch of KEKB. Shut down ceremony (Jun 30 th 2010, KEKB control room)

Mission of SuperKEKB 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 3 Next-generation B-factories Design Luminosity of SuperKEKB is 8  /cm 2 /s, which is about 40 times than the KEKB’s record. The total integrated luminosity will reach 50 /ab just over ten years after inauguration.

Design Concept of SuperKEKB 1 How to Increase Luminosity by 40 Times 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 4  y * at IP : 5.9 -> 0.27/0.30 mm (e+/e-)  Nano-beam scheme (first proposed for SuperB by P. Raimondi)  Luminosity gain :  20 Beam current : 1.7/1.4 A -> 3.6/2.6 A (e+/e-)  Luminosity gain :  2 Beam-beam parameter : > 0.09  Luminosity gain :  1 Total Luminosity Gain : 20  2  1 = 40 Beam-Beam parameter Beam current Vertical beta function at IP Geometrical reduction factors (crossing angle, hourglass effect) Beam aspect ratio at IP Lorentz factor

Collision Scheme Nano Beam Scheme 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 5 d =  x */  SuperKEKB Nano Beam scheme Half crossing angle :  2  = 83 mrad overlap region << bunch length 5-6 mm  m  m 6-7 mm Hourglass requirement KEKB Head-on (crab crossing) overlap region = bunch length  y *   z  6 mm  y *   x * /   300  m In nano-beam scheme: Vertical beta function at IP can be squeezed to  300  m. Small horizontal beam size at IP is necessary. Low emittance, small horizontal beta function at IP

Design Concept of SuperKEKB /6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 6 To reduce the construction costs  Use the KEKB tunnel  Use the components of KEKB as much as possible. Preserve the present cells in HER. Replace dipole magnets keeping other main magnets in LER arcs. Other features  No option for polarization at present.  Changing beam energy: 3.5/8.0 -> 4.0/7.0 GeV (e+/e-) LER : Longer Touschek lifetime and mitigation of emittance growth due to the intra-beam scattering HER : Lower emittance and lower SR power

Comparison of Parameters between KEKB and SuperKEKB 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 7 KEKB Design KEKB Achieved : with crab SuperKEKB Nano-Beam Energy (GeV) (LER/HER)3.5/ /7.0  y * (mm) 10/105.9/ /0.30  x * (mm) 330/ /120032/25  x (nm) 18/1818/243.2/5.3  y  x (%) 10.85/ /0.24  y (  m) /0.062 yy / /0.081  z (mm) /5 I beam (A)2.6/ / /2.6 N bunches Luminosity (10 34 cm -2 s -1 )

Outline of Upgrade to SuperKEKB 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 8 TiN-coated beam pipe with antechambers Colliding bunches Damping ring Low emittance gun Positron source New positron target / capture section Low emittance electrons to inject Low emittance positrons to inject New beam pipe & bellows Belle II New IR New superconducting /permanent final focusing quads near the IP e- 7 GeV 2.6 A e+ 4 GeV 3.6 A Redesign the lattices of both rings to reduce the emittance Add / modify RF systems for higher beam current Replace short dipoles with longer ones (LER) SuperKEKB

New Beam Pipes for SuperKEKB To cope with the electron cloud issues and heating problems, antechamber type beam pipes are adopted with a combination of TiN coatings, grooved shape surfaces and clearing electrodes. Beam NEG pumps Concept  LER arc section: Beam pipes are replaced with new aluminum-alloy pipes with antechambers. (  2000 m)  HER arc section: Present copper beam pipes are reused. Since the HER energy is reduced from 8.0 to 7.0 GeV, SR power at normal arc section is more or less the same as KEKB.  Wiggler section (both ring): Copper beam pipes with antechambers are used. SR Arc section (aluminum) Wiggler section (copper) 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 9 by courtesy of Y. Suetsugu

Beam pipe with antechamber Features of new beam pipes with antechamber  Small effect of photoelectrons, low beam impedance, low SR power density  The cross section should fit to the existing magnets.  Aluminum alloy is available for LER arc section due to low SR power. Copper is required for wiggler section and HER.  NEG strips are installed in one antechamber isolated by the screen for RF shield. (arc section) Feed-through Screen (Φ4mm 、 6mm pitch) NEG strip t 6 mm Q magnet 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 10 by courtesy of Y. Suetsugu

Flange, Bellows and Gate Valve Flange, bellows and gate valve applicable to antechamber scheme were also developed. Bellows chamber RF-shield (gate valve) Gate valve Cu-alloy flange (CrZrCu) Al-alloy flange (A2219, A2024) RF-shield (bellows) 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 11 by courtesy of Y. Suetsugu

Countermeasures against Electron Cloud Effect Electron cloud instability can be a serious problem for LER (e+)  The threshold of electron density to excite the head-tail instability is  1.6×10 11 e - /m 3.  By using these countermeasures, the average electron density on the order of e - /m 3 will be obtained.  Various mitigation techniques were evaluated at KEKB LER. SectionsL [m]L [ %]CountermeasureMaterial Total Drift space (arc)1629 m54TiN coating + SolenoidAl (arc) Steering mag.316 m10TiN coating + SolenoidAl Bending mag.519 m17TiN coating + Grooved surfaceAl Wiggler mag.154 m5Clearing ElectrodeCu Q & SX mag.254 m9TiN coatingAl (arc) RF section124 m4(TiN coating +) SolenoidCu IR section20 m0.7(TiN coating +) SolenoidCu or ? 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 12 by courtesy of Y. Suetsugu

Electron cloud mitigation 1 Antechamber Antechamber is effective to mitigation of photoelectrons which can be source of the electron cloud. 1/1284/3.07 (1284) 6~8 ns spacing R = 4 7 mm (Circular) V r =  30 V Ph = 8  Ph/s/m/ms With antechamber Circular chamber Effect of antechamber ~1/5 ~1/100 Rough surface at the side wall (Ra  20) reduces the photon reflection. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 13 by courtesy of Y. Suetsugu

Electron Cloud Mitigation 2 Solenoid Field It was confirmed that the solenoid field at drift section (50 G) is effective to both photoelectrons and secondary electrons. B = 0 G B = 50 G 8/100/2 (800) 4 ns spacing R = 47 mm (Circular) <1/ /6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 14 by courtesy of K. Kanazawa

Electron Cloud Mitigation 3 TiN Coating TiN coating is effective to reduction of the secondary electrons. It was confirmed that TiN coated surface has a same property irrespective of base material. Al Cu Al + TiN Cu + TiN 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 15 by courtesy of K. Kanazawa

B by L. Wang et al. RtRt d (Roundness) (Depth) Electron Cloud Mitigation 4 Grooved Surface (in Bending Magnet)  It was tested in KEKB and CesrTA.  It is expected to reduce the electron density by factors.  It can be formed by extrusion method.  In SuperKEKB LER, it will be used with TiN coating.  Grooved surface with TiN coating will be also adopted for positron damping ring. Valley : R0.1~0.12 Top : R0.15 Angle : 18~18.3° Grooved surface in the bending magnet can reduce effective SEY structurally. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 16 by courtesy of Y. Suetsugu Beam pipe (SuperKEKB LER) Beam pipe (Damping ring)

Electron Cloud Mitigation 5 Clearing Electrode (in Wiggler Magnet) Clearing electrode attracts the electrons by electrostatic field.  Very thin electrode was developed. (0.1 mm tungsten on 0.2 mm Al 2 O 3 )  It was tested in KEKB and CserTA.  It is expected to reduce the electron density around beam up to  1/100. Electron density Electrode (+) L. Wang et al, EPAC2006, p V +75 V 0 V ~3kV/m Antechamber Beam channel (  90mm) 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 17 by courtesy of Y. Suetsugu

Electron Cloud Mitigation 5 Evaluation on Groove and Electrode Effectiveness of the grooved surface and the clearing electrode was evaluated at KEKB LER. TiN-coated flat surface Grooved surface (  ~20  ) Clearing electrode 1/6~1/10 ~1/10 TiN Groove Clearing electrode 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 18 by courtesy of Y. Suetsugu

TiN Coating Facility 1 We have to coat  1100 beam pipes within 2 years.  TiN coating tests had been performed and the coating method was established. TiN coating is done by a DC magnetron sputtering of Ti in Ar and N2 atmospheres.  A Ti cathode rod (-400 V) is hung from the top on the center axis.  Gases are supplied into the beam pipes uniformly though the Ti rod.  Magnetic field (16 mT) is supplied by a solenoid coil. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 19

TiN Coating facility 2 TiN coating facility for large-scale production are under construction now.  5 vertical equipments for straight beam pipes.  3 transverse equipments for bent pipes (of which one is test station).  Two line of the beam pipes can be mounted side-by-side in one equipment.  Beam pipe with a length up to 5 m can be coated.  Combination of hot-air oven and circulators are adopted to avoid the trouble of having to cover and uncover the aluminum foils and insulators. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 20

TiN Coating facility 3 magnetic field in solenoid coils Target value 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 21

TiN Coating facility /6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 22

TiN Coating facility 4 Coating test is about done.  Coating on the beam pipes will be started in this month.  1100 beam pipes will be coated within 2 years by this facility. Now coating (view from the bottom) 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 23

Construction works are undergoing now. Fabrication of beam pipes:  LER beam pipes are being made on mass production lines. Baking of beam pipes (after coating):  All beam pipes will be baked with a temperature up to 150  C at the laboratory before installation.  To cope with the large number of beam pipes (  1200), hot-air oven is used.  Baking works started in April. (Output : 6-8 pipes/week at present) Installation of beam pipes:  Installation works will start in the second half of this year. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 24 by courtesy of Y. Suetsugu

Summary Construction works of SuperKEKB are going on now.  Commissioning of SuperKEKB will start in the second half of FY2014. Almost all LER and part of HER beam pipes become new.  To cope with the electron cloud issues and heating problems, antechamber type beam pipes are adopted. As the countermeasures against the electron cloud, various mitigation techniques are adopted.  Solenoid field  TiN coating  Grooved surface  Clearing electrode TiN coating are done in KEK Tsukuba site.  Coating facility are under construction now.  Coating test is about done and coating on the beam pipe will start this month. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 25

END Thank you very much for your attention. 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 26

Backup 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 27

Backup 2012/6/6 ECLOUD’12 (the 5 th electron-cloud La Biodola (isola d’Elba) Italy 28