PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.

Slides:



Advertisements
Similar presentations
Cisco 6500 E-Series Chassis Up-grade
Advertisements

Enrique Calvo Alamillo Madrid 1 March Index: 1.Proposal for a DHCAL m3 module. 2.Numerical simulations for a m3 module. 3.Extrapolation of the m3.
Goals : 1- To conceive and build a self-supporting mechanical structure. 2- The concept can be extended to ILD and SiD 3- Keep cost as low as possible.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
ACADs (08-006) Covered Keywords Lab ware, glassware, balances, heating apparatus, separation apparatus, hydrometers, viscometers, pipettes, titrators,
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Effective Meetings March 1, 2011 University Libraries.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
PMT Survey Summary Enrique Calvo Alamillo Chooz 10 February 2010.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
PMT Support Structure. Final Design. Enrique Calvo Alamillo KOBE - 3 March 2008.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Imad Laktineh (in behalf of Enrique Calvo Alamillo) Arlington 11 March 2010.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
2 October 17 th, AACHEN. Double Chooz collaboration meeting. CIEMAT.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Readiness of the FOS monitor for DESY’s thermo-mechanical mock-up. Kloster Seeon, May 19 th DEPFET Workshop D. Moya, I. Vila, A. L. Virto., J.González.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Planning for Proto-DUNE PD Installation and Cabling at CERN
Teleconference ACS – FREIA 31th May 2017
QXF Coil Fabrication & Tooling Reaction / Impregnation
CLEAN UP & INSPECTION.
Enrique Calvo Alamillo DAEGU
Status of the Mechanics at Ciemat.
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
News about the WA104 Programme
Teleconference ACS – FREIA 10th May 2017
Mechanics: (Tim).
Buffer CABLES routing proposal
PMT system production, QA and installation
Test box for ProtoDUNE SP – Integration Test
ارگونومی کار با کامپیوتر
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
The computer laboratory
WA105: Order Status IFAE Thorsten Lux.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Polarized 3He target installation
Presentation transcript:

PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009

PMT Buffer cylinder distribution Vertical and circular rails to be fixed to the buffer base and wall (prior PMT installation). Installation test will be performances at Ciemat’s workshop next week. Only for the cylinder wall. 3 different vertical rails disposition. 10 angular PMT orientations. x Z

Mock-up at CIEMAT Ready for testing all installation procedures. -Possibility of 3 different rails disposition. -Several possible Us orientations.

PMT installation meeting. 2 day meeting: March. At 10:00. (At 9:45 Building 56 to do the check-in) Details about registration, accommodation and access to CIEMAT was sent by Ines Gil by . Details of the meeting room for the first and second day.

First day: Meeting room. Building 56: Check-in to obtain a ID Card.

Second day: Meeting room. Building 56: Check-in to obtain a ID Card.

PMT installation meeting at CIEMAT First day: Practical installation of one PMT using the mock-up: Fix vertical rails to the structure. For the different three vertical position. Fix stainless steel Us fixation pieces to the PMT. Fix PMT on the vertical rails. Routing of cable. Passing cable through flanges. Connection of cables to splitters. Check PMT positions and labels (installation data base). Installation of slow control devices. Installation of LEDs and fibre routing. Fix/Remove photogrammetric marker holders to PMT. Definition of tools, equipment, people needed for every step, estimated time, procedures, etc. to perform previous tasks.

PMT installation meeting at CIEMAT Second day: Discussion on open items: Details of scaffolding to perform previous tasks Cleanliness issues Definition of tasks before PMT installation (PMT storage, changing room, PMT transportation inside the lab, pre testing, lowering PMTs into the pit, installation data base) Definition of tasks after PMT installation (PMT covering, PMT testing, uninstall the clean tents…) Preparation of documents: internal documents for PMT installation, document for kick-off meeting with EdF… Installation of top lid PMTs Other things?