Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional.

Slides:



Advertisements
Similar presentations
Digital Ship at Posidonia June 2006 in Association with AMMITEC CBM
Advertisements

Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Complete Event Log Viewing, Monitoring and Management.
This document and any attachments contain proprietary information and are the sole and exclusive property of Mitsubishi Power Systems Americas, Inc., MPSA.
How To Leverage Your Data? Presented by Michel Ruel, Top Control Inc. 1.
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
PI AF 2.1 and PI MDB Upgrade Laurent Garrigues, Product Manager Satyam Godasi, Sr. Software Developer.
PSE&G Condition-Based Maintenance
Complete Event Log Viewing, Monitoring and Management.
CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming.
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 How PI Notifications ensures that SmartSignal’s.
Copyright © 2003 OSI Software, Inc. All rights reserved. Reliant Resources Fleet Wide Deployment of PI By : David A. Thomason Joseph W. Milton, PE.
What is a Good SmartSignal Model?
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
© 2008 OSIsoft, Inc. | Company Confidential IT Application Monitoring Using PI AF and Notifications Josiah Thoen - AEP.
Chevron’s Power Performance Monitoring Solution
Chapter 19: Network Management Business Data Communications, 4e.
IntelliGrid: Enabling The Power Delivery System of the Future Don Von Dollen EPRI IntelliGrid Program 9th International Symposium on Power- Line Communications.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Enhancing Paper Mill Performance through Advanced Diagnostics Services Dr. BS Babji Process Automation Division ABB India Ltd, Bangalore IPPTA Zonal Seminar.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Unrestricted © Siemens AG All rights reserved.siemens.com/asset-analytics Machine Tool Analytics Plant Data Services.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
 Network Management  Network Administrators Jobs  Reasons for using Network Management Systems  Analysing Network Data  Points that must be taken.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Vibration Monitoring & Machine Protection Systems Copyright 1999, Frank Howard, STI Vibration Monitoring, Inc. League City, Texas USA Reciprocating.
Ron Helson HART Communication Foundation Austin, TX
You will be responsible for professional and technical work related to network and telecommunications solutions (Local Area Network/ Wireless, Wide Area.
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
1130 Application of ALM to a Multi-Faceted Project Miroslav Novak Systems Engineer Borland Canada.
DBS201: DBA/DBMS Lecture 13.
© 2008 OSIsoft, Inc. | Company Confidential Analytics and Notifications Michael Hesselbach Beth McNeill Michael Hesselbach Beth McNeill.
Fleet Performance and Reliability in Generation Utilities
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
© 2009 IBM Corporation Smart Grid Research Consortium Customer Operations Transformation Global E&U Industry January 2011.
© 2006 Avaya Inc. All rights reserved. Avaya Services Michael Dundon Business Development Manager.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Windrock... A Dover Company
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
TELVENT IT for a Sustainable and Secure World Alarm Management Gregory Bogle Business Development Manager – Europe Telvent – Oil and Gas Division – EMEAA.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
Time lag between discovering issue and resolving Difficult to find solutions and patches that can help resolve issue Service outages expensive and.
PI Trickles Down At the Water District Emile Richard Portland Water District Portland, Maine.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Real Time Financial Analysis in Process Plants (Energy and Performance Information System)
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
Analysis Framework PI AF 2.0 Foundation Project
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
June 2015 Unrestricted © Siemens AG All rights reserved. Page 1siemens.com/asset-analytics Machine Tool Analytics Plant Data Services – Asset Analytics.
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
Be in the know Visual Intercept Project from Elsinore Technologies David Hershman Regional Sales Manager
Putting Performance in Context Keys to Closing The Performance Gap Maureen Coveney, OSIsoft Todd Spencer, SmartSignal Michael Saucier, Transpara.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Standards Certification Education & Training Publishing Conferences & Exhibits ISA Division Symposia and Technical Conferences.
Implementing eMaintenance using i SCADA technology for Wisma Persekutuan Melaka By Nurhaizan JKR Mekanikal Melaka Case Study Published by permission and.
Presented by Jon Pastuszynski, Lead M&D Engineer
Evolution of SAM in an enhanced model for monitoring the WLCG grid
Fans & Heaters technical seminar
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Automation Committee Workshop Presentation 2
Managed Content Services
Topics Introduction & Background Elements of Analyzer Reliability
Presentation transcript:

Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional

Caterpillar Electronic Data Condition Monitoring Service Utilize Electronic Equipment Data Proactively Reduce Unscheduled Outages through Early Warning of Pending Component Failures 2 Increase Productivity Limited Resources Stranded Data Remote Sites Unattended Operation Limited Site Expertise More Complex Equipment

Background – B.P. (Before PI) Proof of Concept – Find Exceptions In Data –SmartSignal Epi-center –Validated non-parametric, multi-variate method Gaps Identified with Other Processes –Robust Data Management System to Achieve High Velocity, Scalable Solution –Additional Analysis Tools to Determine Root Cause –Effective 2-way communication between Analyst and Site Personnel is critical to cycle time and accuracy of recommendations –Quick access to related data to reduce cycle time. Events and Diagnostic Messages Component History Planned Maintenance –Automate, Automate, Automate 3

PI System Role – Initial Plan 4

Current Implementation 5

Discovered Benefits An Analytics Complement EPI-center for slow developing issues PI System for short duration, intermittent issues EPI-center for identifying unknown or obscure relationships PI System for Notifications of identified relationships 6

Discovered Benefits PI AF - Security –Network –Data PI AF - Scalability 7

Discovered Benefits Connectivity Flexibility –Cell –DSL –Customer Network –PI-to-PI Interface –Other Historian to PI System 8

Component History & KPI’s 9

The Value of High Fidelity Data Are these trends from different processes? 10 Maybe Not!

11 Events & Diagnostics TimestampCodeDescription 27-Nov-11 21:11:071045Low Intake Manifold Pressure 27-Nov-11 21:11:22242Engine Overload 27-Nov-11 21:12:02411Cylinder #11 Detonation The Value of High Fidelity Data - Transients 1-minute scan rate Provides some insight of events 1-second scan rate Provides more detail of process variability Exposes “missed” events

Link Engine Alarms to Engine Conditions 12 The Value of High Fidelity Data - Transients

Event begins and ends in 3 minutes! 13 Desired Air Pressure (Red) is less than Actual (White) Engine Commands Wastegate (Blue) to close Air Pressure Not Increasing Command Now Full Closed Low Pressure Alarm Active Increasing Air Pressure Indicates Wastegate has Closed Low Pressure Alarm Active Increasing Air Pressure Indicates Wastegate has Closed The Value of High Fidelity Data - Transients Engine Indicated Load Peaks (Cyan) and Overload Fires Conclusion Driven Equipment was not overloading engine. Event was related air management system. Recommendation to Service Provider: Inspect/Repair at next scheduled Shutdown Wastegate Bushings Linkage Actuator

Derived Data Making Data More Meaningful – PI Totalizers 14 Raw Data Combustion Time Raw Data Combustion Time Processed Data Misfire Processed Data Misfire Derived Data Visualization of Raw Data May Not Provide Much Insight A Different View of the Data May Provide Better Insight.... For example Lizard in a Pond.... Raw Data of JPEG Lizard in a Pond.... Processed View of JPEG

Data Enhancement Noisy Signal will delay persistence condition for EPI-center 15 Filtered Signal Improves visualization and analysis

Data Enhancement Improve Model Fidelity and Reduce Model Maintenance Process Gas Suction Temperature varies by day and by season 16

Signal Processing Temperature ratio is a function of Pressure Ratio Using Temperature Ratio Function Reduces Model Maintenance and Improves Visualization. 17 Cylinder #1 Suction Valve Repaired Cylinder #3 Discharge Valve Repaired Cylinder #1 Suction Valve Repaired Cylinder #3 Discharge Valve Repaired Cylinder #5 DischargeValve Repaired

Operator Engagement Operator Engagement Reduces Cycle Time and Errors Visuals Improve Operator Knowledge Increased Operator Knowledge builds Trust 18 Operator changed Air Inlet Filter with Engine Running

Filling the Gaps Robust Data Management System to Achieve High Velocity, Scalable Solution –The PI System –AF Additional Analysis Tools to Determine Root Cause –ProcessBook –PI DataLink –Performance Equations –ACE Calculations –PI Totalizers Effective 2-way communication between Analyst and Site Personnel is critical to cycle time and accuracy of recommendations –PI WebParts Quick access to related data to reduce cycle time. –Events and Diagnostic Messages PI ProcessBook, PI Notifications –Component History – AF, PI WebParts –Planned Maintenance Automate, Automate, Automate –Continuous Data Feed From Site to Analytics Modeling – PI System –Adding Assets - AF 19

Parting Thoughts – What We’ve Learned The PI System’s Emerging Role –It is THE Core, Central Time-Series Data Management Tool –It is a Critical Analytics Element Events & Diagnostics Can Be Valuable Leading Indicators Well Constructed Visualizations Improve Understanding of Events Every “Save” Counts 20

21 David Krenek Market Professional Petroleum Group Caterpillar, Inc Northwest Freeway Suite 1010 Houston, Texas Brought to you by