Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED CREATING A SIMPLE PROCESS.

Slides:



Advertisements
Similar presentations
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
Advertisements

Program Management Portal: Overview for the Client
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
Page 1 of 36 Respective of PNG Tenure Regulation Sections 19 to 23; when Crown land is leased without a producing well and is being drained by a freehold.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Copyright 2007, Paradigm Publishing Inc. POWERPOINT 2007 CHAPTER 1 BACKNEXTEND 1-1 LINKS TO OBJECTIVES Create Presentation Open, Save, Run, Print, Close,Delete.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Tutorial Holdings Management Adding, Editing, and Assigning Full Text Finder Links support.ebsco.com.
Program Management Practice Program Management Portal: Overview for the Client © 2011, 2015 BM Corporation 1.
This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation. All.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
Page 1 of 23 The FMT system utilizes Roles to determine ownership and levels of responsibility within the FMT system. The Well Licensee/Unit Operator is.
Lesson 5: Using Tasks, Notes and the Journal
Business Optix Library Service – Workflow
Page 1 of 53 The Work In Progress functionality of Transfers enables you to retrieve a transfer request, view/change the request status depending on your.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
PRIOS ARA Limited Agent User Instructions PRIOS ARA Limited Agent User Instructions Professional Repossessors Interactive Operating System.
Advanced User Guide to Outlook and all its features.
Creating a Web Site to Gather Data and Conduct Research.
Microsoft Outlook 2010 New Features. Improved Interface “The Ribbon”
SOML Issue Tracking Guide to using the new ETSEDMS server for Issue Tracking.
1 of 8 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
SCHOOLOGY. Click on Sign Up Choose Instructor Fill Out Form / Register o Use SCHOOL address Fill in Country / State / and type.
Training Guide for Inzalo SOP Users. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP applications. The scope of this.
IFORM ACCOUNT MAINTENANCE ICT4D SESSION 4. IFORMBUILDER WEBSITE REQUIREMENTS To access the iFormBuilder website, you need the following items: -Reliable.
My Workspace ELearning in Sakai Randy Graff, PhD HSC Training.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
CSC350: Learning Management Systems COMSATS Institute of Information Technology (Virtual Campus)
Training Guide for Inzalo SOP Posting. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP Posting applications. The.
Table of Contents TopicSlide Administrator Login 2 Administrator Navigations 3 Managing AlternativeDr.com Blogs 4 Managing Dr. Lloyd May Blogs 5 Managing.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
Securing and Sharing Workbooks Lesson 11. The Review Tab Microsoft Excel provides several layers of security and protection that enable you to control.
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
MS 365 Student Accounts Orientation Beavercreek High School.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED BUSINESS PROCESS MANAGEMENT CONCEPTS.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
Munis Version 9.1 & 8.3 Sneak Peek System Administration.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED INTEGRATION.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED INTERSTAGE BPM API DEVELOPMENT.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED ADVANCE FEATURES.
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
TITLE ClubRunner for Webmasters & Editors Home Page Stories, Site Pages Events and Speakers Communications and eBulletins.
How to Create eInvoices in SCP-RR Training Presentation for Supply Chain Platform: Rolls-Royce January 2016.
Create eInvoices Training Presentation for Supply Chain Platform: Rolls-Royce February 2014.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED INTERSTAGE BPM CONSOLE.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED FORMS.
PCard Training Logging into the new PCard (PaymentNet) System: * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED ADDING DETAILS TO PROCESS MODEL.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED ADMINISTRATION.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED INTRODUCTION TO INTERSTAGE BPM.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
SCC P2P – Collaboration Made Easy Contract Management training
Studio modeling basics
Business rules.
eInvoice Business Process
About SharePoint Server 2007 My Sites
Review Committee Chair Instructions
Employee Self Service (ESS) Administration Version 2.20.
Using K2 applications How can users interact with K2 applications?
To the ETS – Encumbrance Online Training Course
Online Training Course
To the ETS - Offset Notice Response Training Course
To the ETS – Encumbrance Online Training Course
Presentation transcript:

Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED CREATING A SIMPLE PROCESS

Interstage BPM v11.2 2Copyright © 2010 FUJITSU LIMITED Outline ■ Create Workflow Application ■ Model "Loan Application Process" ■ Assign Roles to Loan Application Process ■ Define User Defined Attributes (UDA) ■ Generate Process Definition Documentation

Interstage BPM v11.2 3Copyright © 2010 FUJITSU LIMITED Process Steps 1.Customer applies for a loan at the bank branch 2.Loan Application and possibly an electronic copy (pdf attachment) of the application is sent for processing 3.Credit Check is performed 3.Welcome pack is mailed including legal documents and bank policies, (this could be a Compliance requirement) 4.Loan officer is assigned to review the loan application 5.Loan officer either approves or rejects the loan 6.If rejected, send out a rejection letter 7.if loan is approved, create Loan account and transfer funds 8.Send to Loan Agent that the loan was approved

Interstage BPM v11.2 4Copyright © 2010 FUJITSU LIMITED Loan Application Data Elements ■ Customer first and last name ■ Address ■ Loan Amount ■ Type of loan, personal or business ■ Purpose of loan ■ And More….

Interstage BPM v11.2 5Copyright © 2010 FUJITSU LIMITED Roles in Loan Application ■ Roles defined Loan Agent Loan Officer Customer Service

Interstage BPM v11.2 6Copyright © 2010 FUJITSU LIMITED Loan Application BPD

Interstage BPM v11.2 7Copyright © 2010 FUJITSU LIMITED Create Workflow Application ■ Create a new project Application “Workflow Application” Process definitions and all related files are packaged together Files packaged as a BAR file Loan_Business_Processes

Interstage BPM v11.2 8Copyright © 2010 FUJITSU LIMITED Workflow Application Description ■ Enter a Description ■ Leave Owner Blank

Interstage BPM v11.2 9Copyright © 2010 FUJITSU LIMITED Workflow Application Layout ■ Workflow Application contains designated folders Workflow Application Structure

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create Process Definition Select Workflow project 2.Navigate “New  Process Definition”

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create “Apply for Loan” Business Process ■ Enter name and description of Business Process “Apply General Loan”

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Model Process Definition ■ Model the “Apply General Loan”

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Adding Nodes and Properties ■ Name – name of activity ■ Description – description of the process step (this is added in notification) ■ Role – the group assigned to carry out the work

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Configure Activity Node ■ First step in processing loan – “Enter Loan Application” ■ Work will be performed by a Loan Agent

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Adding Annotations ■ Add annotations for documenting information related to process model. ■ Documentation can also be provided in description, but Annotations are visible on the process model

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Connecting Nodes ■ Connect nodes with arrows Click on the From node and drag to the To node. Change arrow name to resemble the choices the user will make during the process execution Example: “Accept” or “Reject” a loan application

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Parallel Tasks ■ Parallel processing after Loan Application is submitted "Credit Check” and “Mail Welcome Pack” tasks are performed in parallel

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Add Swim lanes ■ Add Swim lanes to highlight areas of responsibility ■ Swim lanes can run either vertically or horizontally ■ Swim lanes add structure to diagrams Bank Branch Loan Dept Customer Relations

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Add Swim lanes ■ Add Swim lane by selecting Swimlane from palette and drawing the Swimlane on the BPD ■ Change Direction of the Swimlane by placing the title on top or left

Interstage BPM v Copyright © 2010 FUJITSU LIMITED User Defined Attributes ■ Add UDAs StringfirstName, lastName, address BigDecimalloanAmt Booleanpersonal (default - true) Stringreason

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Generate Process Documentation ■ Generate Process Documentation Feature available in Interstage BPM Studio ■ Generates a simple report of a Process Definition ■ Supported Report formats PDF Html MS PowerPoint

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Apply General Loan Documentation

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Completed Business Process ■ “Apply General Loan” Business Process Diagram (BPD)

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Deploying Workflow Application ■ Deploy Workflow Application Upload Business Process Definitions and related files and resources to Interstage BPM Server

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Deploy Application ■ Select Upload Application Choose Server Connection

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create Server Connection ■ Create New Sever Connection Connection Name Base URL User name and Password

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create Server Connection Settings ■ Connection Name: “Admin on Test Box” ■ Base URL: /console/_wfxml/ /console/_wfxml/ e.g. “ ■ User name and Password Admin user access is required to deploy

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Select Server Connection ■ Select Server Connection “Admin on Test Box”

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create or Update Workflow Application ■ Create Workflow Application ■ Update Workflow Application

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Interstage BPM Console ■ Administer Workflow Application using the Interstage BPM Console

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Interstage BPM Console ■ Select Workflow Application Loan_Business_Processes

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Application Selection ■ Change Application Selection Select Application Dropdown

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Creating Users and Groups ■ Prior to executing a Business Process ensure all roles exist on the server ■ Business Process “Apply General Loan” needs these roles Loan Agent Loan Officer Customer Service

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Create Roles (groups) ■ Select “System Administration” Tab ■ Select Groups ■ Click “New Group”

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Group Details ■ Enter Group Details Name Description

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Loan Example Groups (roles) ■ Groups required for Loan example

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Adding Users ■ Select Users Tab ■ Click New User

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Enter User Details ■ Enter User Id, Password (min 8 chars and 1 numeric) ■ Assign Group

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Loan Example Users ■ Users required for Loan example user1 – Loan Agent Role user2 – Loan Officer Role user3 – Customer Service Role

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Start Bank Loan Application ■ Start Loan_Business_Processes Workflow Application ■ Initial State is Offline ■ Click Start Button to change to Online State

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Definitions ■ Navigate to Process Definitions Section Process Management Tab

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Definitions ■ Select Process Definitions Tab ■ Business Process Definition List

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Start Process Definition ■ Start (execute) “Apply General Loan” Process Definition ■ Right-Click on Process Definition ■ Click Instant Start

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Instance Status ■ Change to My Process Tab ■ Check the status of running business processes

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process User Login ■ Log-in as user1 – member of Loan Agent Group

Interstage BPM v Copyright © 2010 FUJITSU LIMITED User1 Tasks ■ Login as user1 member of Loan Agent Group ■ Tasks for user1 are displayed Allowing for quick and easy access to workflow

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Performing Work - Details ■ Change to Details Tab ■ Form displays UDA values for the workitem

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Performing Work – Details ■ Make Choice – Submit Loan Application

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Making a Choice ■ “Review Loan” activity choices are "Approve" or "Reject" ■ Loan Officer decides to either Reject or Approve the Loan Request ■ Make Choice displays the Arrows defined in the Process Definition.

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Reviewing the Status as Process Owner ■ Login as Process Owner ■ Select the “Apply General Loan” process instance completed

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Definition – System Attributes ■ Essential attributes of a process definition Name - the name of the process definition Title - the title of the process definition Description - what the business process represents Process owners - who will be in charge of monitoring this process Version - the version of the process definition State

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Definition Version and State ■ New process definitions are automatically assigned a version number of 1.0, e.g. “Purchase Order 1.0”. ■ Any update to PD results in a new version ■ Process Definitions state defines where the process is, in its lifecycle Definitions are by default in draft state Definitions should be published in production environment Published definitions cannot be edited

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Definition - Version and State Version State

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Instance States ■ A Process Instance transitions through many states during it’s life cycle. These states are: Initial When a process instance is created, it is in “Initial” state until it is started. Running When a process instance is started, it transitions to “Running” state until it is completed or suspended. Completed When a process instance normally exits, it reaches “Completed” state.

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Process Instance States ■ Suspended State Process instance can be suspended during the course of execution. Suspending a process instance temporarily removes it from the running state. Any active work items or running sub-processes are also moved to suspended state. Suspended process instance cannot be modified. The process definition from which the suspended process instance was created, also cannot be modified. ■ Resume/Reactivate Resuming a suspended process instance activates it and state is changed to “Running”. Any work items and sub processes are also activated.

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Task Assignment ■ Activities need Role name as assignee ■ Roles are “groups” of users with specific attributes, qualifications or authority (e.g. accountants, managers). ■ Roles are resolved to members/users at runtime for task assignment. ■ Work Items are created when the Process Instance reaches an Activity node. ■ Individual work items for each member/user in the role is created ■ Only one user can work on the task

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Role Resolution Role resolution Role - Managers Mike Cindy John Members

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Work Item Creation When a member of the group marks the work item as complete it disappears from the worklist of all members of the group Mike Cindy John Start Exit Request Purchase Employee Manager Approve / Reject Start Exit Request Purchase Employee Manager Approve / Reject Start Exit Request Purchase Employee Manager Approve / Reject Managers Approve/ Reject Mike Approve/ Reject Cindy Approve/ Reject John Work items DONE ! Start Request Purchase Employee Exit Approve/ Reject Manager

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Performing Work ■ Users select which tasks to work on ■ Task Options (Accept, Reassign,Decline)

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Work Item Operations ■ Assigned user can perform these actions: Make Choice (Complete) Under the Choices tab the names of all of the outgoing arrows from the activity node are displayed Selecting one of these will close the work item and the process will proceed forward along the selected arrow. Save Saves any changes in the work item Accept This assigns the work item to the user No other assignee will be able to update the work item Reassign- reassigns the work item to another assignee Decline- to decline the work item.

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Reassign Task ■ Tasks can be assigned to another user or users if required Assigned user is not available to work on the task Information from another user is required to complete the task ■ On Reassign, task is removed from original assignee’s queue and assigned to new user/users. ■ Assignment Mode Setting Regular Mode – activity assignees or process instance owners can reassign Process-Instance-Only – only process instance owners can reassign No-Reassignment – reassignment is not allowed

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Reassign Task ■ Reassign Task to group or a specific user(s)

Interstage BPM v Copyright © 2010 FUJITSU LIMITED Work Item States ■ Active – assigned to user or users ■ Read - has been viewed by the current user ■ Accepted - accepted by the current user and therefore unavailable (inactive) to other users in that role ■ Declined - current user has declined the work item ■ Inactive - another user has accepted this work item so it is unavailable for the current user ■ Completed

Interstage BPM v Copyright © 2010 FUJITSU LIMITED