LLRF installation and commissioning at the European XFEL. Status report and outlook Julien Branlard, for the LLRF team Low Level Radio Frequency Workshop.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
1 STF-LLRF system and its study plan Shin MICHIZONO (KEK) LCWS12 STF-LLRF Outline I.STF system configuration S1-Global (~2011 Feb.) Quantum Beam (QB) (2012.
Lorentz force detuning measurements on the CEA cavity
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Precision regulation of radio frequency fields at FLASH Christian Schmidt for the LLRF & LbSyn team LLRF workshop
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Low Emittance RF Gun Developments for PAL-XFEL
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Anders Sunesson RF Group ESS Accelerator Division
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Wojciech CICHALEWSKI, DMCS_TUL, Seminarium KMiTI LLRF in FEL System sterowania parametrami fali stojącej z zakresu częstotliwości mikrofalowych.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
John Carwardine January 16, 2009 Some results and data from January studies.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
LLRF developments at DESY Holger Schlarb on behalf of the LLRF team LLRF Workshop 2015 Shanghai,
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
ESS LLRF and Beam Interaction
Cost Optimization Models for SRF Linacs
Areal RF Station A. Vardanyan
MicroTCA Development and Status
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
LLRF Research and Development at STF-KEK
E-XFEL Status and First Beam Results
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
LLRF systems status update
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Functionality Stefan Simrock How to edit the title slide
XFEL cavities and cryomodules measurements at AMTF
WP02 PRR: Master Oscillator and RF Reference Distribution
CW Operation of XFEL Modules
LLRF and Beam-based Longitudinal Feedback Readiness
CEPC RF Power Sources System
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
RF introduction Anders Sunesson RF group leader
Summary of the maximum SCRF voltage in XFEL
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

LLRF installation and commissioning at the European XFEL. Status report and outlook Julien Branlard, for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai, P.R.China, Nov. 3-6

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 2 TALK OVERVIEW > Introduction  European XFEL accelerator  LLRF architecture for XFEL  Schedule, team > Installation  Steps  Experience and problems > Commissioning  Warm  Cold

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 3 DE FR RU IT (72.7%) (6.4%) (5,9%) (7,7%) INTRODUCTION: European XFEL 3.4 km source: The European X-ray Free Electron Laser  17.5 GeV light source, Hamburg, Germany  TESLA superconducting 1.3GHz RF cavities  1.4 msec pulses at 10 Hz  e- beam 1.35 mA nom mA max  2016: construction / commissioning  2017: first user operation DE Hamburg

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 4 INTRODUCTION: LLRF for XFEL > LLRF: DESY in-kind  26 RF stations (808 cavities, 101 cryomodules)  MicroTCA.4 LLRF system, master / slave  Vector sum (32 cavities) RF control  2 piezo per cavities (1kHz tuning)  Motorized cavity tuners  Motorized Q L, one-time fixed power ratios KLYSTRON CM1 (8 cav.) CM2 (8 cav.)CM3 (8 cav.) CM4 (8 cav,) LLRF master LLRF slave BEAM MicroTCA.4 supporting modules RF parameters:  Pulse length 1.4msec ( usec)  Q L = 4.6e6 (½ bw = 140 Hz)  10 Hz rep. rate  ΔA/A = 0.01% ΔΦ = 0.01 deg.

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 5 INTRODUCTION: SCHEDULE > Installation granularity: 1 cryostring (i.e. 12 cryomodules) A2 A6-8 A9-11 A12-14 A15-17A18-20A21-23 A24-26 A15-17A18-20A21-23 A24-26 A15-17A18-20A21-23 A24-26 COOL DOWN + COLD COMM. A1 A3-5 A2 A6-8 A9-11 A12-14 A1 CRATE RACK TUNNEL CRATE RACK TUNNEL 2 years 3 months

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 6 INTRODUCTION: SCHEDULE > Status 11/2015  ~ 60/100 modules tested  ~ 50 modules installed > LLRF installed  Injector  L1  Beginning of L3  Note: L2 (beg. next year) > Target date  Tunnel closes Fall 2016

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 7 INTRODUCTION: THE TEAMS > THE INSTALLATION TEAM > THE COMMISSIONING TEAM + large support from our Polish colleagues! Annika Bart KrzysztofUros Gohar Wojtek Christian Matthias Mathieu Sven Uros Valeri Wojtek Mariusz

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 8 INSTALLATION

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 9 INSTALLATION: STEPS1/5 > Incoming inspection a.Device labelling b.Database (KDS)

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 10 INSTALLATION: STEPS2/5 > Incoming inspection > Device test a.Dedicated test stand for selected devices b.Device is marked as tested / approved (sticker)

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 11 INSTALLATION: STEPS3/5 > Incoming inspection > Device test > Crate installation a.Selection of components from storage b.Upload configuration in database (KDS) c.Installation of firmware, servers d.Basic functionality checks  checklist MTCA

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 12 INSTALLATION: STEPS4/5 > Incoming inspection > Device test > Crate installation > Rack installation a.Rack preparation b.MicroTCA.4 crate installation c.Supporting 19” modules d.Inner-rack cabling CPIM LOGM DCM MTCA PZ16M PSM rack occupation plans cabling instructions

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 13 INSTALLATION: STEPS5/5 > Incoming inspection > Device test > Crate installation > Rack installation > Tunnel installation a.Cabinet transport b.RF cabling (outer rack) c.Connections to mains, water and Ethernet, fibers d.Commissioning checklist Ready for warm commissioning

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 14 INSTALLATION: The GOOD, the BAD and the UGLY Professional cabling (in & out) Rack Assembly and Test Area (RATA) MicroTCA Assembly Area (MASSA) Storage

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 15 INSTALLATION: The GOOD, the BAD and the UGLY Late module production “sharing” one piece of HW (e.g. uLOG, x2timer-RTM) installation of “dummy” modules (e.g. DCM, REFM) space holders for unproduced modules (e.g. PZ16M, redundant PSM) incomplete rack preparation (e.g. no cable duct) More work during commissioning…

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 16 INSTALLATION: The GOOD, the BAD and the UGLY Rack deformation Cooling units leaks Dust conditions

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 17 COMMISSIONING

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 18 COMMISSIONING: INJECTOR 3rd harmonic A1 LLRF GUN: commissioning since Dec 2013 A1: installation May 2015 AH1:installation Sep 2015 Injector:cool down Nov 2015 GUN Sep Feb First accelerated photo electrons at XFEL! 10 Hz repetition rate 20 bunches 2nC bunch charge preliminary results ~ 7 MeV May 2015

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 19 WARM COMMISSIONING > Commissioning of 1 RF station  Can be done in parallel with down-stream installation work  Several stations could be done in parallel  TUEV approval  Making RF in tunnel for the first time > 1 st time for system-level integration  Timing (master timing, klystron, modulator)  Machine protection system  RF reference distribution (master oscillator)  Servers (DAQ, diagnostics, middle layer…) > Warm coupler conditioning  Automated using FSM  Power calibration for forward and reflected signals  Exercise phase shifters (verify cabling and channel assignment) [ 2-3 people, 1 week ]

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 20 COLD COMMISSIONING – NO BEAM > LLRF commissioning [ 2-3 people, 3 shifts ]  Need to perform several stations in parallel (LLRF team) > Cavity tuning  Automatic scripts  Fine tuning cavities to resonance (motor + piezo)  Adjusting cavity bandwidth (Q L = 4.6e6) > Making gradient for 1 st time (in tunnel)  Signal level adjustment (atten. ADC range opt.)  Probe gradient pre-calibration using virtual probe (final calibration requires beam) > Parameters configuration  Based on AMTF measurements  Filters (notches 8pi/9, 7pi/9)  Limiters (gradient, controller output) > Basic controller operation for 1 st time  Feed-forward drive of the system, system identification, phase adjustments  MIMO feedback, learning feed-forward, output vector correction > Piezo operation for 1 st time > Middle layer servers >…>… Cavity resonance control Cavity bandwidth control TECHNICAL COMMISSIONING (WITHOUT BEAM) IS WHAT WE EXPECT WILL TAKE THE MOST TIME!

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 21 COLD COMMISSIONING – WITH BEAM > Step-wise commissioning (  beam dump) [ 2-3 people, 1shift ]  injector  up to BC1, BC2  whole linac > Short pulse bunch trains  ideal: MHz, 200pC, bunches  also OK: 1 MHz, 1nC, bunches > Beam-based calibration  Channel delay alignment  Vector sum calibration  Phase adjustment using phase shifters > Beam loading compensation (BLC)  scaling (calibration) of toroid signal for BLC  adjusting timing > Test of basic functionality of beam-based feedback  Start with I1.A1, L1 and L2  If energy measurement available  L3 > Study series at FLASH Determine beam phase using BAM Max energy gain Channel alignment

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 22 FLASH LLRF commissioning experience > Firmware  Jumping phases after initialization  LLL communication lost > Operation  Setting undesired values  Rebooting wrong system MCH > Automation  Malfunction of routines  Limiter adjustments > Infrastructure  Loosing Ethernet connection  Inter crate communication > Server  Crashes or malfunction Courtesy: C. Schmidt See talk from U. Mavrič

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 23 OUTLOOK: TOOLS and AUTOMATION > Scripts  to deploy new firmware / server version  to set up and check configuration files  to save and restore setups > Overview servers / panels  to quickly identify irregularities / help troubleshooting  to monitor health of subsystem  to get a snapshot of the machine status temp., fan speed, cpu load, radiation, etc...  to gather statistics (downtime, preventive maintenance) > Operation top-level tools  tuning / detuning cavities from/to parking position, taking a cavity out of VS  ramping up / down an RF station (RF-cryo)  switch between beam operation modes (Q L adjustments?)  energy monitoring (high beam loading or close to quench limit)

Julien Branlard | LLRF installation and commissioning at the European XFEL | | Page 24 QUESTIONS ? THANK YOU ! 谢谢 Xièxiè