Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 0 Recent results from R&D towards a vertex detector at the international.

Slides:



Advertisements
Similar presentations
Konstantin Stefanov, Rutherford Appleton Laboratory4 th ECFA-DESY Workshop, 1-4 April 2003p. 1 CCD-based Vertex Detector - LCFI status report Konstantin.
Advertisements

1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Status Report: Sensors for the ILC Konstantin Stefanov CCLRC Rutherford Appleton Laboratory.
The Status of the LCFI Project Snowmass 2005 Joel Goldstein CCLRC Rutherford Appleton Laboratory For the LCFI Collaboration.
A CCD-based vertex detector Status report from the LCFI collaboration
Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
Konstantin Stefanov, Rutherford Appleton Laboratory UTA LC Workshop, 8 Jan Report from the LCFI collaboration Konstantin Stefanov RAL Introduction:
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 26 September 2006 LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
Recent developments with LCFI ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development and testing.
Andrei Nomerotski 1 CCD-based Pixel Detectors by LCFI Andrei Nomerotski (U.Oxford) on behalf of LCFI collaboration Hiroshima2006, Carmel CA Outline  LCFI.
1 Physics with a Vertex Detector at the Linear Collider Overview VXD at SLD at the Z 0 Physics at Higher Energy VXD for the ILC Dave Jackson Oxford University/RAL.
1 Konstantin Stefanov, Rutherford Appleton Laboratory 1 LCFI Status Report Konstantin Stefanov on behalf of LCFI CALICE UK Meeting, 27 March 2007  Introduction.
Sonja Hillert, University of Oxford 2005 International Linear Collider Workshop, Stanford, 19 th March 2005 p. 0 Heavy flavour ID and quark charge measurement.
LCFI A Vertex Detector for the International Linear Collider  International Linear Collider (ILC): consensus that ILC will be next major particle accelerator.
Vertex 2002, Kona, Hawaii S.Xella – Rutherford Appleton Laboratory A vertex detector for the next linear collider Stefania Xella on behalf of the LCFI.
Linear Collider Flavour Identification Collaboration: Case for Support ■ Introduction to the ILC and LCFI: ♦Physics at the ILC ♦LCFI physics studies ♦Sensor.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 Instrumentation DepartmentMicroelectronics Design GroupR. Turchetta 3 April 2003 International ECFA/DESY Workshop Amsterdam, 1-4 April 2003 CMOS Monolithic.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
A new idea of the vertex detector for ILC Y. Sugimoto Nov
R&D Status of FPCCD Vertex Detector Dec.1, 2006 Yasuhiro Sugimoto KEK.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Sonja Hillert, University of Oxford PPRP open session: LCFI, London, 8 th September 2004 p. 0 Linear Collider Flavour Identification (LCFI) - Part 1 -
Nicolo de Groot, Rutherford Appleton LaboratoryDESY PRC, 7/8 May 2003p. 1 CCD-based Vertex Detector - LCFI status report Nicolo de Groot RAL/Bristol Conceptual.
Fine Pixel CCD Option for the ILC Vertex Detector
July US LC Workshop Cornell U – Chris Damerell 1 A CCD-based vertex detector Chris Damerell on behalf of the LCFI Collaboration Project overview.
Sonja Hillert, University of Oxford 2005 International Linear Collider Workshop, Stanford, 20 th March 2005 p. 0 Heavy flavour ID and quark charge measurement.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 ECFA 2006, Valencia LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
Joel Goldstein, RAL 4th ECFA/DESY LC Workshop, 1/4/ Vertex Readout Joel Goldstein PPd, RAL 4 th ECFA/DESY LC Workshop DAQ Session 1 st April 2003.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Detector R&D Status Report WP2 – Sensor Development WP3 – Readout and Drive Electronics.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration ILC VD Workshop, Menaggio, 23 April 2008 LCFI Report.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Report to LCFI Oversight Committee, January 2007 ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development.
1 Konstantin Stefanov, STFC Rutherford Appleton Laboratory 1 TILC08, Sendai, Japan A CCD Based Vertex Detector Konstantin Stefanov STFC Rutherford Appleton.
LCFI POsC, July 13, LCFI Project Oversight Committee Outline CCD Clock Drive (WP3/4) External Electronics (WP4) CCD Sensors (WP2) CCD Testing (WP5)
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.
1 Konstantin Stefanov, Rutherford Appleton Laboratory 1 LCWS2007 Progress with the CPCCD and the ISIS Konstantin Stefanov Rutherford Appleton Laboratory.
1 Konstantin Stefanov, STFC Rutherford Appleton Laboratory 1 Vertex 2007, Lake Placid A CCD Based Vertex Detector Konstantin Stefanov STFC Rutherford Appleton.
ASIC Development for Vertex Detector ’07 6/14 Y. Takubo (Tohoku university)
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
Sonja Hillert, University of Oxford 2 nd ECFA LC workshop, Durham, 2 nd September 2004 p. 0 Recent results on vertex charge reconstruction Sonja Hillert.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration LCWS2008, 17 November 2008 Column Parallel CCD and Raw Charge Storage.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford Ringberg Workshop, 8 April 2008 Pixels with Internal Storage: ISIS by LCFI.
LCFI Detector Overview
Developing Radiation Hard Silicon for the Vertex Locator
First Testbeam results
LCFI Status Report: Sensors for the ILC
FPCCD Vertex Detector for ILC
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
FPCCD Vertex Detector for ILC
The LHCb VErtex LOcator
Status of CCD Vertex Detector R&D for GLC
Presentation transcript:

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 0 Recent results from R&D towards a vertex detector at the international linear collider Sonja Hillert, University of Oxford, on behalf of the LCFI collaboration 2 nd ECFA workshop on Physics and Detectors at the Linear Collider Durham, 1 st September 2004  Introduction  Physics studies  Thin ladder development  Column parallel CCD and readout chip  ISIS based detector  Future plans

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 1 A vertex detector for the future LC Precision measurements require:  good angular coverage (cos  = 0.96)  proximity to IP, large lever arm: 5 layers, radii from 15 mm to 60 mm  minimal layer thickness ( < 0.1% X 0 ) to minimise multiple scattering  mechanically stable, low mass support  low power consumption High hit density near interaction point requires:  small pixel size: 20  m  20  m  fast readout: NLC / GLC: 8ms, use Column-Parallel CCDs (CPCCDs); read between bunch trains TESLA: 50  s for CPCCDs or 125ms for ISIS-based detector

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 2 Physics Studies  aim: investigate benchmark processes to quantify tradeoffs between requirements on detector precision and integrated luminosity  improvement of tools for these studies : track attachment to secondary vertex flavour tagging  examples: study of impact parameter resolution in R  at track perigee (right): increasing material budget has moderate effect, but performance strongly suffers when beam pipe radius is increased from 15 to 25 mm study of vertex charge reconstruction see talk in detector performance session

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 3 Thin-ladder development How can ladders be made as thin and mechanically stable as possible?  currently focussing on semi-supported silicon, thinned to epitaxial layer (> 20  m): silicon glued to substrate, e.g. beryllium, carbon fibre composites, ceramics, foams; difference in expansion coefficient between Si and substrate can give rise to buckling when lowering the temperature  future option: Novel Structures : replace glue pillars; micromechanical engineering profile of silicon along the length of a ladder studied both by FEA and by measurements on physical models (left); plot: comparison of steel (similar to Be) and carbon fibre (CF) substrate at room temperature and ~ - 50 o C:  strong buckling of the steel substrate (blue),  carbon fibre stable at low temperature (red); but: CF less favourable than Be in terms of the material budget  under further investigation

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 4 Column parallel CCD and readout chip core of LCFI R&D: development of sensors and their dedicated readout chip (CPR)  first CCD (CPC1) received April 2003, CPR1 in June 2003 excellent standalone performance of both devices clock amplitudes down to 2 Vpp and clock frequencies up to 25 MHz reached  first assembly of CPC1-CPR1 (start January 2004): in part of CCD every 3 rd channel connected using wire bonds proof of principle of reading CPC with CPR combined test of different types of channels on both devices  connections at 20  m pitch only possible using solder bump bonds since LCWS (April): detailed tests of first bump-bonded assembly (ongoing)

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 5  two phase, pixel size 20 μm  20 μm  400 (V)  750 (H) pixels  two charge transport regions  wire and bump bond connection pads to readout chip and external electronics The first CCD prototype (CPC1) Direct connections and 2-stage source followers 1-stage source followers and direct connections on 20 μm pitch

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 6 Readout Chip CPR1 ASIC for CPC-1 readout  design: RAL Microelectronics Group  voltage amplifiers for 1-stage SF outputs  charge amplifiers for direct outputs  20 μm pitch, 0.25 μm CMOS process  wire- and bump-bondable  scalable and designed to work at 50 MHz Wire/bump bond pads 250(W)  132(L)  5-bit FIFO bit flash ADCs Charge Amplifiers Voltage Amplifiers 6 mm 6.5 mm 250(W)  132(L)  5-bit FIFO bit flash ADCs Charge Amplifiers Voltage Amplifiers

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 7 Wire-bonded CPC1-CPR1 assembly spectrum: X-ray signals generated in CPC1 (1-stage source followers), amplified and digitised in CPR1 (voltage amplifier channels) total noise ~130 electrons, noise from preamplifiers negligible

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 8 Bump-bonded CPC1-CPR1 assembly  bump bonding performed by VTT (Finland)  connecting to CCD channels at effective pitch of 20  m possible by staggering of solder bumps

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 9 Initial tests of bump-bonded assembly  7 assemblies delivered by VTT, first 3 tested : ADCs tested by applying test voltage; CPC1-CPR1 with X-rays from 55 Fe source: 3 chips work fine (  next page), 3 failed because of dicing problems – will be avoided in the future  working CPR1 chips: all ADC channels functional all charge amplifiers functional 20% voltage amplifiers on working CPR1 chips show no signal, under further investigation  next batch of assemblies in production at VTT

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 10 Results from bump-bonded assembly signal in charge channels (above) : 86 mV expected, 70 mV observed  very good agreement Voltage channels (below): gain at centre is ½ the gain at the edge: timing problem?

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 11 ISIS-based detector  TESLA: signals of 1000 e - to be amplified & read; so far envisaged 20 readouts / bunch train  SLC experience: may be impossible due to beam–related RF pickup  started to investigate alternative architecture: variant of Image Sensor with In-situ Storage (ISIS) during 200 ms between bunch trains: transfer of stored signals to local charge sensing circuits in pixel, column-parallel readout at moderate rate, e.g. 1MHz Idea : charge collection on photogate in each pixel: linear CCD with 20 elements, each storing charge collected during 1 time slice, shifted on at 50  s intervals

Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 12 Future plans  ongoing detailed tests of bump bonded assembly of CPC1-CPR1; dedicated CPR1 test board for further study of various CPR1 related issues  design of next generation of CCD and CPR near conclusion  CPC2 to comprise following features: 3 different sizes, including ‘full length’ devices to be tested at frequencies of few MHz high-speed ‘busline-free’ devices (differing from standard devices in metallisation) ISIS test structure for proof of principle: 16x16 cells on an x-y-pitch of 160  m x 40  m  CPR2 characteristics to include: on-chip cluster finding, allowing sparsified readout  Future evaluation will show, which of our two baseline detector designs for the cold machine option – CPCCDs or ISIS – will be better matched to the requirements.  ISIS R&D still in very early stage ~ much room for further ideas broader international collaboration would be welcome