March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER
Overview – FY15/16 Completed first year of bond projects total miles of streets completed in FY15/16 Total spent $7.36 million ($3.29 million bond) Ardmore Streetscape Federal Grant ($900,192)
Street Improvements 2015 Street Resurfacing Project (3.26 miles) 2015 Concrete Street Improvement Program (1.15 miles) Twin Lakes Area Street Improvement Program (1.36 miles) Harvard Avenue Widening and Resurfacing (0.31 miles) Museum parking lot Street Maintenance Pavement patching (2.60 miles; joint bid project) Crack sealing (6.19 miles; joint bid project) Asphalt rejuvenation (3.67 miles) Design for FY 16/17
Summary Number of Streets19 Number of Blocks61 Total Length (ft)30,811 Total Length (mi)5.84 (excludes maintenance programs) Street Maintenance$375,000 Non-Referendum Road Cost$1,791,004 Referendum Road Cost$4,948,024 Total Road Cost$7,114,028 Total Fund Budget$7,997,362
Proposed Bond Issue Projects 2016 Street Improvement Program Park (Villa to East End) (completion) Michigan (Park to Madison) Princeton (Terrace to Ridge) College Streets Improvement Project Design for 2017 Projects
Proposed Non-Bond Capital Projects 2016 Street Improvement Program College Streets Improvement Project High Ridge Road Resurfacing Project (Grant) Roosevelt Road Safety Improvements (IDOT) Design for 2017 Projects
Proposed Maintenance Projects Pavement patching ($150,000 budget; joint bidding) Crack sealing ($150,000 budget; joint bidding) Asphalt rejuvenation ($75,000 budget) Ardmore Bridge Retaining Wall ($25,000 budget) Traffic signs/signals In-house base repair & patching
Revenue No dedicated or reliable source Corporate Transfers Grant reimbursements Sales/Lease Financing Fees Cost share with residents
Projects Sidewalk Program 50/50 cost share North Side Sidewalk Construction $950,400 federal grant
Expenditures Six Vehicle/Equipment Lease Purchase Fire apparatus lease payment 3 Police Patrol Units Fire Truck Reserve Unfunded vehicles/equipment (4)
Other capital equipment ($98,015) Recreation and Permitting Software Defibrillators and Fire Hose Phone System Upgrade Unfunded items (14)
Capital Projects Swimming pool improvements Community Garden (grant) Jackson/Islamic garage/shed Floor Replacements (ICC & PW) Gazebo Unfunded Projects (10)
Floodplain consulting & elevation certificates (maps still pending) Monterey ditch & bio-retention (grant) Drainage projects (cost sharing) Permit review (ongoing) $1.5 million CDBG-DR ($550,000 budgeted)
Unfunded drainage projects Michigan (Madison to Jackson) storm sewer Flood Control Study Projects Combined sewer separation (waste water) Unfunded drainage system maintenance Ditching program
FY 15/16FY 16/17 Beginning Balance$1,916,945$1,100,159 +Operating revenues$4,709,700$4,983,800 ‐Operating expenses$4,663,944$4,658,133 -Debt$65,639 Net Revenue($19,883)$260,028 +Grants/Loans$396,350$3,927,207 -Capital Items$1,193,253$4,577,810 Net cash flow($816,786)($390,575) End Balance$1,100,159$709,584
Revenue Updated Rate Study – April 2016 Positive operating cash flow $260,028 Ending 55 day fund balance of $709,584 Prepare new loan applications - $2.4 million Decline in billable metered consumption
Expenditures Water purchase costs ($2.90 million) System operation and maintenance Water loss reduction Leak survey, meter testing & replacement Proposed water audit Capital items Valve exerciser/vehicle Generator (Cornell)
Capital Expenditures Water main replacement Princeton (Plymouth to Ridge) Michigan (Park to Madison; IEPA loan) College Streets (IEPA loan) Water system repairs Park (Villa to east end) 2016 Street Improvements Design for 2017 projects
Revenue Updated rate study – April 2016 Revenue also based on billable consumption Positive operating cash flow – $467,377 Maintain 167 days operating balance – $608,036 IEPA loans – master plan projects Need funding for combined sewer separation
Expenditures Maintenance of collection system WWFTF Continue IEPA loan repayments (3 loans) IEPA Mandates (90% completed) Long Term Control Plan Capacity, Management, Operation and Maintenance (CMOM)
Expenditures Capital items WWFTF replacements Sewer Reimbursement Program Sewer Point Repairs Vehicle
Expenditures - Projects Road Project Components Michigan – Park to Madison Park – Villa to East End Princeton – Terrace to Plymouth College Streets IEPA Loan Funded Projects Master Plan Projects ($1.26 million) Unfunded Projects (see CIP)
Summary Number of Projects58 Number of Road Projects45 Total Length of Road Projects (ft)101,051 Total Length of Road Projects (mi)19.14 Non-Referendum Road Projects Cost (Road Only)$3,519,838 Referendum Road Projects Cost (Road Only)$20,121,969 Total Road Projects Cost (Road Only)$23,641,807 Total Overall CIP Cost$86,934,731
Funding SourceTotal Kenilworth TIF$669,000 North Avenue TIF$189,433 Target TIF$100,000 Street Improvement$3,519,838 GO Bonds$20,121,969 Capital Projects$641,585 Stormwater Buyout$100,000 Stormwater$197,950 Sewer Separation$20,267,750 Flood Control$14,615,172 Water Supply$2,262,206 Wastewater$1,821,094 CDBG-DR Grant$1,716,250 IEPA Loan$14,657,960 Private Funds$170,000 STP Grant$4,793,024 IGIG Grant$55,950 TCM Grant$950,400 Other Grant(s)$18,650 Equipment Replacement Fund$26,500 TOTAL$86,934,731