Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY.

Slides:



Advertisements
Similar presentations
Article 55 of Council Regulation (EC) No 1083/2006: Revenue-generating projects Impact of the revision 2010 Presented by Anton Schrag DG.
Advertisements

Regional Policy Delegated Acts. Regional Policy 2 Delegated ActsImplementing Acts 32(10): Purchase of land and combination of TA with FI 33(3)(a):FI complying.
METHODOLOGY FOR THE CALCULATION OF DISCOUNTED NET REVENUES Expert Group Meeting, 26 September 2013.
Part III Solid Waste Engineering
PROYECTO NEREIDAS VISIÓN EUROPEA DE LOS PROYECTOS TEN-T ALEXIO PICCO – CIRCLE Malaga 03/04/2014.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
Tour de Table Poland Janusz Krupanek, Eleonora Wcislo Institute for Ecology of Industrial Areas, Katowice, Poland NATO/CCMS Pilot Study Meeting Ljubljana,
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Costs & Benefit of Ecology Integration Serbia - Austria 3rd Conference GREEN SERBIA, Belgrade, 29 February 2012 © Thomas Seegers – Fotolia.com.
Environmental Permitting Regulations Tom Fowler – Environment Officer
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
„Extension and modernization of water and wastewater infrastructure in Arad County”
Nanotechnology: an integrated product policy approach Rosalind Malcolm Professor of Law School of Law University of Surrey UK.
1 EECCA-wide trends of water utility performance Tatiana Efimova Helsinki, May 2007 E A P TASK FORCE.
NATO/CCMS Pilot Study Meeting on Prevention and Remediation in Selected Industrial Sectors: Mega-Sites, Ottawa, Canada 12-16, June 2005 The State of Remediation.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Wenxin Zhang Department of Civic Design University of Liverpool
Financing Urban Public Infrastructure
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
EU Policies and Demolition
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Emission control in Bulgaria The involved institutions at national and local (sub-national) levels in Emissions inventory are Ministry of Environment.
EU waste and resource policies Andreas Versmann European Commission – DG Environment Zero waste – February 2009.
Discussion Topic 2 Discussions TOPIC 2: Implementation costs.
1 Permitting of industrial facilities in Croatia.
Ukraine – Attracting Investments in the Municipal and Environmental Infrastructure.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
June 3, 2016Ministry of Regional Development - 2 Interaction of national and European Commission guidelines on Cost-Benefit Analysis : - common misunderstandings.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Environmental Impact Assessment in the Slovak republic.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
SEA in the Czech Republic Prague, 24 September 2008.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
EU Waste legislation PEIP National Workshop – Montenegro Budva, May 2008 Dagmar Kaljarikova European Commission, DG Environment Unit E.3 – Enlargement.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
© EIPA – Robin Smail / Ex-ante Project Appraisal & project selection 1 Robin Smail Senior Lecturer CoR / DG Regio Open Days 28 September 2004 Steps for.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
An end to disposal What needs to be done locally, nationally, and at EU level, in order to phase out residual waste Dr Michael Warhurst, Friends of the.
Green Accounting. EU Policy Context Lisbon (economic and social) Gothenburg (environment) Climate change Sustainable transport Public health Resource.
1. Rabka-Zdroj for more than a hundred years is a spa town famous for its large resources of medicinal mineral waters. › Disadvantage: geographical location.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
Cost recovery study for the Seine Normandie RBMP.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Kristina Veidemane Waste workshop October, 2008, Ohrid, Macedonia Full cost recovery. Setting fees and real costs for waste management.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Regional Policy Requirements and application of ARTICLE 55 Lisbon, 19 April 2013 Michaela Brizova DG REGIO.F1: Operational Efficiency.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
EN Regional Policy EUROPEAN COMMISSION Francesco ANGELINI European Commission, DG for Regional Policy Coordination Unit – Major Projects Team.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Environment : Physical environment surrounding us: Air Water: Fresh water, rivers, oceans, etc. Soil: Lands, forests. Broader definition includes urban.
ENVIRONMENTAL DUE DILIGENCE
JASPERS Regional Office for Romania and Bulgaria
The Feasibility Study: something we already know
Danube Water Conference, Vienna, May 2017
Evaluation of CBA Experience and Key Issues
Michael Jacobsen, Project Director - Water 18 MaY 2017
Feasibility Study Preparation Venelina Varbova
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
WWater reuse Water Directors 24/11/2014 Nicola NOTARO
IMPLEMENTATION OF ARTICLE 9
Wind energy & EU legislation for Nature conservation
Presentation transcript:

Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY

Project documentations

Waste service fee

EU guides /docgener/studies/pdf/cba_guide.pdf

DETERMINATION OF THE GRANT Regulatory framework Article 55(2) maintains the funding-gap method as the basis for the calculation of EU grant in revenue-generating projects, stipulating that the eligible expenditure cannot exceed the current value of the investment cost less the current value of the net revenue from the investment over a specific reference period appropriate to the category of investment concerned.

Polluter Pays Principle The Polluter Pays Principle is one of the principles of Community environmental policy (Art. 174 EC Treaty) and applies throughout the European territory. Specific Community legislative provisions exist for waste. Under Directive 2006/12/EC of the European Parliament and of the Council on waste, in accordance with the polluter pays principle, the cost of disposing of waste must be borne by the holder who has waste handled by a waste collector or by an undertaking and/or by the previous holders or the producer from which the waste came (Art. 15).

Polluter Pays Principle Ideally, the charging system should be based on the real consumption of resources, and tariffs should at least cover operating and maintenance costs as well as a significant part of the assets’ depreciation. An adequate tariff structure should be envisaged attempting to maximise the project’s revenues before public subsidies, while taking affordability into account. For instance, a commonly accepted affordability ratio for water supply and sanitation is 4%. The Commission encourages the Member States to provide information in their guidance documents about the affordability ratios (for average and/or low-income groups) which may be taken as a benchmark for the projects that will be submitted for co-financing.

Waste management priorities

Waste management Brno

Waste incom (2013) Others tun South Moravian region tun City Brno tun Olomouc Region tun Miscelenius tun

Waste calorific value

Financial analysis

Economic analysis When the methodologies proposed are controversial, or data are lacking, then a qualitative analysis of the externalities can be conducted. However, in such a case, results cannot be used in the monetary analysis and must be inserted in a multi-criteria analysis.

Risk assessment

Environmental analysis The main elements of an EIA are the following: emissions into the atmosphere, especially greenhouse gas emissions (impacts relevant for incineration); waste water discharges and soil contamination (impact relevant for land-filling and incineration); impacts on biodiversity (impact relevant for major projects built near protected areas); impacts on human health, linked to pollutant emissions and contamination of the environment (impact relevant for any waste treatment facility); noises and odours (impacts relevant for many waste treatment plants); aesthetic impact on landscape (impact relevant for landfill and incineration); impacts, which may negatively affect mobility, existing infrastructures and so on, due to the increase in local traffic due to waste transportation to the landfill or treatment plant; risk management of the site such as fire and explosions (impact relevant for some specific waste treatment plants such as oil waste treatment plants and incinerators); in urban areas, disruptions can also occur during the construction phase, while, in management phase, in addition to those listed above, disturbances are likely to be linked to the collection of waste.

Residual value of the investment Assumed that the technological part of the investment is completely worn out at the final year, the Residual value is computed on the construction elements of the Project having the estimated useful life of 30 years and coefficient of obsoleteness 0.6 using the formula: where: Ca = Cost of Acquisition Dp = Depreciation period T = Years of use Io = coefficient of obsoleteness

Operating Revenues

Heat output to Brno (2012)

Operating Costs

CBA – unit prices

Calculation of the Financial Internal Rate of Return without Subsidy

Calculation of the Financial Internal Rate of Return with Subsidy

SENSITIVITY ANALYSIS Each revenue and cost item has been tested to assess its impact on the FNPV/C of the investment. Sensitivity indicator (SI) has been used as benchmark for the numerical method. SI compares percentage change in FNPV with percentage change in variable or combination of variables. Each variable has been tested in a range of 10% deviation from the base value.

Sensitivity Analysis of costs and revenues - numerical

Impact of Variables in descending order (SI)

Overview of damage caused by the emissions from incineration, illustrated as dose-response relations.

Emission Study NOx without Project

Emission Study NOx with Project

NO 2 pollutions in city Brno

Waste service fee

Waste incinerater in 1905

Waste incinerater in 1989

Waste incinerater in 2010

Discussion Vojtěch Doležal, SEWACO s.r.o ISWA Study Tour WASTE-TO-ENERGY