1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Database Infrastructure Major Current Projects –CDF Connection Metering, codegen rewrite, hep w/ TRGSim++ – Dennis –CDF DB Client Monitor Server and MySQL.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Operations, Test facilities, CF&S Tom Himel SLAC.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Solve problem of integrating other control systems Solve problem of extending our control system Minimize the latency for data Minimize the implementation.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
1 ILC and Future Programs Stephen Wolbers February 16, 2007.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
EPICS at Fermilab: Not just D0 anymore - Cavities, Cavities, Cavities Geoff Savage for the Dzero and ILCTA controls groups Wed June 14, 2006 EPICS Collaboration.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
September 20, 2005Margaret Votava1 ILC Controls Planning.
Low Level RF and Controls Brian Chase - LLRF Margaret Votava - Controls.
FNAL ILC LLRF Controls and Fast Tuner R&D Status Ruben Carcagno, Brian Chase, Gustavo Cancelo, Yuriy Pischalnikov (on behalf of the FNAL LLRF Working Group)
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
CD FY08 Tactical Plan Review FY08 Tactical Plans for Linear Collider Controls, LLRF, Instrumentation, Detector, Physics Studies Stephen Wolbers for the.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Plans towards CC in the LHC a US – centric perspective
SNS Status Report Karen S. White 10/15/08.
The ILC Control Work Packages
Chris Adolphsen Sergei Nagaitsev
ESS RF Development at Uppsala University
RF System (HLRF, LLRF, Controls) EDR Plan Overview
EPICS: Experimental Physics and Industrial Control System
Presentation transcript:

1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006

2 ILC’s and FNAL’s Top Priority Getting a credible cost for construction approval Cavity R&D –Controls and LLRF systems are required for this R&D –Some LLRF R&D is necessary for getting cavity test areas working. –R&D for the Controls system itself is vital, but it can wait. –How much controls R&D is needed/desired to make the test areas work?

3 Funding Issues Despite priorities, ILC has not allocated nearly enough funds for controls support of the cavity testing areas, let alone controls R&D. –Controls is not unique. True for other infrastructure support as well – RF, LLRF, instrumentation, etc. –This is recognized by FNAL and is being ignored at the moment. (at least for FTE) FNAL SCRF proposal going for DOE funding in February –Approval is critical for NML. Schedules are a mess and completely unreliable, but will improve

4 Where are the Controls Efforts Now Global Effort –WBS exercises and writing RDR, R&D project plans, etc –ANL, FNAL, a little SLAC and sometimes DESY and KEK (but mostly for LLRF) –Necessary, but dull Test Area Effort –Vertical Test Stand(s) at IB1 –Horizontal Test Stand at MDB –Super conduction RF test area at NML Cryomodule testing here Will have beam –SLAC and ANL want to be involved at a 0.5 FTE level

5 Global Controls Effort Costing and RDR writing for GDE ~ 1.5 FTE. Enough to go to the weekly meetings. –Jim, Sharon, Brian, Margaret, Vince, Ron, Steve Wolbers, Bakul Have an R&D project plan, but very limited funding to work on any of it through FY08. –High availability – both hardware and software. Charlie’s work in ATCA falls in here. –Phase reference distribution –Controls system architecture, including gap analysis Delays probably ok, but there are many things that we could be integrating in at NML from the get go. –Maybe we still can with NML delays .

6 Test Area Effort We are looking for 11.5 FTEs just for base support of test areas (ie, no R&D) –3.5 for common infrastructure support – EPICS/DOOCS base support, configuration management, system admin, CRL support, etc –0.5 Development for new instrumentation –2.5 Data Management –3.0 Software development for SCRF –2.0 Hardware development for SCRF –2.0 Cavity Data Management –0.5 HTS support / 0.25 VTS support Combination of all divisions. Primarily (data management not listed) –CD – Margaret, Ron, Luciano –AD – Mike, Dennis, Sharon, Peter P, Michele –PPD – Vladimir, Geoff Short of needed effort

7 NML SCRF facility for ILC and Accelerator R&D –Quite large - on the scale of TTF – –Ultimately 3 cyromodules, but building needs to be extended to fit third. –Much of photoinjector will move. New RF gun? Building is empty now –Cryo being installed – Epics based –Network switch added –Controls requirements document being drafted private/DocDB/ShowDocument?docid=325 difficult to get input from stakeholders We are on ground floor here – exciting time to be involved –This is a laboratory effort (cross divisional) and hopefully even multilab. –Establishes the collaboration for ILC

8 NML View (Except Beamline Areas)

9 Controls System Knowns Integrated DOOCS/Epics –Many components have interfaces in one or the other, but not both –SCRF is advertised as an international facility for people to test. Need to support the DESY collaboration. –Labview and MATLAB will have end users as well ATCA Test Platform for BPMs –Instrumentation expecting controls to provide the infrastructure

10 Short term deliverables (2007) First Cryomodule delivered summer –Coupler conditioning –Warm testing –Archiving, alarming, control, interfaced to data management Photocathode prep system delivered in fall –Developed at INFN Milano –Labview based –Interface to archiving, alarming.

11 Development Work to Support Facility DOOCS/EPICS interface –Soft IOC exists at DESY built against very old versions of both IOC support for new devices Interlock/modulator upgrade Retire SPARC boards (almost done?) Control interface for cathode prep system Sequencer support for NML processes Alarming/archiving design Operator Interfaces!!!! Clock and timing (need a workshop on this) Diagnostics

12 R&D Plans Facilitate Remote Control –Evaluate/integrate role based access (RBA) –Conflict Avoidance –Remote resets Development environment –Java application support? –Eclipse environment? Scalability –Configuration databases (eg, IRMIS) High Availability –ATCA –Diagnostic Interface Layer (DIL) –Middleware