Building Lighting Controls

Slides:



Advertisements
Similar presentations
IECC 2006 Issues and Solutions Code Overview and Issue Solving Products.
Advertisements

Energy Codes & Lighting Controls
Lighting concepts – Ballasts and Lighting Controls
CORE DESIGN.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Lighting Automation LLC 800-LED Lighting Automation Smart Lighting Systems.
Emerging Lighting Technologies Roundup
I can see the light! Energy Efficient Lighting. Energy webinar series.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Lighting Automation LLC Lighting Automation Smart Lighting Systems.
Applications © 2013 Sensor Switch. nLight Feature: Varying Time Delay Application: Hallway Morning: Lights automatically turn on for early arriving workers.
Wired lighting systems Lighting energy accounts for nearly 50% of commercial building electricity consumption and represents 11% of California peak.
ASHRAE/IES Lighting Highlights Eric Richman, LC, LEED AP 90.1 Lighting Subcommittee Chair Pacific Northwest National Laboratory.
It Pays to be Smart Efficiency Flexibility Reliability Savings
Lighting Techniques and Technology Practical Applications Britnei Godusky LC, LEED AP BD+C June 4, 2014AOBA / Current Trends in Sustainability.
What is nLight? nLight is a networked digital lighting control system that provides both energy savings & increased user configurability by cost effectively.
CEC Title Ron France – Leviton Introducing the Leviton T24 Design Guide.
Wired lighting systems Lighting energy accounts for nearly 50% of commercial building electricity consumption and represents 11% of California peak.
Energy Code Update Key Points Adoption of the new Energy Code will be impacting projects and specifications in Montana. Newly adopted energy codes have.
© 2007 Control4. Smart System Controller HC-300 – Linux-based central brain for the home Monitors and manages energy use of the smart home – Lighting.
Changes to Mandatory Title 24 Lighting Requirements Bill Blackley LC Director Product Marketing California's new building energy efficient standards took.
Wired lighting systems Lighting energy accounts for nearly 50% of commercial building electricity consumption and represents 11% of California peak.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
LUMEN ALARM & LIGHTING SYSTEM Artem Aginskiy, Grayson Carr, Yinuo James Chen, Andrew McDowell.
2009 CAMPUS LIGHTING RETROFIT FORUM Laboratory Lighting Controls Upgrade New Laboratory Building Biological Sciences 3 Beat Title 24 Energy Standard by.
Intro Building automation describes the advanced functionality provided by the control system of a building. A building automation system (BAS) is an.
Dimming High-End Tuning Occupancy / Vacancy Sensing Daylight Harvesting Personal Dimming Control Scheduling Controllable Window Treatments Load Shedding.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
LOW COST & NO COST ENERGY REDUCTION STRATEGIES FOR HOUSES OF WORSHIP Lou Ann Wright, LEED AP Roman Catholic Diocese of Pittsburgh May 2014.
Motion Sensor Policy Reform  Brief review of Motion Sensor Policy History  Key Regulator Requirements  Potential for conflict with Fire Code  Case.
Presented By SLAC and Hensel Phelps Welcome SUSB.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lutron Wireless Sensors Sustainability & Energy Savings for new & existing spaces.
Basics of Lighting Controls U.S. Department of Energy Rebuild America And Novitas, Inc.
AN INDIVIDUAL PROJECT FOCUSED ON A SMALL SCHOOL Integrating ICT Sustainability.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
[DATE] [PLACEHOLDER FOR DISTRIBUTOR LOGO]. Low Wattage T8s: A Win for Customers Cost Savings Product Quality Easy Installation Energy Savings.
Chapter 7 Lighting Controls © 2006 Fairchild Publications, Inc.
code calculations, construction drawings
Embedded Design Using ARM For Strong Room Security System
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Via Christi Regional Medical Center Wichita, KS Lindy Pope September 14, 2007 Electricity Reduction.
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
Howard County General Hospital
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Lighting and Sunblind Management Configurable Controllers - RCL-Light / Blind Series.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
LIGHTING MANAGEMENT | PRODUCTS & SYSTEMS PUTTING A STOP TO ENERGY WASTE LIGHTING MANAGEMENT SYSTEM PUTTING A STOP TO ENERGY WASTE.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Smart Room Control- The Smart Addition of Lighting and Shade Control
Turning Off the lights Simples!!!. The Switch Person leaves the room – turn off the lights Its that simple but! So why do lights get left on? Who is responsible?
2015 Washington State Energy Code Proposal 15-E101 1 Digital Timer Switches.
IECC 2012 Standard Lee Brandt, LC, IALD, LEED AP BD+C Principal HLB Lighting Design.
CIBSE Technical Seminar
Nonresidential Lighting Alterations
The most exciting DDC control to be introduced in the last 30 years.
Iron Forge Educational Center: U. S
ASHRAE, California Title 24, NEC
EDUCATION CENTER – SOLEDAD
Facilities Modernization Program
The most exciting DDC control to be introduced in the last 30 years.
Why It’s Easier Than Flipping a Switch
Intelligent Solutions
Presentation transcript:

Building Lighting Controls Energy Savings & Code Requirements for Your Building Presented by: Alyssa Weber, EIT, LEED AP BD+C Controls Manager Visual Interest

How are Lighting Controls Utilized in Your Building? What type(s) of systems are you working with? Centralized Distributed Standalone sensors/switches Switching or dimming What are the advantages/disadvantages of your system(s)? What are the primary issues you have with lighting controls in your building? What occupant issues do you deal with as a result of lighting control systems? How often are you renovating your building/spaces?

Lighting Control Best Practices: Standalone Lighting Control Occupancy sensors, daylight sensors, local dimmers & switches. Advantages: Simple to install and maintain Short wiring runs No complicated programming! Disadvantages: No global override or sweep on/off Simple on/off/dim control – advanced programming functions typically not available Does not meet requirements of new energy codes for every application

Lighting Control Best Practices: Networked Centralized or Distributed? Networked Centralized Lighting Control: Relay or Dimming Panels Advantages: Centrally located equipment - ease of maintenance Straightforward maintenance and programming – been around for years! Disadvantages: Takes up valuable space in electrical rooms Long control wiring runs back to panel Less flexibility – what’s wired is wired!

Lighting Control Best Practices: Networked Centralized or Distributed? Networked Distributed Lighting Control: Switching or Dimming Advantages: Less space taken in electrical rooms Less/shorter wiring requirements More flexibility – keeping control in the space it is needed Disadvantages: Equipment located throughout the building ceiling space, closets, etc Newer technology – programming often required for small changes Requires costly processor to network distributed equipment

Lighting Control Best Practices: Networked Centralized or Distributed?

Lighting Control Best Practices: Standalone Distributed Control Standalone Distributed Lighting Control Short wiring runs, more flexibility, equipment located throughout the building spaces Removes requirement for costly processor Meets new energy code requirements for less cost!

Lighting Control Best Practices: Integration Considerations What level of integration do your buildings have? Does your lighting control to integrate with: BAS Fire Alarm Security Systems AV Automated Shades

IECC 2015 Any project pulling a permit in Denver after September 2016 will be required to meet IECC 2015. Many jurisdictions have already adopted it. Controls must be upgraded if 50% or more of existing light fixtures are replaced. Major differences in control strategies from the last IECC code (2009 or 2012). Expect a higher cost for additional control requirements.

IECC 2015: Occupancy Control Vacancy control requirements: Manual override must be provided Sensors must be programmed for manual on/automatic off, aka vacancy functionality. OR sensors must be programmed such that the lights automatically turn on to 50%, with manual control to 100%. Vacancy control is required in: Training, multi-purpose, meeting, classrooms Copy/print rooms Lounges and employee break rooms Private offices Storage rooms, janitorial closet Locker rooms Warehouses Any enclosed room > 300SF Occupancy control requirements: Sensors can be programmed for automatic on/automatic off, aka occupancy functionality. No manual override switch/dimmer is required. Occupancy control is required in: Public corridors Stairways Restrooms Primary entrances Lobbies

IECC 2015: Occupancy Control What does this mean for your building? Manual overrides/switches where only occupancy sensors were previously required. Programmable control may be required where standalone was previously acceptable.

IECC 2015: Daylight Control Daylight Control: Major Code Change! Required in spaces adjacent to windows or skylights. NOT required where 150W or less of lighting is connected. NOT required where openings are less than 24SF Automatic dimming control of daylight zones required!

IECC 2015: Daylight Control What does this mean for your building? Major change from previous energy code! Daylight sensors and dimmable fixtures will be required adjacent to any windows/skylights. Programmable control WILL be required where standalone was previously acceptable.

IECC 2015: Light Reduction Control Spaces are required to have manual control that allows occupant to reduce the lighting by at least 50%. Achieved by dimming, dual-level switching, or alternate switching fixtures in space. Not required where daylight control is provided. What does this mean for your building? Dimming, dual-level switching, or dual-level zoning is required. Multiple-levels of control are required where single-level was previously provided. LED fixtures inherently are dimmable, so dimming will be much more common.

IECC 2015: Time Scheduling Control Time-clock requirements 7-day timeclock schedules and programmed holiday shutoffs. Manual override switches with maximum 2-hour sweep. Required for: Malls, arcades Auditoriums Retail spaces Industrial facilities Arenas Any area not required to have light reduction control What does this mean for your building? Not much has changed. Continue to have timeclock override/sweeps for many spaces in your building.

IECC 2015: Time Scheduling Control Site Lighting Requirements Photocell to control lights based on daylight. Timeclock programmed to turn lights on/off with dawn/dusk Required to reduce exterior lighting by at least 30% between 12am-6pm (depending on operating hours) Completed projects must have engineer’s stamp on functional testing reports for lighting control system. What does this mean for your building? Major change from previous energy code! Site fixtures will need to be dimmable or step-dimmed (dual-circuit) Control system will expand to accommodate additional zones/dimming. Option for site fixture-integrated controls in lieu of centralized to achieve this requirement.

Building Lighting Controls Questions? Thank you!