Update on ITU-T FG IMT-2020 Glenn Parsons March 2016.

Slides:



Advertisements
Similar presentations
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
Advertisements

Network Virtualization and Service Awareness Properties of FNs
Vientiane, Lao Peoples Democratic Republic, July 2012 Standardization for disasters Takashi Egawa, Vice chair of FG-disaster NEC Corporation
Summary and Conclusions (1) 1 Workshop on Software Defined Networking (SDN) Standardization Landscape Venue and date: Geneva, Switzerland, 4 June 2013.
CDMA Standards Update M2M Small Group Discussion: CONVERGENCE LAYER CONCEPTS Orlett W. Pearson January 2012.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
Geneva, Switzerland, 4 June 2013 SDN in China Duo LIU Vice President CATR, MIIT of China ITU Workshop on Software Defined Networking (SDN)
DOCUMENT #:GSC15-PLEN-08 FOR:Presentation SOURCE:ISACC AGENDA ITEM:Opening Plenary (4.5) CONTACT(S):Jim MacFie ISACC Activities Since GSC-14 Jim MacFie.
Brief update on ITU activities related to IMT-2020
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Focus Group on Cloud Computing Olivier Colas, ITU-T FGCC Vice-Chairman Document No: GSC16-PLEN-45.
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
DOCUMENT #:GSC15-PLEN-64 FOR:Presentation or Information SOURCE:TTA AGENDA ITEM:Plenary 6.14 CONTACT(S):{kipark, chan, Kishik Park, Kangchan.
Report – SeON WG GISFI #7 GISFI # 07, Dec 19-22, 2011, New Delhi Author: Niranth, Ashutosh Organization: Huawei, NIKSUN Doc No: GISFI_SeON_
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002 Overview of Q.6/SSG: Harmonization of evolving IMT-2000 systems Rapporteur: Bruce Pettitt.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
DOCUMENT #:GSC15-PLEN-63 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:Plenary 6.14 CONTACT(S):Reinhard Scholl Activities of Focus Group on Cloud Computing.
ITU Regional Standardization Forum for Americas (Washington D.C., United States, 21 September 2015) The CITEL Standards Coordination Role in Bridging the.
Overview of SG11 Yukio Hiramatsu Chairman of ITU-T SG11 NTT, Japan.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
JEM for 3GPP2 Vision, San Diego, July 12-13, Long-term All IP Conference and IP 2 Ad-Hoc group ARIB/TTC IP 2 Ad-hoc Group Joint Experts Meeting for.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Focus Group on Smart Grid David Su Vice Chair, Focus Group on Smart Grid Document No: GSC16-PLEN-60.
Committed to Connecting the World ITU-T Cloud Computing standardization activities Dr Chaesub Lee, SG13 Chairman ITU Workshop on "Cloud Computing Standards.
Committed to Connecting the World ITU-T SG13 since the 1 st AFRG Chairman: Chaesub Lee Counsellor: Tatiana Kurakova.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Summary of IMT-2020/5G Strategic Session
International Telecommunication Union Results of the first FGFN meeting in Lulea Naotaka MORITA Chairman of FGFN 14 July 2009.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
ITU-T Study Group 13 and L1 VPNs Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP/VPN WGs Q.2/13 Rapporteur
The 5G Wireline Challenge Chair – FG IMT-2020 Wireline
Overview of ITU activities on 5G
Towards more flexible networks -- backyard of IMT Takashi Egawa NEC Corporation Rapporteur, Q.14, SG13 1.
Information Centric Networking (ICN) in IMT-2020
Future Network Standardization Activities in ISO/IEC JTC1/SC6
ITU-T Focus Group on Cloud Computing
Progress of Network Architecture Work in FG IMT-2020
Recent Progress of CCSA’s Standardization Activities
2 TTC WG restructuring TTC is responsible for ICT standardization except for radio and broadcasting issues in Japan. TTC is accredited by MIC to engage.
(Tokyo, Japan, 4-5 February 2013)
Technical Packages on IMT-2020 by WP1/13
Report of 19th UNIOT-WG Meeting
Yoichi MAEDA, CEO & SVP of TTC
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
FG-FN results and future steps
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002
ITU-T Study Group 17 Security
5G Architecture Standardization Landscape in 3GPP
Technical Packages on IMT-2020 by WP1/13
IEEE activites related to 5G
Roger Marks (Huawei) capable 5 November 2018
Carlos J. Bernardos, Alain Mourad, Akbar Rahman
May 25th 2016 Peter Ashwood-Smith
Global Collaboration on Future Network Standardization
Roger Marks (Huawei) capable 12 September 2018
Global Collaboration on Future Network Standardization
Brief update on ITU activities related to IMT-2020
GLOBAL ict standardisation forum for india (Gisfi)
Yoichi MAEDA, CEO & SVP of TTC
Recent Progress of CCSA’s Standardization Activities
ONAP 5G USE CASE ENHANCEMENTS
IEEE 802 2nd Vice Chair last name at ieee dot org
Technical Packages on IMT-2020 by WP1/13
Liaison Report Date: Author: Nov 2007 Month Year
Summary of IMT-2020/5G Strategic Session
Technical Packages on IMT-2020 by WP1/13
Presentation transcript:

Update on ITU-T FG IMT-2020 Glenn Parsons March 2016

ITU-T FG IMT-2020 – First Phase ITU-T SG13 – the Parent Study Group Limited life time: June – Dec 2015 The Initial Objectives: – produce materials of standards gap analysis of IMT-2020 in order to identify the relevant scope of ITU-T Recommendations on the fixed network of IMT Non-Radio topics only First Phase was completed successfully and the gap analysis report discussed and approved by ITU-T SG13 in Dec.,2015.

ITU-T FG IMT2020 – Second Phase ITU-T SG13 approved to extend the lifetime of the FG for one year to the end of 2016 with new ToR as indicated below: – Explore demonstrations or prototyping with other groups, notably the open source community – Enhance aspects related to Networks softwarization and ICN; – Continue to refine and develop the IMT-2020 network architecture – Continue the study of fixed mobile convergence aspects – Continue to study network slicing for the front haul/back haul network – Continue to define new traffic models and associated QoS and OAM aspects applicable to IMT-2020 networks

FG IMT-2020 – New Structure The new structure for the FG is as follow: – WG1: Architecture and Framework/Fixed Mobile Convergence (FMC) – WG2: Network Softwarization/Transport FH/BH supporting slicing and Transport SDN – WG3: Information Centric Networking (ICN) – WG4: End-to-End Network Management

FG IMT2020 – Working Methods Conference calls - many Face-to-face meetings – Seoul, 8-11 March 2016 – Beijing, May 2016 – US, early September (TBD) – Geneva, late Nov (TBD)

FG IMT2020- Current Work During recent conference calls, it was initially agreed to develop the following draft recommendations: - Network Management framework for IMT Network Management requirements - Requirements of IMT-2020 from non-radio network perspective - Framework of IMT-2020 from non-radio network perspective Other Planned Activities: - Create a catalogue of open source software on NW Softwarization - Mapping open source software in end-to-end slicing - Explore Interaction among multiple open source software - Plan a number of PoCs

ITU-T Focus Group on IMT-2020 Wireline March Peter Ashwood-Smith - Chairman liaison

More to 5G than just the radio side… its cloud FG looks at non radio aspects. C-RAN INSTANCE SLICE CONTROLLER DWDM )))) RAT / CN RATRAT RAT/MEC CN / MEC Idle/off 400 GE UE SLICE CTRL IDC SLICE CTRL FH SLICE CTRL DC FABRIC CTRL DC SERVER CTRL MASTER SLICE CONTROLLER C-RAN INSTANCE SLICE CONTROLLER DWDM )))) RAT / CN RA T RAT/ CN RAT/MEC CN / MEC Idle/off 400 GE UE SLICE CTRL IDC SLICE CTRL FH SLICE CTRL DC FABRIC CTRL DC SERVER CTRL METRO N/W CONTROLLER Packet/Optical IDC/I-CRAN Analog DC CONTROLLER CN Idle/off DC POD CN Idle/off DC POD

ITU-T 5G wireline FG-IMT-2020 Phase I Summary ITU Focus Group to study the requirements and standardization needs of the wireline in support of 5G (non Radio) Huawei chair (Peter Ashwood-Smith) in May 2015 Vice chairs CMCC(Y.Wantg), ETRI(N.Ko), NTT (Y.Goto), Telecom Italia (L.Pesando) Parent Group SG-13 Completely Free format to explore ‘gaps’ required to support the 5G vision (IMT.VISION) Parallel work in 5 main areas to minimize overlap with other 5G SDO’s: 1)High level network architecture, championed by Dr Namseok Ko, ETRI, Korea; 2)Network softwarization, championed by Prof Akihiro Nakao, University of Tokyo, Japan; 3)End-to-end quality of service, championed by Dongwook Kim, ex KT Corporation; Olivia Heeyun Choi, KT Corporation; 4)Front haul / back haul, championed by Dr Frank Effenberger, Huawei Technologies; Dr Gyaneshwar C. Gupta, Oki Electric Industry Co., Ltd. 5)Emerging networking technologies - information centric networking (ICN), championed by Dr Paul Polakos, Cisco Systems; Dr Marc Mosko, PARC. Led production of final document with 85 identified gaps in 5 areas and delivery to SG-13 in December MeetingSan Diego (8-9 June 2015) Geneva (13-14 July 2015) Turin (21-24 September 2015) Beijing (27-30 October 2015) Input docs Output docs1762 Meeting reportO-001O-002O-009O-015 Remote participants Total participants multiple conference Calls, Work Shops etc.

First Output Document Structure: Executive Summary + Gaps + Supplemental info A.19 Mobility management for distributed flat network Priority: High Description: As the IMT-2020 core network is envisioned to be a flat distributed network, which is composed of the multiple distributed gateways to cope with traffic explosion and latency requirements of applications, mobility management should be studied aligning with those architectural changes. Related work: 3GPP, SG13 A.18 End-to-end network management in a multi-domain environment Priority: High Description: Multiple network management protocols in different network domains make it difficult to support unified network operations over multiple network domains. A unified end-to- end network management should be considered to ensure compatibility and flexibility for the operation and management of an IMT-2020 network. Related work: SG13 A.17 OAM protocols Priority: High Description: OAM protocols are not standardized in some parts of IMT networks such as the front haul network. Standard OAM protocols should be studied for fault management and performance management between network equipment that may be commonly used across the IMT-2020 network. Related work:

ITU-T 5G wireline FG-IMT-2020 Phase II (2016) Renewed end of 2015 for all of 2016 (Ashwood-Smith chair), Vice Chairs same with one substitution within NTT. New Terms of Reference as follows: Demonstrations or prototyping with other groups (e.g., with open source community); Network softwarization and ICN; Network architecture refinement; Fixed mobile convergence; Network slicing for front haul/back haul; New traffic models and associated QoS and OAM aspects applicable to IMT-2020 architecture. Four meetings in 2016 – First is March in Seoul next is Beijing in early May, Palo Alto in September and concluding meeting likely November in Geneva. First meeting had demos of: LTE eNodeB virtualization via containers, CPRI over Packet, and Fabric-As-A- Service on ODL. Video demo recordings are available via the ITU-T FG SharePoint. Expected year end outputs 1: Several draft recommendations close to final ready to be progressed by ITU in Expected year end outputs 2: Proof of concept of softwarization, possibly joint open source orchestrator with hopefully end to end demos to be done at final meeting. We of course welcome collaboration with other interested SDO.