Summary of MKI UFO MD 7/17/20121MKI UFO MD 17.7.2012 LSWG Meeting Maria Hempel T. Baer, M. Barnes, S. Bart Pedersen, S. Cettour Cave, B. Dehning, E. Effinger,

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC UFO Study Working GroupSeptember 15 th UFOs since TS#4 LHC UFO Study Group Tobias Baer September, 15 th 2011 Acknowledgements: B. Goddard, S.
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
LIBD MeetingNovember 29 th MKI UFOs LIBD Meeting Tobias Baer November, 29 th 2011 Acknowledgements: M. Barnes, C. Bracco, N. Garrel, B. Goddard,
UFO Study Working GroupAugust 12 th Update on UFO Studies Tobias Baer August, 12 th 2011 Acknowledgements: G. Arduini, W. Bartmann, M. Barnes, C.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Brief Summary of LPA MD on 19 June 2012 Jose Abelleira, Xavier Buffat, Chandra Bhat, Karel Cornelis, Riccardo De Maria, Stephane Fartoukh, Rossano Giachino,
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
MKI failure event 17-April-11 Recall from logbook: MKI D (1st one seen by the beam) had a real flashover between the two sets of 36b during the 3rd 72b.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
LHC Beam Operation CommitteeJuly, 24 th update on UFOs: 2012 Observations, Studies and Extrapolations LBOC Tobias Baer July, 24 th 2012 Acknowledgements:
LHC Status Fri Morning 3-June
Use of a Diamond BLM System in the LHC Ring
MD Planning Fri – Sat (26. – 27.8.)
Use of a Diamond BLM System in the LHC Ring
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Friday 15th June 01:11 Injection.
MD2036: UFO dynamics studies and UFO fast detection
Fast BLM acquisition system
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Turnaround: from LHC to FCC?
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Monday – recovery from MKI flashover
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Scrubbing progress - 10/12/2012
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Scrubbing progress - 08/12/2012
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC - Week 38 Technical stop: Katy Foraz
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Another Immortal Fill….
Monday 27th August & night
Thursday Morning/Afternoon
Monday 152 bunch operation summary
Presentation transcript:

Summary of MKI UFO MD 7/17/20121MKI UFO MD LSWG Meeting Maria Hempel T. Baer, M. Barnes, S. Bart Pedersen, S. Cettour Cave, B. Dehning, E. Effinger, R. Giachino, E. Griesmayer, M. Hempel, A. MacPherson, G. Roy, G. Trad, J. Uythoven

MD Plans Plan (10h): Inject 1236 bunches (half with large emittance, half with small emittance) Pulse MKIs on gap in circulating beam to produce UFOs (alternating B1/B2) Study UFO rate and dynamics with anti-e-cloud solenoids on/off Study UFO rate and dynamics for different MKI pulse lengths Make diamond BLM measurements from UFOs (1ns time resolution) Make BLM measurements with study buffer (80µs time resolution) Real program: 18:00 access (AC dipole, amplifier for diamond BLMs in Pt.7, etc.) 20:12 start the machine protection test procedure (no beam in LHC)  2h delay 21:14 test procedure finished, preparing for injection 22:38 BLM beam dump during 144b injection, TL steering and refill 0: bunches circulating (660b with ~3µm·rad and 576b with ~1.5µm·rad) 1:10 start pulsing MKIs 1:40 swtich off anti-e-cloud solenoids 1:53 MKI flashover  beam dump 1:57 open ventilation door  access, precycle 4:30 pilot injection Many (unrelated) technical problems  we could only measure 42min

Measurements Emittance measurement of all bunches (two different emittances) with BSRT Measurement or injection losses with diamond BLM in Pt.7 UFO in BLM study buffer. Asymmetric temporal loss profile (as predicted by theory)

Effect of anti-e-cloud solenoids 5 candidate UFOs (MKI.R8) in 18 MKI pulses with solenoids on 13 candidate UFOs (MKI.R8) in 8 MKI pulses with solenoids off Solenoids off increased pressure  flashover in MKI.C5R8

Summary Due to many (unrelated) technical problems only 42min of measurement time out of 10h scheduled MD time. Do not pulse MKIs without anti-e-cloud solenoids for high intensity beam (also Q4/Q5 solenoids are now activated during normal operation). Increased UFO activity with deactivated anti-e-cloud solenoids observed/confirmed. Diamond BLM configuration improved for (large) UFO diagnostics (see LBOC next week).