Project 071103 CIM Test Development Process John Simmins Project Overview 1/27/2011.

Slides:



Advertisements
Similar presentations
The Business Analyst and the SDLC
Advertisements

Program Management Office (PMO) Design
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Test Automation Success: Choosing the Right People & Process
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
<<replace with Customer Logo>>
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP8/14 Webconference December 4, 2012.
Program Management Overview (An Introduction)
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
SE 555 Software Requirements & Specification Requirements Validation.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
Project Scope Management
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
S/W Project Management
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
Common Information Model and EPRI Smart Grid Research
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Chapter 5 Defining and Managing Project and Product Scope Copyright 2012 John Wiley & Sons, Inc. 5-1.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Conformance Mark Skall Lynne S. Rosenthal National Institute of Standards and Technology
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc. 1 Introduction to SISCO For CIM Users.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 Product Design Finalization; Inspections.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
CIM for Weather A joint project of: - Southern California Edison (SCE) - EPRI - Open Grid Systems Pat Brown EPRI Senior Project Manager CIMug - Prague.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
CIM Test Methodology Overview John Simmins 5/24/2011.
Requirements Traceability Matrix
CIM Test Methodology Overview John Simmins 5/3/2011.
June 17, 2009 Michael W. Howard, Ph.D. Sr. Vice President The Interoperable Smart Grid Evolving.
Project CIM Test Development Process
1 Updating the ESnet Site Coordinator Model (Presented to SLCCC, June, 2004) Joe Burrescia Mike Collins William E. Johnston DRAFT FOR COMMENT 7/19/04.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Boot Camp - Conformity July 19, 2010 Detroit, USA.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Requirements Management with Use Cases Module 2: Introduction to RMUC Requirements Management with Use Cases Module 2: Introduction to RMUC.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Project Management PTM721S
Software Verification and Validation
CIM Test Development Process
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
CIM Test Methodology Overview
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Presentation transcript:

Project CIM Test Development Process John Simmins Project Overview 1/27/2011

2 © 2010 Electric Power Research Institute, Inc. All rights reserved. CIM test process overview CIM Test Methodology compatible with –IEC WG 14 –CIM Users Group –OpenSG And possibly MultiSpeak Test process defined, documented and repeatable Vetted with multiple utilities, vendors and user groups Tests designed for multiple implementation environments (test only messages, implementation agnostic) –Legacy point-to-point –SOA implementation –Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish) Tests openly available and published on Open Smart Grid (OpenSG)

3 © 2010 Electric Power Research Institute, Inc. All rights reserved. Project Participants Utility Sponsors Consumers Energy, AEP, SCE, PG&E Industry Open Smart Grid (OpenSG) Project Leadership Electric Power Research Institute (EPRI)/EnerNex

4 © 2010 Electric Power Research Institute, Inc. All rights reserved. Schedule & SOW Task Deliverables

5 © 2010 Electric Power Research Institute, Inc. All rights reserved. Best Practice Test Documentation Test Plan Overall plan defining goals, schedule and expected outcome of the test program Includes stakeholder roles and responsibilities Test Cases Defines test objectives and units under test (UUTs) Includes test requirements and req. traceability matrix (RTM) Test Procedures Detailed step-by-step instructions to execute formal tests Includes test setup, data recording and test data sets Test Report Documents Test Results Lists test discrepancies and status of corrective actions

6 © 2010 Electric Power Research Institute, Inc. All rights reserved. CIM-based Test Overview CIM Tests Abstract Test Cases Conformance Tests Interoperability Tests Concrete Detailed Test Procedures Conformance Tests Interoperability Tests

7 © 2010 Electric Power Research Institute, Inc. All rights reserved. Concrete Test Procedures Detailed step-by-step instructions needed to execute tests in laboratory environment Includes test set-up steps, exact message content, expected results and pass/fail criteria Concrete Detailed Test Procedures Conformance Tests Verifies adherence to IEC and standards Validates systems from different vendors can operate together using CIM-formatted messages Interoperability Tests

8 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Case Development Process

9 © 2010 Electric Power Research Institute, Inc. All rights reserved. Interoperability Test Procedure Development Process

10 © 2010 Electric Power Research Institute, Inc. All rights reserved. Preparation for Formal Test Execution 1. Management Coordination2. Technical Coordination 3. Ensure test readiness by dry running the test procedures

11 © 2010 Electric Power Research Institute, Inc. All rights reserved. 1. Management Coordination of Formal Tests 1.1 Review goals and desired outcomes1.2 Address Intellectual Property Concerns 1.3 Sign MOUs and NDAs as required 1.4 Identify POCs for test coordination

12 © 2010 Electric Power Research Institute, Inc. All rights reserved. 2. Technical Coordination for Formal Tests 2.1 Identify and address IT issues and concerns 2.2 Identify and address security needs and requirements 2.3 Document test equipment setup process including test servers/clients 2.4 Identify and document transport level setup process

13 © 2010 Electric Power Research Institute, Inc. All rights reserved. 3. Ensure Test Readiness/Dry Run Test Procedures 3.1 Coordinate dry run schedule with POCs 3.2 Run through each test procedure to identity errors and ambiguities in the test 3.3 Markup and update test procedure as required. Rerun if required. 3.4 Run through test procedures with each interested party

14 © 2010 Electric Power Research Institute, Inc. All rights reserved. Questions & Contact Informatation John J. Simmins, Ph.D. Senior Project Manager – Smart Grid Electric Power Research Institute (EPRI) 942 Corridor Park Blvd. Knoxville, TN (Office) (Cell)