Technical Support 2008 1 5/22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/20/2008 Don Lynch. 3/20/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch

Technical Support /22/08 Shutdown ’08 Schedule Shutdown PrepDone Mu Trigger, RPC Prototype Installation, New Beampipe, CM Crane, Sta. 1 and MMN Scaffolding ReviewsAll Done, Action Items in progress RPC Prototype C tests (in tent)in progress Install/field fit CM access stairs in progress Build MMN scaffolding5/22 Build Sta. 1 N. scaffolding5/26 MuTr Decapacitations (Sta. 1 N and MMN)6/2 RPC Prototype D tests (in tent)Apr-May Design RPC installation fixtures & MuTrigger FEE platformsIn progress Prep work for Mutrgr platforms (water/elec)May-June Prep work for RPC proptotype installMay-June move (7) MuID pipes move gap 5 south cable tray End of run Party May 30

Technical Support /22/08 Shutdown ’08 Schedule, cont’d Prep RPC Proto, MuTrggr FEE N&S RacksApr-July RPC engineering & safety reviewmid June MuTrigger FEE N InstallJuly - Aug. Install MuTrigger N cooling water & airJuly - Aug. RPC prototype gas systemJuly - Aug Move shielding for RPC prototype installationJuly - Sep RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug Install MuTrigger FEE N platform&RackJuly 15 – Aug 1 RPC prototype installSep.-Oct. (RPC2 – PHENIX) (RPC3 – C. Pearson) Install RPC prototype rack in tunnel southSep. Install Mutrigger FEE’s in MMS for RPC testSep. Install MuTrigger FEE South platformSep. Install MuTrgr S rack cooling & electricSep. HBD InstallSep.-Oct. Connect electronics/gas/water/air for RPCSep. – Nov. Install MuTrigger N& S racksSep. - Nov PC1 west work (needs planning)Sep. – Nov. CM Crane InstallOct. DC East?/West RepairsOct. – Nov. Replace tunnel shieldingNov. (C. Pearson)

Technical Support /22/08 Shutdown ’08 Schedule, cont’d Remove all inst’n equipment(e.g. scaffolds)Oct. - Nov Gap 5 north piping and cable tray re-loc.Oct. – Dec. Gap 2 north cable tray & crate re-mountsOct. – Dec Fan Tray maintenanceOct. - Dec. Prep for shutdown 2009Nov. - Dec Prep for run 9Dec Close shield wall start shifts Dec. Start physicsJan 1

Technical Support /22/08 1) Install 30KVA UPS in Rack Room. Done 2) Install HVAC cooling and/or fan power circuits into RPC tent. Install fans/cooling units. 3) Run Power to new MuTrgr FEE racks on MMN and MMS 4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. 5) Assist in signal cable installation for MuTr/RPC upgrades as necessary. 6) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. 7) Install power feeds to RPC north & south tunnel racks from IR power panels. NOTE: MuTr north power panel has no available breakers to feed north tunnel racks (south panel has spare breakers for use). More engineering analysis is required to determine if the north power panel should be increased in size or for installation of a sub panel branch can be accomplished. 8) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Shutdown ’08 Electrician Work

Technical Support /22/08 Work Permit Requirements CM Crane Installation RPC Prototype Installation HBD re-installation PC1 Repairs These WP’s not needed until Sept. (More will be needed – to be added to the list as appropriate)

Technical Support /22/08 Shutdown Work $$$ Projects Include: 1.CM Crane 2.New 40 mm ID beampipe 3.RPC Factory 4.RPC Prototype Installation 5.RPC Final Installation 6.MuTrigger FEE Upgrade 7.CM Access Stairs 8.MuTr Decapitations 9.Gas House Reorganizationmaintenance 10.Bridge Rework 11.HBD Re-installation 12.DC East & West Repairs 13.PC1 Repair 14.Rack room UPS upgrade 15.Bridge Power upgrade 16.Rack Room Update 17.Detector Rack Fan tray replacement 18.Safety System Upgrade 19.Cooling Water system upgrade 20.DAQ/Trigger Upgrade 21.DCM II Development 22.VTX support 23.FVTX support 24.NCC support PHENIC Engineering and Technical Support Group Spreadsheets updated, please review/correct/return to D. Lynch ASAP.

Technical Support /22/08 MuTrgr North FEE Rack Platform

Technical Support /22/08

10 MuTrigger North Rack

5/22/0811 MuTrigger South Rack

5/22/0812 Shelf & Pb brick concept

Technical Support /22/08 RPC Absorber Concept

Technical Support /22/08 RPC Absorber Concept Uses 112 2x4x8 PB bricks, 22 need to be cut 12 inches deep (RPC group requsted 35 mm (13.8 in)

Technical Support /22/08 RPC Prototype Rec’d dim’s and lifting points from Larry B. Need to decide on prototype orientation and alignment for Sta 1 & 2 based on absorber location.

Technical Support /22/08 RPC Factory Support, cont. (2) ~1 Ton thru-the-wall AC’s available from CA-D 208V Need isolated electrical source Storage Shelving: 2 additional sets rec’d. Kenny is assembling them.

Technical Support /22/08 Combined CM Crane, MMN & Station 1 scaffolding Review Station 1 platforms rec’d. Remaining components due ~5/28 WP is approved Station 2/3 construction is underway Crane installation Postponed until fall

Technical Support /22/08 New Beampipe Design & Review SS/Be central beampipe 1-5/8” to 3” transitions Drawings Done, C-A getting Quotes for NEG coating BP designs at SAES for NEG quote. Meet w/ Brush Wellman 5/19

Technical Support /22/08 Station 1 MuTrigger FEE’s

Station-1 Mount RIKEN/RBRC Itaru Nakagawa

5/22/0821 Station 1 Mount Design

5/22/0822 Difficulty in Station-1 Mount Space in front of Hatch

5/22/0823 Hatch Swing! Hinge

5/22/0824 Clearance Estimate w/ 3D Model Hatch 3.797”

5/22/0825 Clearance Btwn Hatch

5/22/0826 Chassis in the middle of Quadrant

5/22/0827 BBC Cables

5/22/0828 Mid-Quadrant Clearance (3D Model) 2.58” (63mm)

5/22/0829 Mid-Quadrant Clearance

5/22/0830 Chassis in the middle of Quadrant Chamber  New FEE : Short by 15cm New FEE  Existin’ FEE: Short by 5cm

5/22/0831 Chassis in the middle of Quadrant Octant 7Octant 8 

5/22/0832 Additional LV Channel Station-1Station-2Station-3Total North LV Channel Number of Signal Cables stays same, because number of boards are conserved.

Technical Support /22/08 CM Access

Technical Support /22/08 CM Access

Technical Support /22/08 Safety, Security, etc. First-aid, DOE-Recordable, and DART Cases 4/ Recordable & DART, 1 First Aid An employee fell while trying to cross the curbing between the west parking lot and the road adjacent to Building 400, injuring a knee and fracturing an ankle. DART & Recordable An employee was bending over to place a bundle of cardboard on a two- foot tall table when he injured his lower back. First Aid An employee was walking around a piece of equipment he was working on and tripped over an extension cord. Falling, he struck his right hand against steel scaffolding, injuring the knuckles at the base of the middle and ring fingers. Prescription drugs were prescribed by the treating physician and the employee has lost time. DART & Recordable

Technical Support /22/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Monday 5/26 is Memorial Day and a LAB Holiday. Enjoy your long weekend and remember those who have sacrificed so that we can have all that we have.