35ton and LAPD cryostats and future DUNE detector development.

Slides:



Advertisements
Similar presentations
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
Advertisements

LAPD Run 2 Results and Notes Terry Tope
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
A purification plant for liquid argon (nitrogen) Hardy Simgen Max-Planck-Institut für Kernphysik Heidelberg.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
Hans Jostlein, May 24, Large Liquid Argon Purity Demonstration— Phase I: Gas Flushing -What -Why ? -How ? -When ? -Define “Success”
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Plans for this week MWPC: wire stretching today
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Follow-up of the tests with the copper filter
Warm structure requirements :
C50 Cavity pair Assembly Changes
Test box for ProtoDUNE SP – Integration Test
ICARUS Internal Cryogenic Sensors
Presentation transcript:

35ton and LAPD cryostats and future DUNE detector development

LAPD (30 ton) and 35ton cryostats ADVICE: Find a way to do your test in a smaller more nimble test stand The size of these cryostats makes filling with LAr expensive and logistically complicated (4 delivery trucks over 2 weeks for example) That means it is a one-shot test, you can’t access your stuff inside and turn knobs, then measure again. There are smaller test stands at PAB with purification systems where a small TPC can be installed in a couple weeks and filled in a couple hours. This is how/where the ArgoNeuT electronics were developed and alternate cold CMOS pre-amplifier was tested for LBNE

50 cm 30 cm

35ton: Ship in a bottle Side view Front view hallway d=4104 mm 5404 mm s=1995 mm This is a VERY awkward place to work! Confined space that requires special training and a watchman posted outside while working 35ton phase2 detector was made as big as possible, thus barely fits into the existing space. Therefore, the just-installed component blocked access to the previously installed one. 6 months from start of installation to liquid argon filling. Only 1-2 months of that was detector installation Cryo piping and pumps have to be removed for access to the tank

“Long Bo” LAPD hinge 2 m

Why would we do anything in the 35ton or LAPD? They are big inside compared to other cryogenic test stands. They share a liquid argon purification system with very large capacity and sophisticated gas analyzer system (LAPD purity was > 14ms) 35ton is the only membrane cryostat available for tests

Remember LAPD shares the same purification system Similar size (30 tons). Inner geometry is different: cylindrical and taller but skinnier Access is still difficult (entry/exit flange is the same size). Perhaps possible to add second entrance point, but expensive Recirculation pump is outside the cryostat In LAPD, we obtained a purity too good to measure > 14ms with a TPC inside.

Idea set 1: Cryogenic questions Can we develop a cool down procedure that preserves the purity of the LAr used to fill the tank. (membrane cryostat needed? Large tank needed? If the 35ton phase 2 purity is also barely adequate (3 ms), can we unquestionably demonstrate the origin of the impurites? Can we eliminate the membrane cryostat as the source? Is this the only place to test new feedthrough designs? Is this a good place to test them? Are there new filtration materials that we want to test, for radon contamination for example? (Filtration system at PAB is shared and compromising it is frowned upon)

Idea set 2: What kinds of tests require the big inner space?? Light detection for tracks ~2-3 m distant Cold electronics attached to an APA? Air, LN2, LAr?? (cryostat is a faraday cage) Radon contamination studies?

Idea Set 3: another TPC? Unlikely that the current TPC will sit and gather dust after phase 2 is finished For example, move one APA and part of the DAQ to DAB for future DAQ development But time scale to start from scratch is ominous months?

Summary If you can do your test someplace else, you should! LAPD and 35ton have unique features – Large inner volumes – Large capacity filtration system with sophisticated diagnostics (gas analyzers and 5 purity monitors) – 35ton is a membrane cryostat