Ordinance No. 880-B, Revisions to Chapter 9.5 of the City of Southlake Code, Article V – Gas & Oil Well Drilling and Production. Work Session.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Advertisements

NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Drilling Gas Wells: Beginning to End. Seismic Exploration.
Lunenburg County Public Hearing January 29, 2013 Conditional Use Permit Lunenburg County Landfill Tracy Gee, County Administrator Frank F. Rennie, IV,
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Colorado Oil and Gas Conservation Commission Changes to COGCC Noise Regulations July 17, 2007 David Dillon – COGCC Engineering Manager.
BCC CALLED PUBLIC HEARING ON BZA #SE , DECEMBER 4, 2014 APPLICANT: NORBERTO DUARTE Orange County Zoning Division DATE: March 10, 2015.
Planning Permission Process and Procedures
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Los Angeles Unified School District Owner Controlled Insurance Program (OCIP) Aristeo Aguilera, CRIS OCIP Risk Manager Boot Camp September 2014.
North American Emission Control Area
Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
After the Sanitary Survey
Proposed DriveCam ® Program Board of County Commissioners November 13, 2007.
Regulatory Aspects of the Underground Hydrocarbon Storage (UHS) Program and the Role Contractors Have in This Lyons Celebration Center, Lyons, Kansas February.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Blasting Regulations Proposed Changes to The Existing Ordinance.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
La Center, Washington: Balancing Pipelines and Populations 1.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Extractive Industry Workshop Morgantown Planning Commission Monday, February 20, :00 PM Council Chambers.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Mansfield Gas Well Awareness Urban Gas Development 101: What you need to know...
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
FIRST PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 3, 2014.
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Floodplain Management Ordinance Public Hearing September 22, 2009 Floodplain Management Ordinance Public Hearing September 22, 2009.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Community Development Department Special Exception Vehicle Rental and Leasing St. Joe Plaza.
BCC APPEAL PUBLIC HEARING ON BZA #SE APPLICANT/APPELLANT: Centro Cristiano Restauracion Orange County Zoning Division FEBRUARY 9, 2016 (Continued.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Ordinance No. 544-B Proposed Amendments to the City of Southlake Landscape Ordinance Item 6A.
Town Hall Meeting MLK Community Center July 21, pm.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
1 Salt Water Disposal Pilot Project October 14, 2008.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Land Use Management Ordinance Update Planning Commission September 1,
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
Summary of Milner JGJ Gas Well Motion. Motion to Approve GAS I move that we approve Resolution No also known as GAS the Specific.
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
Starling of Palm Coast Assisted Living Facility Tier 2 - Technical Site Plan Review PLDRB Hearing on March 16, 2016.
Ordinance No. 880-B, Revisions to Chapter 9.5 of the City of Southlake Code, Article V – Oil & Gas Well Drilling and Production. Item 6B.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Hot Work Loss Prevention Program
Washoe County Board of Adjustment
Jefferson County Planning Commission Hearing April 10, 2013
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Jefferson County RZ To amend the existing Planned Development (PD) zone district to allow for mini-warehouse storage. Case Name: Tri-Star Office.
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Land Use and Zoning Committee Special Workshop
Washoe County Board of Adjustment
General Requirements of NFPA 101
Hotel Conversions Background
City Council Meeting November 14, 2016
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Ordinance No. 880-B, Revisions to Chapter 9.5 of the City of Southlake Code, Article V – Gas & Oil Well Drilling and Production. Work Session

Presentation Summary of Changes based on Work Session discussion held August 2, 2011 Comparison with the Town of Flower Mound’s Ordinance Setback Survey (next meeting) Proposed Schedule Council Direction

Outcomes Direct staff on additions to the ordinance Direct staff on materials/information needed Set next meeting date

Section Definitions Section Variance Procedure Page 1 1. Drill Site – clarified definition 2. Fresh Water Intermittent Stream – added term 3. Fresh Water Perennial Stream – revised definition 4. Fresh Water Pond or Lake – added term 5. Revised language regarding variance requests 6. Provided consistency throughout ordinance when referencing “drill sites”

Section Variance Procedure Section Seismic survey Section Application and review of well permit Page 2 7. Revised language to provide consistency throughout the ordinance when referencing “gas and oil” 8. Clarify variance request procedure 9. Added language to provide insurance with seismic testing 10. Added requirement to provide more specific details to staff regarding scope of seismic survey 11. Added language to allow the City an option to engage third party in application review process 12. Revised requirements regarding the submission of MSDS materials

Section Application and review of well permit Page Added language to provide submission requirements for the noise plan 14. Revised language to clarify “site” 15. Revised language to clarify “site” 16. Added requirement for specific type of irrigation

Section Application and review of well permit Page Added “completion” phase to the required evaluation list regarding the submission of a leak detection and compliance plan 18. Added language to provide consistency between application requirements and on- site operation requirements. Also added a requirement for traffic impact analysis

Section Periodic reports Section On-site operation requirements Page Included “completion” phase to requirement for quarterly extended gas analysis report 20. Added language to clarify standards regarding the masonry perimeter wall and what may be visible from adjacent property 21. Revised language for air testing requirements to provide more specific details

Section On-site operation requirements Page Added language to include blowout prevention equipment such as downhole preventer valve and a blind shear ram. Also added language to address loss of well control 23. Added language to provide consistency between the definition and the text

Section On-site operation requirements Page Revised language to require compliance with City established dust suppression regulations 25. Added language to address loss of well control in the emergency response plan requirements

Section On-site operation requirements Page Added language to encompass all possible nearby water ways 27. Revised language to be more specific regarding water sampling 28. Added “HAP” to list of compounds for testing 29. Added language to include downhole preventer valve when testing surface casing 30. Revised language regarding thermal oxidizer

Section On-site operation requirements Section Workover or re-working of well; notice Page Pending discussion regarding 24/7 security guard requirement during production phase 32. Revised language requiring security cameras once temporary fencing is in place 33. Added requirement to include tracing or tagging additives into fracturing fluids

Flower Mound Ordinance Flower Mound’s changes focused on the following areas or issues: Notification Emergency Response Plans Insurance Landscaping Monitoring Noise Setbacks Variances Traffic Fracturing Hazardous Materials

Flower Mound - Notification Administrative Approval Public meetings and notice on possible pad sites that may qualify for administrative approvals Once oil & gas inspector determines application meets all ordinance requirements for administrative approval, within 30 days, notice of pending permit approval delivered to all property owners within 1,500 feet

Southlake – Notification Public Hearing – SUP 1,000 feet from the parcel surrounding the pad site, transportation route or pipeline route SPIN, Web Site (Gas 411)

Flower Mound - Emergency Response Plan Details submission requirements Details on all persons to be notified in the event of an evacuation, including, without limitation, all persons residing within one- half (1/2) mile of the edge of construction or surface disturbance. Within two (2) years of the effective date of the oil/gas permit and every two (2) years thereafter, the operator shall conduct an on- site emergency drill

Southlake -Emergency Response Plan Detail submission requirements Annual testing of the emergency plan

Flower Mound - Insurance General liability policy: $25 million per occurrence Excess or umbrella liability: $50 million excess and if no environmental pollution liability policy, $75 million Environmental pollution liability policy: $25 million Well control coverage: $5 million per occurrence with no aggregate, if available, otherwise $10 million Workers’ compensation/employers liability: statutory limits, employers’ liability with a minimum of $1 Million per accident Automobile liability: $1 million per occurrence

Southlake – Insurance General liability policy: $20 million per occurrence Excess or umbrella liability: $10 million Environmental pollution liability policy: $20 million Well control coverage: $10 million per occurrence Workers’ compensation/employers liability: $1million Automobile liability: $20 million per occurrence

Flower Mound – Landscaping/Screening Landscaping and vegetation complete within 45 days of completion of drilling of first permitted well Tree list Screen wall installed within forty-five (45) days following the completion of drilling the first permitted well or the derrick being removed.

Southlake – Landscaping/Screening Determined by the SUP Color Renderings Landscape Plan Irrigation Plan Line of Site Plan

Flower Mound - Monitoring Establish baseline data for air, water and soil monitoring Continuous air, water and soil quality monitoring (Leak Detection Plan) Continuous soil sampling for pits Venting or open flame restrictions: 1,000 feet, 72 hours notice Emissions compliance plan required if 2 notices of violation by TCEQ or EPA within 12 months

Southlake - Monitoring Establish baseline data for air and water monitoring Continuous air and water monitoring required Continuous air and water quality plan required to be submitted Leak Detection Plan required Vapor Recovery Systems required Venting not permitted

Flower Mound-Noise Noise mitigation required for drilling, fracturingand production operations Require establishment of daytime and nighttime ambient noise levels for the noise management plan Compression/production operations shall not exceed 3 db over ambient level No drilling, production or other operations shall produce a low frequency sound level that exceeds the following decibel levels: 16 Hz octave band: 65 db; 32 Hz octave band: 65 db; 64 Hz octave band: 65db

Southlake - Noise Basically the same except Southlake’s ordinance addresses pure tones Noise mitigation plan Mitigation measures must be outlined in the plan 3 rd Party Noise Engineer to evaluate plan

Flower Mound - Setbacks and Variances Residence/Habitable Structure 1,500’ from any residence or habitable structure; maximum 25% reduction with variance Schools, Religious Institutions, Hospitals or Public Buildings 1,500’ from any property line with school, etc.; maximum 25% reduction with variance

Flower Mound - Setbacks and Variances ESAs, Floodplain 750’; maximum 25% reduction with variance Public Road or ROW 750’ with no variance Existing Storage Tank 500’ with no variance

Flower Mound - Setbacks and Variances Property Line 750’; maximum 25% reduction with variance Public Park 1,500’; maximum 25% reduction with variance

Flower Mound - Setbacks and Variances Fresh Water Wells 1,500’; maximum 25% reduction with variance New Construction All new construction shall comply with applicable operation site setbacks/variances (Exception: pad sites permitted prior to ordinance effective date )

Flower Mound - Setbacks and Variances No permit issued unless USACE verifies to Town that pad site is not located within 3,000 feet of any federal public work (written approval provided) Private roads/drive – 20’ from property line

Southlake - Setbacks and Variances 1,000 feet from any habitable structure, or from the property line of any occupied public or private school or hospital 50’ – Tanks Variances approved by City Council

Flower Mound – Traffic Traffic Impact Analysis required Road Repair Transportation Routes

Southlake - Traffic Similar to Flower Mound’s requirements

Flower Mound - Frac/Haz Mat Notice of fracturing 3 business days in advance; posting of sign with white letters on red background. Only light sand fracture technology or technologies approved by the oil and gas inspector shall be used to fracture stimulate a well. The operator shall submit to the town a notarized letter from a hazardous materials.

Southlake - Frac/Haz Mat 20 day notification Green fluids

Setback Survey (Next Meeting) Discuss results of setback survey performed with neighboring cities What changes may be applicable for the City of Southlake?

Proposed Schedule Potential City Council 1 st Reading –October 4 th City Council 2 nd Reading –October 18 th

Questions?

Summary Spread Sheet –p. 1

Summary Spread Sheet –p.2

Summary Spread Sheet –p. 3

Summary Spread Sheet – p. 4

Summary Spread Sheet – p. 5

Summary Spread Sheet p. 6

Summary Spread Sheet –p. 7

Summary Spread Sheet p. 8

Summary Spread Sheet p.9