The Ups and Downs of Home Elevations. Presenters Kathy C. Hopkins, CFM, CTCM Mitigation Specialist- SRL Lead Texas Water Development Board Jamie Galloway,

Slides:



Advertisements
Similar presentations
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
Advertisements

Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
E257 State Directors Training - Mitigation 1 Hazard Mitigation Assistance (HMA) Borough of Westwood Hurricane Irene – FEMA 4021-DR-NJ  Sgt. Michael Gallagher,
American Dream Downpayment Initiative (ADDI). ADDI Basics  American Dream Downpayment Act (PL ) 12/16/03 - $86.9 million appropriated for FY2004.
HUD and Disaster Mitigation ASFPM May 22, Community Development Block Grant (CDBG) Disaster Recovery In response to a Presidentially-declared disaster,
Variances and NFIP Requirements. Floodplain Management Regulations  44 CFR Section 60.6(5)  A community shall notify the applicant in writing over the.
F EDERAL I NSURANCE AND M ITIGATION A DMINISTRATION Hazard Mitigation Overview Franki Coons Chief, Grants Implementation Branch Risk Reduction Division.
Chapter 6 Standards for Floodplain Development and Building Protection.
Update Training Meeting
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
Prepare + Prevent + Respond + Recover + Mitigate What is the match? 1.
Primary Residential Design Considerations
What is a Flood Map? Flood maps are integral part of communities’ disaster and emergency management system. The Federal Emergency Management Agency (FEMA)
Floodplain Management Regulations and the Florida Building Code
Emergency Management Cycle. Planning Regulatory Requirement Per 44 CFR (a) (1) - For all disasters declared on or after November 1, 2004, all states,
1 Flood Insurance. 2 Flood - History History of the Law –National Flood Insurance Act of 1968 Federally subsidized insurance became available Voluntary.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
Unit 1 Community Capabilities
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
Monday, May 2, 2011 W-10 Clarification of Rules and Regulations Presenters: Steve Van Dyke, Tyrone Gregory & Carleathea Greenhill Facilitator: Corise Morrison.
Higher Regulatory Standards Series 430. Higher Regulatory Standards 432 Elements Dougherty County (2007 Manual) – Total Points: 2740 – Activity 430.
Capital & Operating Leases ODJFS Office of Fiscal & Monitoring Services Bureau of County Finance & Technical Assistance OJFSDA Conference, June 2009.
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
January 29, 2014 Community Development. Overview of the EPA Renovation, Repair and Painting Rule (RRP Rule) as it relates to the HUD Lead Safe Housing.
Increased Cost of Compliance The Basics (Last updated July 25, 2006)
A Virginia Mitigation Success Story Central Shenandoah Planning District Commission Bonnie Riedesel Jason DeBord, CFM Rebecca Joyce Virginia Hazard Mitigation.
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Governor’s Office of Homeland Security & Emergency Preparedness.
Community Development Department Easement Encroachment A/C Units.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Session 17Slide 17-1 Financing Risk Reduction Session 17 Slide Deck.
Town of Kill Devil Hills Flood Plain Management & Regulations October 2007.
Hazard Mitigation Funding Programs. Current Florida Mitigation Programs 1.Hazard Mitigation Grant Program* (HMGP) Hazard Mitigation 3.Pre-Disaster.
IMPROVING YOUR FEMA FLOOD INSURANCE RATES David G. Ray, PLS Nantasket Survey Engineering, LLC Hull, MA.
Objectives At the end of this unit, you should be able to:
MW-AT E Addressing the Challenges of Recovery & Rebuilding from Hurricanes Katrina & Rita Rebuild Louisiana Housing Programs February 20,
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Permit Process & Application Guide
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
UPDATE REGARDING PW ADMIN BUILDING NOVEMBER 2, 2015.
CDBG Disaster Recovery Overview U.S. Department of Housing and Urban Development.
Winter Storm “Jonas” Hazard Mitigation Grant Program Avalon, Ocean City, Sea Isle City and Stone Harbor March 15, 2017.
March 25, 2017 – Sea Isle City April 1, 2017 – Ocean City
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
FEMA PUBLIC ASSISTANCE - A PRIMER
PUBLIC ASSISTANCE GRANTS
Floodplain Management Program Benton County
Flood Damage Prevention Code Update
In The Clear: Title and Ownership
Remodeling and Renovating
Glynn County, GA Flood Remapping January 2018
Home Elevation Flood Mitigation Assistance (FMA).
Building Safer, Smarter, and Stronger: A State’s Commitment to Avoiding Future Losses
Oklahoma Department of Emergency Management
Individual Assistance (IA) Individual Household Program (IHP)
HUD 203(k) Renovation Loan Program
FEMA’s Hazard Mitigation Assistance Grant Programs
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Right of Way Certification
Presentation transcript:

The Ups and Downs of Home Elevations

Presenters Kathy C. Hopkins, CFM, CTCM Mitigation Specialist- SRL Lead Texas Water Development Board Jamie Galloway, CEM, TEM EMC City of Nassau Bay 2

Hazard Mitigation Grant (HMA) Programs Hazard Mitigation Grant Program (HMGP) Flood Mitigation Assistance (FMA) Pre-Disaster Mitigation (PDM)

Who is Eligible? The following entities that are participating in the NFIP: State-level agencies Indian Tribal governments Local communities A FEMA-approved Hazard Mitigation Plan is also required.

HMA Eligible Activities

Mitigation of Flood Damaged Homes

Primary Mitigation project types Home Elevation Home Acquisition and Demolition Mitigation Reconstruction (aka - demolition and rebuild)

Physically raising existing structure to a higher elevation at or above the BFE Guidance States building must be structurally sound and capable of withstanding elevation Structure Elevation

Elevation One of the most common retrofitting methods is elevating When a house is properly elevated, the living area will be above all but the most severe floods (such as the 500 year flood). Almost any home can be elevated Most elevations in TX are slab on grade

Raise existing structure at or above base flood elevation (BFE) or alternate elevation Project must be cost-effective Elevation methods: – Elevating on continuous foundation walls – Elevating on open foundations such as piles, piers, posts, or columns – Elevating on fill Prior flood loss or depth in the flood plain determine benefit Method of elevation drives cost 10 Elevation

11  Engineering services  Surveying, soil sampling, Elevation Certificate, title search, deed recordation fees, legal and/or permitting fees, project administration, and construction management  Disconnection of all utilities  Building of a foundation so that the lowest floor is at the BFE or higher if required by local ordinance or FEMA  Physical elevation of the structure and subsequent lowering and attachment of the structure onto a new foundation  Construction of a floor system that meets minimum building code requirements when the existing floor system cannot be elevated or is not appropriate for the new foundation  Reconnecting utilities and extending lines and pipes as necessary and elevating all utilities and service equipment Eligible Costs

12  Debris disposal and erosion control  Repair lawns, landscaping, sidewalks, driveways if damaged by elevation  C onstruction of a utility room above BFE only if there is no existing space within the house for this purpose or there is no alternative cost-effective way to elevate the utilities  Elevation of existing decks, porches, or stairs  Construction of new stairs, landings, and railings to access the elevated living space per minimum code or local ordinance  Construction of ADA-compliant access facilities or ramps  Documented reasonable living expenses (not food or transportation) are incurred while the owner is displaced by the elevation construction  Abatement of asbestos and lead-based paint  Filling basements with compacted clean fill Eligible Costs

Elevating structures that were not in compliance with current NFIP standards at the time of construction Costs related to building additions or auxiliary structures Construction of new decks or porches Any improvements for purely aesthetic reasons, unless required by the EHP compliance review Costs to replace or repair utility service components that are undersized, inadequately designed, or unsafe, unless required by code (except utility rooms noted as eligible costs) Exterior finish on the exposed foundation of the elevated building, unless required by EHP compliance review and or local code Additional landscaping for ornamentation beyond what existed on the site prior to construction of the project (e.g., trees, shrubs) Ineligible Costs

Home Elevation Topics for Discussion Contractor Selection/procurement options Pros and Cons of differing contracting vehicles – Three way agreements or contracts between subapplicant and homeowner and between homeowner and elevation contractor ADA requirements for ingress and egress Elevators and impact on post elevation NFIP policy rating Grant eligible elevation costs VS homeowner expenses – Limiting homeowner “add-ons” Options and approaches for elevating attached garages, desks, etc. Performance Bonds, Payment Bonds and insurance Warranties for elevated structure foundations, mechanicals, and workmanship

Contractor Selection/procurement options Two primary procurement processes – Community selects/hires elevation contractor Community – Hires A/E firm that develops bid specs – Obtains homeowner concurrence on specs – Releases RFP for elevation – Reviews responses and selects contractor »Typically lowest, most responsive – Contracts for the elevation of a private structure Important -- Check with State and FEMA on any specific procurement requirements

Contractor Selection/procurement options Two primary procurement processes – Community identifies eligible contractors/homeowner selects contractor Community – Develops/advertises RFQ with minimum requirements – Reviews RFQ responses – Downselects to group of qualified, experienced elevation contractor pool Homeowner – Obtains minimum of three bids – Chooses contractor that want to elevate their home – Provides bids and selection to community Community – Reviews bids and homeowner selection – Concurs with selection Important -- Check with State and FEMA on any specific procurement requirements

Pros and Cons of differing contracting vehicles If Community bids and selects contractor, contract for elevation will be between Community and contractor If Homeowner selects contractor (with community oversight) two primary contracting options 1.Tri-party agreement between community, homeowner, and contractor 2.Two agreements 1. One between community and homeowner passing along terns of grant 2. Construction contract between homeowner and contractor 1.Typically with community input on draft schedule and any specific required clauses

ADA requirements for ingress and egress Homeowner must: Provide a Physician’s written certification that meets FEMA’s HMA Unified Guidance Owner or member(s) of the owner’s family have a permanent physical disability, a Physician’s written certification is required The physician’s written certification should contain, – Name of person requiring Access Facilities and relationship to the homeowner – Description of the disability, – Whether it is temporary or permanent, and – Type of ADA access facilities required as a medical necessity Cost breakdown for the ADA access facilities that meets the minimum industry standards as described in the physician’s written certification and the applicable community’s codes. Costs above minimum requirements responsibility of the homeowner If ramps are not technically feasible to build, a mechanical chair lift may be installed Only two stop elevators will be grant reimburseable

Elevators and impact on post elevation NFIP policy rating Elevators must be submitted to FEMA for rating Homeowner will need to provide to FEMA – Manufacturer spec for elevator and its installation – Engineer certification that elevator was installed per manufactures specs Elevators installed in floodplain should – Be designed/manufactured to “get wet” – Run on open rails where possible Not in an enclosed shaft – If enclosed shaft is required Must be properly vented If is V zone, must have breakaway walls If in V zone, sqft of enclosure will be counted toward 299 sqft minimum – Mechanical systems must be above BFE (and freeboard if applicable) – Call buttons should be hardened to extent possible – Car should always return to upper stop after use – Car should have two safety Return if hits an obstruction Returns if hits water

Guidance has list of eligible vs ineligible costs, but that list is not overly specific Grant eligible – Two stop elevator (where ADA requirements have been met) – Minimum code compliant ingress/egress – Unfinished foundation Pilings Exposed elevated slab Block chain wall – Items required by City-wide ordinance Eg – Three sided enclosure on elevated structures – Homeowner expenses Attempt to limit to only items that are infeasible to do after the elevation is complete Lifting above minimum floodplain requirement Foundation decorative block in place of minimum code compliant concrete block Larger or upgraded ingress/egress decks, porches, stairs HOA requirements above minimum code compliant requirements Upgrading non-code compliant items such as interior wiring or plumbing Note: Elevation with FEMA funds does not trigger substantial improvement Grant eligible elevation costs VS homeowner expenses

Options and approaches for elevating attached garages, desks, etc. Eligible cost includes Elevation of existing decks, porches, or stairs – If existing decks and/or porches can be lifted and pilings extended, it is eligible Grant will not pay to build new decks or porches if they cannot be lifted Garages are compliant on the ground (not elevated) Where a garage is integrated into the house, the most cost effective option should be done – Slab separate and extend garage walls – Detach the garage from the house – Elevation the garage slab with the house Detached garages are not grant eligible to be elevated Garages attached via a breezeway follow the most cost effective path – Detach from home and repair damage to connection to house – Stab separate and extend garage walls – Elevate with house

Performance Bonds, Payment Bonds and insurance Performance bonds from an A1A firm should be obtained in the full cost of the lift – Originals should be provided before NTP to contractor Payment bonds from an A1A firm should be obtained in the full cost of the lift – Originals should be provided before NTP to contractor Need to review the bonds you are getting to ensure there are no “outs”’ for the surety Insurances (must be current at all times) – GL – PL – Auto – Workers comp – Builders risk – Cargo/riggers/lifters Typically, having the above in hand is a condition of giving NTP

Warranties - foundations, mechanicals, and workmanship Decide what type of post elevation warranties are appropriate Used to require – 5 years on each, structural foundation system, mechanical reconnects, workmanship Currently evaluating industry standard construction warranties – Considering requiring a Warranties should be backed by an independent firm – Will arbitrate between owner and contractor on warranted items – Will fulfill if contractor is no longer in business

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

A picture is worth a 1,000 Words A Picture is Worth A Thousand Words

NFIP insurance must be maintained for the life of the property regardless of ownership Deed Restriction Requirement

“ This property has received Federal hazard mitigation assistance. Federal law requires that flood insurance coverage on this property must be maintained during the life of the property regardless of transfer of ownership of such property. Pursuant to 42 U.S.C. 5154a, failure to maintain flood insurance on this property may prohibit the owner from receiving Federal disaster assistance with respect to this property in the event of a flood disaster. The Property Owner is also required to maintain this property in accordance with the floodplain management criteria of 44 CFR Part 60.3 and City/County Ordinance.”. Deed Restriction Requirement

Reference Documents FEMA Above the Flood: Elevating your Flood Prone House FEMA P Homeowner's Guide to Retrofitting Second Edition FEMA 551, Selecting Appropriate Mitigation Measures for Floodprone Structures (2007). FEMA P-550, Recommended Residential Construction for Coastal Areas: Building on Strong and Safe Foundations (2009

Questions? Prepared by Jeffery S. Ward and Associates, Inc.