Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

ODOT Structure Project Manager Seminar Specifications
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
ODOT Structure Project Manager Seminar Concrete Decks
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Supervision and Administration
District Information Session For the American Recovery and Reinvestment Act.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
Alternative Project Delivery
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Things to look for and remember while preparing FD05 Estimates.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Module 7: Construction Phase
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Highway Utility Engineer, INDOT
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Indiana High Value Research Tommy Nantung INDOT Research and Development.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
P3 (Preventive Pile Protection)
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
High Bridge Re-Deck Project
Project Purpose and Objective
New Bridge Construction
Surface Preparation before laying Hot Mix
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Introduction to Pavement Design
Pavement Preservation
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Prime Factors for Successful Preservation Treatments
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group

A protective wearing surface placed on a (usually) existing bridge deck to prolong the service life and to provide a smooth riding surface The overlay protects the deck by providing a non- permeable sacrificial layer that prevents water and chlorides from penetrating to the deck reinforcing steel Typical overlay materials include: Latex modified concrete Microsilica Thin polymer synthetic Asphaltic What is a Bridge Deck Overlay?

History of the Bridge Deck Overlay in Indiana First used by INDOT in the early 1970s Bridge deck overlays placed at the rate of between 40 to 60 projects annually (State and Local) One of the most cost effective method of bridge deck preservation and “ride ability”

Typical Cross Section Typical Slab overlay with railing updates.

Just Deck Overlays projects $8.4 million projects $24.9 million ranging from $76,000 to $2.7 million projects $13.2 million Bridge deck overlays may also be a part of other project types like: Bridge Rehabilitation or Repair Bridge Maintenance and Repair Bridge Deck Reconstruction and Widening Bridge Deck Reconstruction

Bridge Deck Overlay Project Identification District programs project based on condition rating of deck and existing wearing surface, if applicable Normally, a rating of 5 will trigger programming

Factors to consider for an Overlay Age of Deck Chloride Contamination Deck Condition ( % delamination) Areas of efflorescence (viewed from the deck underside) Structural Widening Load Rating

Bridge Deck Overlay Project Scoping An initial scoping field check should include; the designer related district personnel a representative of the central office bridge rehabilitation group. If questions arise as to the deck quality, core samples may be requested for testing for chloride ion content and/or fragmentation.

Scoping Report FORMAT See IDM Figure 72-2B for typical outline For Overlay projects use Design Tables from Chapter 55 The report contains but is not limited to: existing conditions repair recommendations cost estimates a design criteria checklist permit information a maintenance of traffic recommendation.. design exception write-up (if applicable) IDM (01) Is a stand alone document submitted with the inspection report

Scoping Report (con’t) Prepared by designer Reviewed by Central Office Bridge Rehab To obtain design approval Also at this phase, the environmental section will begin their work on the categorical exclusion documentation

Bridge Deck Overlay Preliminary Plans When design approval has been granted, the designer should proceed with developing preliminary plans. Preliminary plans include: the title sheet the general plan sheet the maintenance of traffic detail sheets. The general plan sheet should include all recommendations as approved in the scoping report.

Preliminary Plan General Plan

Maintenance of Traffic (MOT) The MOT details for non divided highway bridges will normally entail a signalized alternating one way traffic scheme. A crossover may be utilized for divided highway bridges. For highways with >10,000 AADT, it is advisable to maintain one lane in each direction to avoid traffic congestion at the project site. Detours are an option on most Local Projects and on some INDOT Projects given the AADT is low and with approval from District Traffic Department

Typical Alternate One-Way Traffic Scheme MOT detail alternate one way with signal

Environmental Issues Also submitted with the preliminary plans will be any environmental permits. These may include: Rule 5 DNR Construction in a Floodway IDEM 401 Army Corps of Engineers 404

Railroad & Utility Coordination The preliminary plan submittal will be the initial coordination regarding any railroad or utility issues

Preliminary Plan Approval Once preliminary plans have been approved, the designer should start work on preparing FINAL PLANS.

Final Plans Final Plan details could include: bent reconstruction details bridge railing details superstructure details bridge approach details substructure related details Special provisions, final quantities, a cost estimate and a load rating request are included

Final Field Check All previous parties are invited Primary purpose is to verify that the plans reflect the improvement needs Any changes in field conditions are evaluated for plan content impact

Final Tracings Designer should make revisions based on final field check notes and project reviewer input The submittal should include: all plan content updated special provisions final quantities cost estimate approved environmental permits all project commitments report

Tracing submittal will be delivered to the project manager often times a month or more before RFC. Please check with your project manager for due date. MEET YOUR RFC DATE!!! Project manager will deliver contract package to the CO Contracts Section

Am I Done Yet? During the period between RFC and letting, the designer will be available to field issues and questions that may arise from the Contracts Section and District Construction Questions from bidders should be referred to Central Office Contracts Section During the construction period, the designer will be available to field issues and questions that may arise

Some Bridge Deck Overlay Examples

SR-243 at Deer Creek - overlay removal and replacement

SR-243 at Deer Creek - Deck underside

SR-236 over S. Fk. Little Raccoon Creek overlay removal and replacement

SR-236 over S. Fk. Little Raccoon Creek deck underside

SR-67 over Fish Creek original bridge deck

SR-67 over Fish Creek deck underside

US-41 over Main Street (Vincennes) overlay removal and replacement

US-41 over Main Street (Vincennes) deck underside

Additional Elements in Overlay Projects Full Depth Patching When the concrete is unsound to the top layer of the bottom reinforcing, all concrete will be removed and a full depth patch is warranted. (Spec ) Included in this cost is; Removal of unsound concrete Cavity preparation Furnishing and applying bond coating or adhesive Any necessary incidentals Patching material is not included in this item

Additional Elements in Overlay Projects Partial Depth Patching Cavities which are deeper than the level of the adjacent prepared deck surface, but not full depth, shall require partial depth patching (Spec ) Included in this cost is; Removal of unsound concrete Cavity preparation Furnishing and applying bond coating or adhesive And necessary incidentals Patching material is not included in this item

Additional Elements in Overlay Projects Additional Bridge Deck Overlay Material Is the quantity of material placed on a bridge deck minus the theoretical bridge deck overlay (bridge surface, area times overlay depth) Covers the material placed in the partial depth patch and the full depth patch.

Additional Bridge Deck Overlay Material (con’t) Paid for at the unit price of $ per cubic yard (RSP 722-B-581) For Estimating Quantities = *(Sft. Deck patching) *(Sys. Of Overlay) factor assumes an average 2” deep patch factor assumes a 6% increase for surface irregularities. See IDM (02)

Additional Elements in Overlay Projects Joint Replacement Acceptable joint types Class Strip Seal (SS-type) Expansion Joint Sealing System (XJS-type) Modular Joint (MS-type) No Compression Seal (BS-type) allowed IDM (02)2 No Polymer Modified Asphalt Joint system allowed

Class SS Expansion Joint

Expansion Joint Sealing System (XJS)

Modular Expansion Joint

BS Expansion Joint These joints are to be replaced when encountered

Asphaltic Bridge Joint These joints are to be replaced when encountered

Additional Elements in Overlay Projects Semi Integral end Bent Eliminates the need for expansion joint See Design IDM Figure 67-1C For skews of greater than 30 degrees or expansion length of 250 feet or longer, twisting or racking of the bridge should be investigated. (IDM )

Semi Integral End Bent Detail

Additional Elements in Overlay Projects Approach Slabs Are detailed within the plans to allow for MOT factors and traffic phasing Lap splices and threaded tie bar assemblies are especially important in this detail

Additional Elements in Overlay Projects Wedge Details for new overlays Placed to allow a smooth transition from the approach slab to the existing pavement surface. Two Types of wedge details Concrete Pavement transitions (recast concrete approach pavement) Asphalt Pavement transitions (mill and wedge asphalt over existing)

Concrete Pavement Wedge Detail

Asphalt Pavement Wedge Details

Additional Elements in Overlay Projects Hydro Demolition After the initial milling of the deck, this operation removes all unsound bridge deck concrete in a uniform manner and does so without the use of jack hammering With the use of Hydro Demolition, the need for “partial depth patching” pay item is not required

Additional Overlay Project Information For Project Specific Information contact George Snyder INDOT Bridge Rehabilitation Engineer for additional guidance or more questions. IGCN Room N-642 Indianapolis, IN (317)