2012 Dedham Police Station by BPCC. FEASIBILITY STUDY TOWN OF DEDHAM POLICE STATION Completed October 5, 2009 by Dore and Whittier This report is based.

Slides:



Advertisements
Similar presentations
STRATEGIC FACILITIES MASTER PLAN for Village of Holmen, WI BRIEF OVERVIEW.
Advertisements

Asheville Regional Airport/City of Asheville Fire Station Feasibility Study Public Safety Committee June 25, 2012.
Proposed New Police Station Proposed New Police Station Article 4, 2007 Annual Town Meeting.
Weller & Michal Architects Inc. Peterborough Municipal Facilities A Needs Assessment Study.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Review of Town Building Needs Ad-Hoc Building Study Group.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Wollaston Center Parking Study April 16, Study Area 0.2 miles 4 min walk.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
The Catholic Community of St. Thomas More New Building Committee.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
CITY HALL MATRIX AIRPORT PROSCONSDATA Existing Offices Existing Chambers Furniture in place Data/com in place Current EOC Sufficient Parking FAA timeline.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
Department of Public Safety Bonding Request 2012 Kris A. Eide DirectorHSEM.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
CITY COUNCIL WORKSHOP MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) DECEMBER 20, 2011.
Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
NEW GOVERNMENT CENTER WEST DEVELOPMENT OPTIONS January 14, 2015.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
1 MidTown Office Tower former Red Carpet Inn Site Presentation February 12, 2011.
City of Leon Valley Town Hall Meeting. Background Since 1972, when the original City Hall was built, the City of Leon Valley has grown by over 8,900 residents.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
“So You Want a Grocery Store...” Florida Redevelopment Association 2011 Annual Conference Don Paight Fort Myers CRA Executive Director.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) April 28, 2009 Board of County Commissioners PUBLIC HEARING.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management November 19, 2013.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Calle Real Campus Design Guidelines. Five-Step Process 1999 Board Direction, create a five phase process--- –Phase 1: Determine Space Needs –Phase 2:
Wherever Your Path May Lead …. RTS Takes You There!
Department of Public Works Recommended Residential Impact Fee Distribution Methodology Change October 26, 2015.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Newtown Police Department Facility Needs Assessment A comparison of our facility with newer facilities of similar makeup. By Lieutenant David Kullgren.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
South Greenville Recreation Center and Park Master Plan.
Board of Selectmen Meeting April 14, Outline  Overview of problems  Overview of original plan  Overview of new plan Highlights Cost Timeline.
Site & Building Assessment Study Conducted by: Caolo & Bieniek Associates, Inc. Fire Station Study Committee Report to Select Board September 18, 2006.
Community Space Needs Presentation to the State of the Town Meeting Saturday, November 9, 2013.
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Brookline Facilities Study Committee Preliminary plan for a new Ambulance and Police facility with Town Hall office expansion – 6-Jan-2003 Committee Members.
Government Center Study Update City of Creve Coeur December 8, 2014.
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
Council for Quality Growth North Fulton Advisory Meeting
SUTTON POLICE DEPARTMENT
Brewster Ladies’ Library Design & Renovation Project
Facilities Committee Rootstown Local School District January 16, 2017.
Common Surveys Used For Commercial Real Estate Transactions
Valley & Third Streets Redevelopment
Fair Lawn BOE: Concept Planning
City of Pilot Point 2018 bond election
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Downtown Parking Update Parking Advisory Committee
Presentation transcript:

2012 Dedham Police Station by BPCC

FEASIBILITY STUDY TOWN OF DEDHAM POLICE STATION Completed October 5, 2009 by Dore and Whittier This report is based on information gathered by visual observations of the building and site by Dore & Whittier Architects, Inc. and their consultants on July 21, 2009, a review of Owner provided drawings (Kilham, Hopkins, Greeley & Brodie Architects dated Feb 7, 1962 and the Carell Group dated February 21, 1997) as well as discussions with public safety staff.

The police station is located on High Street in Dedham, Massachusetts. It is centrally located in the downtown business district. The original police station was constructed in 1962 with no major additions or major renovations having been made since the time of the original construction. The existing site is approximately 1⁄2 acre. Some parking is provided on site with overflow parking provided on‐street. The police station structure is essentially a two story masonry, concrete and steel structure with a full basement and an attached single story, two bay garage and a single story storage and shop structure. Brief History

Existing station Roll Call occurs in the booking/processing area. This space is too small and cannot be used if a prisoner is in the facility. The restroom/locker area is undersized for the number of occupants. Additional lockers are stored in corridors, limiting the egress width and circulation space. The shower area is in poor condition. We were told very few of the officers use the showers due to its current condition. There should be a separate male and female shower/locker room. At this point, this facility is shared. The kitchen was converted to an office, thus eliminated a break room in the facility. A microwave and small refrigerator were located on a table in the dispatch area. Many storage rooms have been converted to electrical/server rooms without upgrading for adequate ventilation/cooling. Plan for renovations/additions to provide adequately sized spaces to allow for proper function of the police station. A multipurpose space could serve as roll call space, conference room, interview room, an area for additional lockers if needed, etc. Prisoner booking and processing serves as a corridor and contains items that could be used as weapons. The desk is not durable and the computer is compromised.

New station Sally port Booking and processing area Juvenile holding Evidence processing area Men's locker room Woman's locker room Secure weapons room Firing range

Site Review Comparison Existing Police Station Gonzalez Field Saint Mary's Parking Dexter School Red Cross/ Rustcraft Papa Ginos Wilson Ave. Bank of America Bridge Street Existing Town Hall

ExistingGonzales Field St Mary’sDexterRed CrossPapa Ginos Wilson Ave Bank of America Bridge Street Town Hall Size Zoning Distance from center Access Response Security Visibility Utilities Floodplan Wetlands Subtotal Rate each Site per Criteria using 1= Preferred, 5 = Not Preferred

PROS Prime location (central to downtown) No costs associated with new site purchase assuming lease continues Sustainable practice in re-use of existing building Great access to downtown for response City Utilities are available Site development costs should be minimized High visibility for public interaction CONS Small site does not allow for full realization of desired program (under by approximately 3,000 SF) Very limited parking available; Does not meet police needs Difficulties associated with connecting a new building to an existing building Have to deal with inadequacies of existing building arrangement/construction Building site is not owned by Police/City High visibility causes some security concerns related to vulnerability. Existing Police Station Site Accessed value $ 1,317,400

PROS Ample space to meet program needs and parking requirements Located near Town center Good visibility from main road and residential area. Good local access and access to Town center Good opportunities for securing building City Utilities available CONS Large slope requires increase in site development costs Large culvert runs through site limiting overall development. Land purchase costs, Massachusetts’s greenspace policy affects use of site Elevated roadway adjacent to site offers security concerns Gonzales Field Accessed value $ 1,317,400

PROS Ample space to meet program and parking requirements Sloping site could allow for upper level and lower level entry Good access to two streets for response High visibility with potential to maintain security City Utilities are available CONS Distance to Town center. No presence in Town center. Sloping site may increase site development costs Saint Mary’s Parking Accessed value $ 418,300

PROS Program and site requirements can be met on site Potential for providing secure site and building City utilities available Potential for visibility while maintaining security CONS Limited site access with potential for blockage if utilize existing access drive Rock formations and flood plain may increase site development costs and may be prohibitive Site Acquisition costs No presence in Town center at this location and increases response time to Town center. Dexter School Site Accessed value $ 4,155,000

PROS Renovation of portion of existing building will be a cost savings over a complete new build. Plenty of space / parking available for future expansion. Sustainable practice in re-use of existing building Good local site access and access for the public. City Utilities available CONS Site and building are far larger than what is actually needed by program. Other building occupants and potential occupants pose a risk to police security. Site is 1.8 miles from Town Center. No presence in Town center and longest response to Town center. 75% of site is within 100 year floodplain Building is visible from street, but not fully used for police so offers some vulnerability without full police visibility. With other building occupants, the ability to modify the building to provide optimum security may be limited. Red Cross/Rustcraft Accessed value $ 12,862,500

PROS Ample space to meet program needs and parking requirements Existing drives which could be reused Close to Town center for good response City Utilities available Good site access and opportunities for securing building High Visibility for public interaction with opportunity to maintain secure perimeter CONS 100% of site within 100 year floodplain Land purchase costs Papa Gino’s Accessed value $4,923,800

PROS Ample space to meet program needs and parking requirements Sloping site could allow for upper level and lower level entry Good visibility on Washington Street with good street presence while maintaining secure perimeter City Utilities available CONS Most of parcel is unusable because of creek/wetlands on site Steep contours limit access to site to one corner access point. Distance to Town center increases response time and doesn’t provide presence in Town. Wilson Avenue Accessed value $ 71,000

PROS Existing building and new addition combined are within 300 SF of requested program Ample existing parking already exists on site Building is on a corner lot, which could allow access to street from multiple locations (if desired). Good site access and visibility on Washington and Elm, with adequate ability to maintain building security. Sustainable practice in re-use of existing building City Utilities available CONS Have to deal with some inadequacies of existing building arrangement/construction. Construction could disrupt activities in adjacent building Site is 1.2 miles from Town Center. No Town center presence and increased response into Town. Security issues with additional building square footage connected to police used square footage Bank of America Accessed value $ 5,418,100

PROS Sustainable practice in re-use of existing building Capable of future expansion Existing building is shielded from the street by another building for limited visibility, but added security. Adequate parking and ability to contain desired program City Utilities available CONS Site and building are slightly larger than what is actually needed by program. Unused space or other occupants offer increased risk to security. Site is 1.2 miles from Town Center. No Town center presence and increased response time to the Town center. Site is in 100 year floodplain Limited visibility to public. Limited local site access with only one access point that may block response from the site. Bridge Street Accessed value $ 4,999,400

PROS Located in Town center Provides police presence at town administration building for added security of existing building City Owned land Good response to Town center City Utilities available CONS Small site does not allow for full realization of desired program (under by approximately 1,500 SF) Very limited parking available; Does not meet police or existing building needs. New building would have to abut existing town hall. Interface with the existing building could present problems. Construction could disrupt existing Town Hall activities and/or bother employees Existing building access would be disrupted by new building. Site access for police limited by amount of building needed on site. Limited police visibility at back of the site Existing Town Hall Accessed value $ 2,367,600

Identify the preferred site Identify funding Prepare for neighborhood meetings ZBA Planning Board Conservation Committee Prepare for town meeting RFP Construction schedule