MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Progress and Plan for Superconducting RF Cavity RF Group.
Status of Nb sample study TILC09 Main Linac S0 session 18 April 2009 T. Saeki on behalf of SRF surface analysis group at KEK.
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
EP parameter comparison between JLab and KEK 28 Mar ILCW2010 at Beijing, GDE/Main Linac session T. Saeki.
New HOM coupler design Demountable Damped Cavity (DDC) Sokendai, The graduated university for advanced studies. KEK, LL / Ichiro Cavity Group October 21,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
MHI#10 号機の 1 回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process Period : 2010/5/11 ~ 5/17 Process : EP2(20μm)
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Field emission issue and strategy to improve H. Hayano.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
 Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP1 Period : 2012/2/23 ~ 2/27 Process : Degreasing (FM-20,
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
MHI#15 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/2/22 ~ 2/28 Process :
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
MHI#10 号機の局所研磨の残りと 2回目の EP1 処理  Process log  Status of working  Result of pre-EP/EP1  Comparison of EP1 between MHI#10 and #11 Period : 2010/3/8 ~
MHI#14 号機の1回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/1/11 ~ 1/17 Process :
Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Quality control of EP in KEK-STF TTC meeting April 21 st 2010 FNAL Motoaki SAWABE.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Hao Guo LINAC Department Institute of Modern Physics.
The problem of incrustation on Nb surface after CP or EP processing. STF Surface Research Group. M.Sawabe, H.Hayano, H.Monjushiro, S.Kato, T.Saeki, & T.Kubo.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
MHI#16 号機の3回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/1/5~
Survey the cavity degradation mechanism under Dis assembly/assembly procedure for cERL cryomodule at KEK 1 Hiroshi Sakai, Takaaki Furuya, Masato Sato,
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Summary of STF-EP facility at KEK.
Vertical Electro-Polishing activities at CEA Saclay
ILC10 Beijing Global Design Effort
Assembly of Crab Cavities couplers in SM18 clean room
ILC-SCRF Test Facilities considerations
Vertical Electropolishing at Marui & KEK
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
S0 Status report from KEK
Effort Torwards Improving Large Scale Production for SC Cavities
S1-G Webex meeting Global Design Effort
Recent results of Vertical-EP at KEK-Marui
C50 Cavity pair Assembly Changes
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
Quality control study with single-cell cavities
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Cavity & Cavity Integration; recent KEK activities
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process : EP2(5μm) under low current density, Improved 1 st Water Rinsing, & Flange using FM-20, Degreasing(FM-20, 2%) [1hour], HPR x 2 [10 hours], Assembly in C.R., Vacuum evacuation, Leak check, ℃ (48hours) Preparation : Washing vacuum components with ultrasonic, Cleaning in C.R. Workers : M. Sawabe, Kirk, M. Satoh (KEK), K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.), T. Okada (K-VAC), M. Asano, S. Imada, T. Yanagimachi (Nihon Advanced Technology) Kirk 1 STF Cavity Group

2 EP acid (4/20 のサンプルを使用 ) Nb ingredient : 9.6g/ℓ HF ingredient : 25 g/ℓ ( 全体 34g/ℓ の 65% が反応に使われる ) Al ingredient : 18mg/ℓ Current density : ~ 37mA/cm 2 ( 最近の傾向より ) Cavity surface temperature : <35 ℃ Control Voltage : 温度と電流密度を見ながら制御 With normal N 2 gas flow during extracting EP acid (8ℓ/min) 1 st water rinsing (1.5hours) Improved version (25ℓ/min で 20 分間上下から流し続ける ) 1 分毎に 1 秒間水抜きを繰り返す (40 分間 ) 最後の 30 分は 10min (storing)/3min (flushing) で行う Degreasing (1 hour) FM-20(2%) HPR ( ~ 10 hours) 5h17m (6 turns, w/o blind flanges) 4h23m (5 turns, w/ blind flanges) Condition of EP2 & Rinsing & Flange using FM-20 using FM-20 EP2 を 1 ~ 2 回行ったぐらいではたいして変化しない

Process log ① STF Cavity Group 3 5/10 9:40Check every flange / Polishing input port by scotch bright 9:55~Attachment of jigs for EP 10:17HPR operation starts without cavity 10:44Set cavity to EP bed with crane 11:00Installation of cathode bar to cavity [O.K.] 11:04Meeting for tomorrow’s working procedure 11:12Set data logger to cavity (totally 12ch) 11:30Leak check with N 2 gas [O.K.] 12:00Lunch time 13:20HPR operation stops Preparation for EP is completed 14:00~Vacuum parts rinsing with ultrasonic in C.R. 15:30fin.

STF Cavity Group 5/1110:10Cavity rotation starts / EP acid flow starts 10:30EP2 starts 10:47EP2 stops [17m00s] / Idling rotation (3 rpm / 20min) / Plastic case detachment 11:07Idling rotation stops 11:10EP acid is removed from cavity with N 2 gas flow(0.020MPa) 11:23First rinsing with ultra pure water starts 12:54First rinsing with ultra pure water stops [1h30m] 13:00Detachment of restriction jigs / Data logger detached 13:20Un-installation of cathode bar from cavity / washing cathode bar (No black mark) 13:28transferring cavity from EP bed to wagon / Checking inside cavity [O.K.] 13:50Detachment of jigs for EP / Detaching every blind teflon flange / Checking inside cavity (white mark is found at cell#9) 14:00Brushing at every flange and HOM couplers using FM-20 / Shower rinsing 14:10Checking inside cavity (white mark is found at cell#9) 14:13Attachment of flanges for degreasing 14:23Flowing FM-20 into cavity 14:27Degreasing with ultrasonic starts 15:27Degreasing with ultrasonic stops [1hour] 15:30Removing FM-20 from cavity 15:40Detachment of flanges for degreasing Checking inside cavity (white mark is found at cell#9) 15:45Brushing at every flange using FM-20 / Shower rinsing Process log ② 4

STF Cavity Group 5/1116:00Transferring cavity from wagon on turntable for HPR using crane 16:05Checking tolerance between position of nozzle and center of beam pipe 16:191 st HPR for inside cavity starts 21:351 st HPR for inside cavity stops [5h17m] (6 turns) 21:40Attaching every blank flange in C.R. 22:09fin. 5/12 9:08HPR outside cavity with blind flanges starts [15mins] 9:242 nd HPR for inside cavity with blind flanges starts 13:472 nd HPR for inside cavity with blind flanges stops [4h23m] (5 turns) 13:55Cavity enters into C.R. 14:35Assembly in C.R. (Class 10) starts 16:20Assembly in C.R. (Class 10) finishes / Moving out from Class10 to Class :34Vacuum evacuation starts with heat guns 16:45Turbo pump status 100% 17:15Leak check -3 Pa  Leak occurred at three ICF gaskets around bellows (Too low quality again!!!)  Re-tightening screws / stop the leak / Re-leak check  O.K. ℃ starts Max Vacuum Level just after baking start : ~1.20 x Pa 18:17Cavity vacuum : 1.08 x ℃ /81 ℃ /50 ℃ /60 ℃ /48 ℃ /53 ℃ /19 ℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 19:55Cavity vacuum : 3.78 x ℃ /104 ℃ /86 ℃ /85 ℃ /? ℃ /79 ℃ /19 ℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) Process log ③ 5

Process log ④ STF Cavity Group 6 5/1312:00Cavity vacuum : 3.31 x ℃ /105 ℃ /89 ℃ /100 ℃ /87 ℃ /90 ℃ /21 ℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 5/1417:25Cavity vacuum : 2.61 x ℃ /105 ℃ /88 ℃ /100 ℃ /86 ℃ /97 ℃ /22 ℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 17:30Baking Off 17:43Ion Pump ON 17:50Cavity vacuum : 2.20 x ℃ /86 ℃ /? ℃ /71 ℃ /78 ℃ /90 ℃ /22 ℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 5/16 8:50Cavity vacuum : 0.99 x ℃ (0.0 x :30MHI#16 moves to V.T. stand

MHI#16 号機で見つかった白い模様 STF Cavity Group 7 1回目の EP2 後 2回目の EP2 後

色々な空洞で見つかった白い模様 STF Cavity Group 8 MHI#14 号機の1回目の EP2 後 MHI#15 号機の2回目の EP2 後 MHI#16 号機の2回目の EP2 後

最近よく起こる ICF のリーク箇所 STF Cavity Group 9

今回の組み立て中に見つかった不良のヘリコフレックス STF Cavity Group 10 スズメッキインジウムメッキ

STF Cavity Group Status of 2 nd EP2 for MHI#16 ① 11 current voltage T cavity T reservoir T room T cavity average current density 平均電流密度が 37mA/cm 2 程度になる ように電圧を調整する。 (low current density EP) voltage [V] average current density [mA/cm 2 ]

12 STF Cavity Group Status of 2 nd EP2 for MHI#16 ② 左図は平均電流密度と電圧の相関 右図は定常状態での分布 target

最近の定常状態の比較 STF Cavity Group 13 Cavity Mean temp. [ ℃ ]R.M.S. temp. [ ℃ ] Mean i [mA/cm 2 ]R.M.S. i [mA/cm 2 ] MHI-A 1 st MHI#12 1 st MHI#13 1 st MHI#12 2 nd MHI#13 2 nd MHI#14 1 st MHI#15 1 st MHI#14 2 nd MHI#15 2 nd MHI#16 1 st MHI#16 2 nd 今回は研磨量が 5μm と少ないためドリフトの影響が少ない。

Status of 2 nd EP2 for MHI#16 ③ STF Cavity Group 14 #1#2#3#4#5 #6#7#8#9#10 EP2 の間の空洞表面温度の状況。 #11 #12 Steady state:

STF Cavity Group Status of 2 nd EP2 for MHI#16 ④ 15 #1#2#3#4#5 #6#7#8#9#10 EP2 の間の空洞表面温度の状況(前ページの最後の拡大図)。 #11 #12

STF Cavity Group 16 #1#2#3#4#5 #6#7#8#9#10#11 #12 Status of UWR for MHI#16 ① 通信不良によるデータの跳びが最後になって急増した。 Steady state:

STF Cavity Group 17 一次洗浄中の空洞温度の状況(前ページの拡大図) #1#2#3#4#5 #6#7#8#9#10#11 #12 Status of UWR for MHI#16 ②

Status of UWR for MHI#16 ③ STF Cavity Group 18 ①は最初の注水完了時。 ②は流量を増やした状態での洗浄中。 ③は流量を戻した状態での洗浄中。 ① ② ③

STF Cavity Group Status of HPR for MHI#16 19 ノズルは 1st HPR では6往復、 2nd HPR では5往復させた。 2回目は TOC 、 Particle 共に、最良の状態に戻っている。