Dave Kieda* for the VERITAS Collaboration *University of Utah Department of Physics & Astronomy.

Slides:



Advertisements
Similar presentations
Exploiting VERITAS Timing Information J. Holder a for the VERITAS Collaboration b a) School of Physics and Astronomy, University of Leeds, UK b) For full.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
VERITAS status Stephan LeBohec and Brian Humensky for the VERITAS collaboration Adelaide, December 2006.
Photosensor Work at UCSC Concentrate on technologies that are: –Newer than conventional PMT –Now or soon in commercial production Multianode & high QE.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
High Dynamic Range Imaging: Spatially Varying Pixel Exposures Shree K. Nayar, Tomoo Mitsunaga CPSC 643 Presentation # 2 Brien Flewelling March 4 th, 2009.
MPI Seminar, October 7, 2008Thomas Schweizer, Development of a new low-threshold Trigger M. Shayduk, M. Rissi, T. Schweizer, N. Otte, M. Lopez for the.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Sept. 18, 2008SLUO 2008 Annual Meeting Detector R&D at KIPAC Hiro Tajima Kavli InStitute of Particle Astrophysics and Cosmology.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
Zurich PhD seminar, August Arno Gadola A new camera concept for Cherenkov telescopes.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
Measurement of the absolute efficiency,
May 4-5, 2006 T.Schweizer, CTA meeting Berlin Concept idea for a future telescope array observatory CTA meeting Berlin May 4-5, 2006 Thomas Schweizer.
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Andreas Horneffer for the LOPES Collaboration Detecting Radio Pulses from Air Showers with LOPES.
Improved PMTs for the Cherenkov Telescope Array project Razmik Mirzoyan for the Focal Plane Instrumentation WG Max-Planck-Institute for Physics Munich,
Recent TeV Observations of Blazars & Connections to GLAST Frank Krennrich Iowa State University VERITAS Collaboration GSFC, October 24, 2002 AGN.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
EAS Reconstruction with Cerenkov Photons Shower Simulation Reconstruction Algorithm Toy MC Study Two Detector Configuration Summary M.Z. Wang and C.C.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Argonne / U. Chicago Initiative on R & D for Next Generation Ground Based Gamma-ray Particle Astrophysics/Astronomy Karen Byrum Jun 7, 2010 Argonne National.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Jamie Holder University of Leeds August 2005 Status and Performance of the First VERITAS Telescope.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
May 4th 2006R.Mirzoyan: CTA meeting, Berlin The MAGIC Project: Performance of the 1st telescope Razmick Mirzoyan On behalf of the MAGIC Collaboration Max-Planck-Institute.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
Gus Sinnis Asilomar Meeting 11/16/2003 The Next Generation All-Sky VHE Gamma-Ray Telescope.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
1 Status of the CANGAROO-III Project Masaki Mori ICRR, University of Tokyo International Symposium on High Energy Gamma-Ray Astronomy, June 26-30, Heidelberg.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
HAWC Science  Survey of 2  sr (half the sky) up to 100 TeV energies Probe knee in cosmic ray spectrum Identify sources of Galactic cosmic rays  Extended.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Timing Studies of Hamamatsu MPPCs and MEPhI SiPM Samples Bob Wagner, Gary Drake, Patrick DeLurgio Argonne National Laboratory Qingguo Xie Department of.
Dave Kieda & Stephan LeBohec University of Utah Department of Physics and Astronomy John Davis University of Sydney, NSW Science Potential of High Altitude.
June 6, 2006 CALOR 2006 E. Hays University of Chicago / Argonne National Lab VERITAS Imaging Calorimetry at Very High Energies.
LIGO- G D Experimental Upper Limit from LIGO on the Gravitational Waves from GRB Stan Whitcomb For the LIGO Scientific Collaboration Informal.
Prospects to Use Silicon Photomultipliers for the Astroparticle Physics Experiments EUSO and MAGIC A. Nepomuk Otte Max-Planck-Institut für Physik München.
ARGONNE NATIONAL LAB G. Drake Electronics for Next-Generation Telescopes Oct. 21, 2005 p. 1.
UPGRADE PLANS FOR VERITAS Ben Zitzer* for the VERITAS Collaboration *Argonne National Laboratory.
Status of the MAGIC Telescope Project Presented by Razmick Mirzoyan On behalf of the MAGIC Collaboration Max-Planck-Institute for Physics (Werner-Heisenberg-Institute)
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
OSETI with MAGIC IntroductionIntroduction Radio SETIRadio SETI Optical SETIOptical SETI OSETI with MAGICOSETI with MAGIC SummarySummary July 2004.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
Array Trigger for CTA-US MSTs Feb CTA-US Meeting, SLAC Frank Krennrich John Anderson Karen Byrum Gary Drake Frank Krennrich Amanda Weinstein.
CI-110 Plant Canopy Analyzer Instrument Training Conducted by: Brienne Meyer
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
The VERITAS Trigger System A. Weinstein 1 for the VERITAS Collaboration 2 CFD x 499 (1 per pixel ) Pattern Trigger Shower Delay ( 1 PDM channel per trigger.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
Development of Multi-Pixel Photon Counters (1)
Counting Mode DAQ for Compton
Hellenic Open University
Hellenic Open University
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Department of Physics and Astronomy,
VERITAS: Very High Energy γ-ray Astronomy
VERITAS Upgrade Overview Jamie Holder (Delaware)
August 19th 2013 Alexandre Camsonne
Update on POLA-01 measurements in Catania
Presentation transcript:

Dave Kieda* for the VERITAS Collaboration *University of Utah Department of Physics & Astronomy

☞ Square Array of Four 12m Ø optical reflectors (Amado, AZ) ☞ Each Telescope: 499 Pixel PMT camera, 500 Mhz FADC readout ☞ Detects Very High Energy (VHE) gamma-rays ( eV) ☞ Fully operational since May 2007

132 known Sources (doubled since 2007) VERITAS has discovered a large fraction of the new VHE sources New Source discovery requires continually increasing VERITAS sensitivity => Reduction in threshold energy can allow access to new science

A.McCann, 2012 ICRC Sensitivity < 100 GeV can help connection to FERMI pulsars… 120 GeV Gap

✪ ✪ ✪ ✪ ✩ Rearrange Telescopes to Better Geometry (SAO, U. Utah + collaboration) ✩ Higher sensitivity Photomultiplier Tubes (Purdue, U Delaware, U. Utah, Wash U, UCSC) ✩ Faster Pattern (Level 2) Trigger (Iowa State U, Argonne NL) ✩ Communication (Fiber Optic) Network Upgrade (SAO, U. Utah) 2.1 M$ MRI-R2 funded project (National Science Foundation, University of Utah) Main cost is the new photomultiplier tubes (1.2 M$)

Current: Photonis PMT XP2970 ~18-22% peak QE New: Hamamatsu PMT R10560 ~34-40% peak QE $495 each (x 2200) = $1M

Nepomuk Otte 2012 ICRC Talk XP2970 Photonis

VERITAS Upgrade results in increases in effective detection area. Largest gains are at the lowest energies (E< 100 GeV) Conservative estimate

Use E -2.5 source spectrum Peak energy: 95 GeV before upgrade 70 GeV after upgrade Conservative estimate

L2 Hardware Overview and Timetable J. T. Anderson – VERITAS Collaboration Meeting – January 22 nd, L2 Pattern Design Concept Camera trigger processing is done in custom 9U VME Crate –Camera pixels (discriminated bits) received by I/O cards –Pixels of camera face mapped into regions using custom backplane –Pixels at boundaries between regions duplicated to insure no gaps in logic Divide 499 channel camera into 3 regions –~166 pixels per region + ~15 overlap pixels/region Each region processed independently by its own “L1.5” region processor –Potential gamma events identified by 3-fold coincidence of neighboring pixels sampled at 400MHz –All such coincidences occurring are reported to telescope- wide L2 processor (timestamp + list of hits) L2 processor combines data from L1.5 processors –All L1.5 data sets within selected time window are merged together –Any coincidence generates trigger to L3 –Capable of performing calculations required to feed a topological trigger algorithm –System controller 3-Fold Coincidence; center plus any two of surrounding 6 PMT Afterpulsing: Need 4-fold Coincidence

L2 Hardware Overview and Timetable J. T. Anderson – VERITAS Collaboration Meeting – January 22 nd, 2010 Trigger performance – Test Stand Timing Alignment 12 This shows the timing variation in the test stand system before timing is aligned (log scale, +/-5ns). Color indicates relative delay. Green is “median”. Blue is “early”. Red is “late”. Note: each pixel has multiple measurements taking into account every coincidence equation in the logic. All raw data is saved. Color displays are average of all measurements for that pixel.

L2 Hardware Overview and Timetable J. T. Anderson – VERITAS Collaboration Meeting – January 22 nd, 2010 Trigger performance – Test Stand Timing Alignment 13 This shows the timing variation in the test stand after timing is aligned (log scale). Color indicates relative delay. Green is “median”. Blue is “early”. Red is “late”. The two gray pixels were manually disabled (cable issue).

Factor of ~2 reduction in time to see 10 mCrab source since 2007 (48 hr -> 26 hr) New Hi-QE PMT (>34%), faster pattern trigger system: 2012 (26 hr -> < 20 hr for a 10 mCrab source) Increased Sensitivity, especially < 100 GeV: Bridge E gap to FERMI Pixel design/testing complete, fabrication underway Pattern Trigger testing nearing completion: all tests passed Upgrade Project is on time, under budget September/October 2011: Pattern Trigger Installation Summer 2012: High-QE PMT Installation (all 4 telescopes) September 2012: VERITAS – II begins operations

Total Upgrade Cost $2.1 M (Funded by NSF MRI-R2 grant) Major cost item is Photomultipliers ($1.1 M)