SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
Advertisements

Chapter-2 Parts of Steel Bridge.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Heavy Concrete Construction Formwork
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
Composite Construction
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
SCAFFOLD SAFETY.
ENG-1010 Lecture 16 Bridge Design.
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Concrete Pre Cast Panel By Peter Spence ID:
Chapter 34 Bridge Construction.
2E8 Materials (Civil Engineering Component) Civil Engineering Materials Department of Civil, Structural and Environmental Engineering Trinity College Dublin.
Bridges unit 101.
OSHA Subpart Q Concrete and Masonry Construction.
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
CASE STUDY of Cantilever Method of Erection RUB spanning mtr. NH-5 (Chennai-Kolkata) PREPARED BY: Srinibas Sahoo, AXEN/C/E.Co.Rly/Cuttack P. Choudhary,
UNIT-I STANDARD SPECIFICATION FOR ROAD BRIDGE
CE7005 Prestressed Concrete
PRE-FABRICATED STRUCTURES
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Appendices Subpart R Steel Erection
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Spliced Girders A Producer’s Perspective
STRESS RIBBON BRIDGES PREPARED BY:SHAIKH MOHAMMADSOYAB A
Critical Thinking in Engineering Process
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
Other Construction Projects
BEAMS AND COLUMNS.
Bridge Engineering (5) Substructure – Abutments and Piers
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
BRIDGES.
PROJECT REPORT DESIGN CONCEPTS OF BOW STRING GIRDER (40 M SPAN) OF ROAD OVERBRIDGE AND DESIGN OF SUB STRUCTURE FOR THE SAME.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Prestressed Concrete I.  *Unfavorable effects induced from the presence of cracking in reinforced concrete: To expose the reinforcement to corrosion;
Topic : Theodolite Traversing
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
Modification & Fixing of INSERT IN CONCRETE SLEEPER for better Track parameters Session No Integrated Course Project presented by Project presented.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Construction Methodology for Suramadu Main Bridge.
Types of Bridges Source:
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Oregon DOT Integral Abutment Design Criteria
Temporary Works – P8 Project Practice.
Visit for more Learning Resources
Chapter 5: Substructure
SHERINE RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Chapter-2 Parts of Steel Bridges.
FOR 5TH SEMESTER DIPLOMA IN CIVIL ENGINEERING
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
RCC UNIT-12 Prestressed Concrete
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Suryoday Technologies ISO 9001:2015 Co.
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Engineering Technology Program
Presentation transcript:

WELCOME ALL FACULTY MEMBERS & ALL PARTICIPANTS OF INTEGRATED COURSE-10109

ACKNOWLEDGEMENT WE LIKE TO PAY OUR GRATITUDE TO SH. A. K. GOEL DIRECTOR IRICEN WHO IS LEADING &GIVING PERFECT INVIRONMENT FOR OVERALL DEVELOPEMENT AND LEARNING AT IRICEN. WE EXPRESS OUR SINCERE THANKS TO SH. V. B. SOOD PROF/BR FOR HIS VALUABLE GUIDANCE IN PREPARING THIS PROJECT. WE ALSO EXTEND OUR SPECIAL THANKS TO SH. NEERAJ KHARE COURSE DIRECTOR FOR HIS VALUABLE GUIDANCE AND PERSONEL ATTENTION IN EACH AND EVERY ASPECT THROUGHOUT THE COURSE. WE EXPRESS OUR SINCERE THANKS TO ALL THE FACULTY OF IRICEN FOR THEIR VALUABLE LECTURES WHICH HAVE HELPED US IN UPGRADING OUR KNOWLEDGE IN ALL THE AREAS.

BALANCED CANTILEVER CONSTRUCTION OF PSC BRIDGE CAST-IN- SITU CONTINUOUS UNIT

INTEGRATED COURSE 10109 PRESENTED BY : SHIV KUMAR AXEN/CONST./REWARI/NR A.D.AGNIHOTRI AXEN/CONST./GONDA/NER A.K.BARSAIYAN ADEN/BR/BHOPAL/WCR GUIDED BY: SH. V.B.SOOD PROFESSOR BRIDGE

INTRODUCTION BALANCED CANTILEVER CONSTRUCTION IMPLIES CONSTRUCTION OF CANTILEVER SEGMENTS FROM A PIER IN A BALANCED FASHION ON EACH SIDE UNTIL THE MID SPAN IS REACHED AND A CLOSURE KNOWN AS STITCH SEGMENT IS MADE WITH OTHER HALF SPAN CANTILEVER CONSTRUCTED FROM THE PRECEDING PIER. THE PROCESS THE FORM WORK IS SUSPENDED FROM THE END OF THE LAST SEGMENT. THE NEW SEGMENT IS CAST AND ONCE THE CONCRETE HAS DEVELOPED A PREDETERMINED STRENGTH, THE SECTION IS POST TENSIONED TO THE REST OF THE BRIDGE. THE SAME ERECTION PROCESS IS REPEATED TILL THE STRUCTURE IS COMPLETED.

CONSTRUCTION SEQUENCE Stitch Segment 3 Mtr Long Segment End Span Pier Head Pier Head Pier 1 P2 P3 P4

FUNDAMENTALS OF DESIGN Building a bridge deck by succession of segments where each segment carries the weight of the next segment Each segment is integrated with the previous one as soon as it is strong enough. Each segment becomes self supporting and also becomes a base for a new segment.

The stability of cantilever is secured at each step by pre-stressing cables provided in the upper fiber - In order to avoid asymmetric overturning moments, the construction is done symmetrically on the pier on both the sides.

NECESSITY OF CAST-IN-SITU CONSTRUCTION WHEN ACCESS BELOW THE BRIDGE IS EXPENSIVE OR PRACTICALLY IMPOSSIBLE DUE TO BUSY ROAD, RIVER, CANAL, DEEP VALLEY OR RAILWAY TRACK ETC. LONGER SPAN (WHERE LAUNCHING IS VERY COSTLY).

Construction over busy road

SEGMENTAL CONSTRUCTION OVER RAILWAY TRACK

DMRC Cast in place balanced cantilever

SEGMENTAL CONSTRUCTION IN PROGRESS OVER A RIVER/ SEA

CONSTRUCTION MACHINERY 1. BATCHING PLANT. 2. TRANSIT MIXERS. 3. CONCRETE PUMP. 4. WELDING GENERATOR. 5. CONCRETE VIBRATORS. 6. CONCRETE NEEDLES.(6O&25MM DIA). 7. COMPRESSOR. 8. TYRE MOUNTED CRANE. 9. HAND WINCH. 10. CHAIN PULLEY BLOCK. 11. PIPE WRENCH. 12. CLC GANTRIES (80T)-4NOS. 13. GROUT PUMP.

Concrete Pump

Bridge builder

CRITICAL CONSTRUCTION MATERIALS 1. POT-PTFE BEARINGS 2. ANCHORAGES-19K15,AND GRIPS. 3. BEARING PLATES. 4. HT STRANDS (IS-14268 CLASS-2) 5. GI SHEATHING PIPES-ID 110MM. 6. CEMENT OPC 53 GRADE 7. REINFORCEMENT STEEL IS-1786 8. ADMIXTURE IS-9103

OPERATION SEQUENCES 1. SURVEY WORK: CENTER LINE MARKING FOR FOUNDATION OF TRESTLES WILL BE DONE WITH THE HELP OF THEODOLITE/ TOTAL STATION. 2.CONSTRUCTION OF PIER HEAD: (a). TRESTLE FABRICATION AND ERECTION FOR CONSTRUCTION OF PIER HEAD. (b). DESIGN AND FIXING OF BEARINGS.

OPERATION SEQUENCE

Cont. OPERATION SEQUENCES (c). SUPER STRUCTURE STABILIZING ARRANGEMENTS: THE ADDITIONAL TRESTLE AND SAND JACKS OF 350 TONNE CAPACITY ARE PLACED AT REQUIRED LOCATIONS. (d). CALCULATION OF CO-ORDINATES FOR HORIZONTAL CURVE AND DECK LEVEL FOR VERTICAL CURVE. (e). SOFFIT, WEB EXTERNAL AND DECK SHUTTERING. (f). SOFFIT, WEB AND DECK REINFORCEMENT.

OPERATION SEQUENCES CONTD. (g). CABLE PROFILING. (h) EMBEDDED FIXTURES. (i). END STOPPER SHUTTERING. (j). CONCRETING WITH CONCRETE PUMP. (k). CURING IS DONE FOR 14 DAYS. (l). HYDRO TESTING OF SHEATHING PIPE AT 0.3 MPa PRESSURE. (m). PRESTRESSING AND GROUTING: STRESSING STARTS ONLY IF CONCRETE ATTAINS THE DESIRED COMPRESSIVE STRENGTH.

OPERATION SEQUENCES CONTD. 3.CONSTRUCTION OF CANTILEVER: (a). FABRICATION AND ERECTION OF CLC GANTRIES (BRIDGE BUILDERS)(2+2=4SETS). (b). PRE-CAMBER CALCULATION. (c). GANTRY ALIGNMENT AND LEVEL. (d). SOFFIT SHUTTERING. (e). EXTERNAL SHUTTERING. (f). REINFORCEMENT, SHEATHING PIPE AND CABLE PROFILING.

OPERATION SEQUENCES CONTD. (g). INTERNAL SHUTTERING OF CLC GANTRY IS MOVED ON MONO RAILS AND FIXED TO THE LOCATION AS PER DRG. (h). END STOPPER SHUTTERING. (i). APPLYING ADHESIVE (NITO BOND ETC.) ON FACE OF OLD CONCRETE. (j). CONCRETING OF 3M LONG SEGMENTS ON EITHER SIDE OF PIER HEAD SIMULTANEOUSLY OR ONE BY ONE USING CONCRETE PUMP. (k). CURING.

OPERATION SEQUENCES CONTD. (l). PRE STRESSING AND GROUTING. (m). RELEASING OF CLC GANTRY FORM WORK. (n). MOVEMENT OF CLC GANTRY (BRIDGE BUILDER.) FOR SHIFTING TO NEXT UNIT. (o). LEVELLING AND ALIGNMENT OF CLC GANTRIES. (p). SIMILAR PROCEDURE TO BE ADOPTED FOR OTHER SEGMENTS.

Cast in place balanced cantilever

OPERATION SEQUENCES CONTD. 4.CONSTRUCTION OF END SPAN. CASTING OF END SPAN IS DONE AFTER THE CANTILEVER CONSTRUCTION. ACTIVITIES INVOLVED REMAINS THE SAME AS EXPLAINED FOR PIER HEAD CONSTRUCTION. 5.CASTING OF STITCH SEGMENT AFTER CASTING OF CLC SPAN, THE REMAINING PORTION OF LENGTH 2.50M SEGMENT IS TO BE STITCHED.

SAFETY PRECAUTIONS 1. LOAD TEST OF CRANE SHOULD BE DONE BY THIRD PARTY. 2. WORKING PLATFORM AND SAFETY NETS WILL BE PROVIDED. 3. SAFE ACCESS BY MEANS OF LADDER WILL BE PROVIDED FROM GROUND TO DECK TOP. 4. THE MACALLOY BAR IS DESIGNED FOR FOS =3. 5. ALL ELECTRICAL CONNECTIONS SHOULD BE PROPER. 6. TEMPORARY HAND RAIL WILL BE FITTED FOR DECK SLAB CASTING. 7. FALL ARRESTER SHOULD BE PROVIDED. 8. HEIGHT GAUGES AND CAUTION BOARDS SHOULD BE FIXED FOR ROAD USERS. 9. PROPER PERSONAL EQUIPMENTS (PPE) LIKE SAFETY HELMETS, SAFETY SHOES, SAFETY BELTS AND SAFETY NETS SHALL BE USED.

HEIGHT GAUGE FOR ROAD USERS

SAFETY NET

DOCUMENTATION AND RECORDS 1. POUR CARD. 2. BAR BENDING SCHEDULE. 3. REINFORCEMENT INSPECTION CHECK LIST. 4. INSPECTION CHECK LIST BEFORE APPROVAL OF CONCRETE. 5. CHECK LIST FOR SHEATHING, ANCHORAGES, AND EMBEDDED FIXTURES. 6. STRESSING CHART AND PRE STRESSING REPORT. 7. GROUTING REPORT. 8. SAFETY CHECK LIST FOR CLC WORK.

ADVANTAGES 1.THIS METHOD HAS GREAT ADVANTAGES OVER THE OTHER FORMS OF CONSTRUCTION IN URBAN AREA WHERE TEMPORARY SHORING WOULD DISRUPT TRAFFIC SERVICES BELOW. 2.SUITABLE OVER WATERWAYS WHERE FALSE WORK WOULD NOT ONLY BE EXPENSIVE BUT ALSO A HAZARD. 3.USEFULL WHERE SPAN LENGTH IS MORE BUT LAUNCHING OF GIRDER IS NOT POSSIBLE.

BRIDGE OVER WIDE RIVER

ADVANTAGES CONTD. 4. ONLY A SMALL PORTION OF THE SUPER STRUCTURE ADJACENT TO THE PIER /ABUTMENT WILL REQUIRE USE OF FALSE WORK. 5. PROCESS IS SAFE AND ECONOMICAL. 6. ADOPTABILITY TO CURVATURE AND SUPER ELEVATION. 7. USEFUL FOR ODD SIZES, SINGLE SPAN ETC AS FALSE WORK IS LESS.

LONGER SPAN OVER RLY TRACKS

DISADVANTAGES 1. CAST-IN-SITU SEGMENTAL CONSTRUCTION IS A RELATIVELY SLOW CONSTRUCTION METHOD IN COMPARISON TO PRE CAST SEGMENTAL CONSTRUCTION. 2. THE WORK IS PERFORMED IN SITU i.e EXPOSED TO WEATHER CONDITIONS. 3. THE TIME DEPENDENT DEFORMATION OF CONCRETE BECOME VERY IMPORTANT AS A RESULT OF EARLY LOADING OF THE YOUNG CONCRETE. 4. HIGH PRECISION IS REQUIRED.