Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

Fire Apparatus Pump Theory
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Modern pipe network models
DRIP DISPERSAL SYSTEMS Problems and Solutions. Flow Equalization Surges in the ATU during peak loading are a major cause of filter clogging in a drip.
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
CE 3372 Water Systems Design
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
Presentation on City of Westminster Water System Pressures May 1, 2013.
Thailand Water Supply System Project By: Stephen Bonk (Team Leader) Kevin Dischino Joseph Moore.
C L A S #4 Driver Operator Refresher Training.
Basic Hydraulics Irrigation.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
CHW Optimization Case Studies
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
Hydronic Mechanical Controls
Chapter 4 (continues) Pipe Network.
EPANET FOR PRESSURIZED PIPE SYSTEMS
2010 Pipe Dreams Team: Ibrahim Ibrahim, Mike Johnson, Scott McCombie, Bronze Richards & Josh Schroeder.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Hydraulic Modeling of Water Distribution Systems
Water Supply.
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Civil engineering branches & scopes
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Water piping design.
DESIGN AND CONSTRUCTION OF AN INDUCTION FURNACE (COOLING SYSTEM) Presented by MG THANT ZIN WIN Roll No: Ph.D-M-7 Supervisors : Dr Mi Sanda Mon Daw Khin.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Lecture Objectives: Finish with thermal storage systems Learn about plumbing systems.
Backbone Engineering Clark Larsen, Kendrick Shepherd, and Brett Thomas.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
Prepared By Abeer Mohammed Ala' Snober Suhad Dwaikat Wajeha Ma'ani Submitted to Dr. Amal Al-hudhud.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
AN – Najah National University
Josiah Dobson Brett Nicholson Travis Befus Team 11.
CE 3372 Water Systems Design
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
CENTRIFUGAL PUMPS:- DESIGN & PERFORMANCE Ir. N. Jayaseelan 2012.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Irrigation Systems and Components. Overview Types Layout Components Hydraulics Design Considerations.
Upon completion of this module, you will be able to:
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
CE 3372 Water Systems Design
WATER DEMAND (Chapter 24)
HOS1010C - Introduction to Horticulture
Kick-Off Webinar 2016 – 2017.
An-Najah National University Faculty Of Engineering
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
High-Capacity Solar Pumping in Refugee Camps
4th Annual Construction Law Summit
City of Roundup, Montana
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Analysis of the Water Distribution Network of
Presentation transcript:

Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact of system improvements on system pressure To complete the projects, the team had 7 working days and worked 8-12 hours each day. The team worked simultaneously on several projects; some were standalone, while others affected the overall project critical path. As tasks were completed, labor was often shifted to ensure completion of the highest priority projects, listed below: Lot 1 Connection Police Tank Repair High Pressure Zone No. 1 Tank Garbage Shed Overview Water Distribution System Water Storage Tank Design Schedule Pitt Humanities, Engineering and Design Club (Spring 2014) Engineering in Panama: Kuna Nega Water Infrastructure Improvements Garbage Shed Foundation Design School tank piping diagram Rationale Kuna Nega school previously stored refuse in hallways To improve cleanliness and reduce odor, an offsite storage area was required. Design Objectives Produce initial contour map of the hillside. Displace 100 cubic feet of soil to level the work site. Improve Slope Stability factor of safety from 1.19 to Analyze design of foundation Results This will give the school 700 cubic feet of garbage storage. This will reduce the amount of litter in the village and improve the quality of living. Foundation design is adequate Lot 41 Water Storage Tank Lot 41 Tank Design Specifications: Square tank with 12’x12’ inner dimensions Actual storage capacity of 11,500 gallons Composite tank with concrete masonry walls No. 1 Tank Design Revisions Review initial designs Compare designs to existing structure in Panama Monitor construction of structural components while on site to ensure proper installation No. 1 tank, section A-A Construction of tank No. 1, taken CMU block construction is preferred by the local labor A square tank is more constructible than a circular tank when using CMU block Pre-implementation when Panama main line is shut off Post-implementation when Panama main line is shut off PumpLiberty FL150 Flow rate (gpm)41 Operating Head (ft)82 Total head loss (ft)8 Shut off head (ft)110 System and pump curves with operating characteristics Project Manager: Blaise BuchaConstruction Managers: Neal Daley, Jesse Newman-Evans, Mike Poole Water Resources Team: Julie Shearer, Matthew Weschler Structural Team: Caleb Angle, Mike Barnes, Phil Karanovich Geotechnical Team: Nikil Grama, Chris Mautino, Kathleen Staub Supply Yard School Tank No. 1 Tank Police Tank Lot 1 Lot 41 Garbage Shed Stream High Pressure Zone Panama City Water Main Project summary: Creation of a high pressure zone and design of a future 10,000 gallon tank at the highest point in the community to supply water to the area not serviced by the existing tank Continued construction of a 25,000 gallon storage tank to supplement the existing tank Installation and replacement of valves to improve system efficiency and simplify maintenance Construction of a garbage shed foundation for the Kuna Nega school Project Background: The Panama City water main that supplies Kuna Nega is periodically shut off for up to 36 hours. The existing 10,000 gallon storage tank can only provide backup supply for 10 hours. Part of the community that lies at a higher elevation than the existing tank receives no pressure when the Panama City water main is shut off. Location of projects in Kuna Nega Results High Pressure Zone pressurized during periods when the Panama City water main is shut off Entire community pressurized according to EPANET model Lot 41 Tank design to be implemented next semester Design Implementation Installed submersible pump in the school tank to pressurize High Pressure Zone Connected Panama City water main to Lot 1 Connected police station storage tank to distribution system Installed: 700 feet of PVC pipe, 8 ball valves, 4 check valves and 4 air release valves Unexpected valve challenge Lot 41 tank elevation view Lot 41 wall detail Gantt chart of work completed to D rendering of garbage shed footer Section view of forces on retaining wall and slab