NOVEMBER 18, 2014 / MILFORD, MA Mark Babula PRINCIPAL ENGINEER – SYSTEM PLANNING Project Update Eastern Interconnection Planning Collaborative’s (EIPC)

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Midwest ISO Market Readiness Update October 27, 2004.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9,
1. RCC Action Plan Item: Financial Protection for Produce Sellers Webinar presentation December 2013 Agriculture and Agri-Food Canada (AAFC)
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
West Contra Costa USD Update on Bonding Capacity Waiver Presentation to the Board of Education May 28, 2014.
November 7,  Provisos are in annual Appropriations Bills  Proviso 1A.60 included in bill  Very prescriptive.
Community Development & Planning Grant Pre-Application Meeting April 17,
Eastern Interconnection Planning Collaborative David Whiteley Whiteley BPS Planning Ventures LLC EIPC Stakeholder Seminars October 13 & 16,
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Eastern Interconnection States’ Planning Council – Current Issues Brian Rybarik Public Service Commission of Wisconsin (Executive Assistant to Commissioner.
1 North American Energy Standards Board EPSA Regulatory Affairs Conference NAESB Activities in the Wholesale Electric Market Washington, DC October 25,
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
Month/Date Budget Calendar Activity Responsibility Beginning January 2010 Prepare Budget Calendar and Budget Plan for review. CFO, Superintendent.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 Energy Delivery Eastern Interconnection Planning Collaborative Joseph Payne Entergy Services, Inc. New Orleans, LA August 11, 2010.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
Middle Fork Project Relicensing Process Plan April 25, 2006.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Report January 18, 2016 doc.: /0132r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 18 January 2016 Authors:
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
Sector Caucus Nomination and SSC Selection Process.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Page 1 3rd SAICM EU-JUSSCANZ Regional Meeting Paris, France February 12, 2008 Developing Reporting Modalities for SAICM Implementation.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Preparation of the Self-Study and Documentation
LNBA Subgroup: Avoided Transmission Value
Boston University School of Law Transactional LawMeetSM -Informational Meeting - September 11, 2012.
Reliability Standards Development Plan
NPA 450/579 (Area Code) Relief in Quebec
NERC Reliability Standards Development Plan
NPA 403/587/780/825 (Area Code) Relief in Alberta
NERC Reliability Standards Development Plan
Annual Attachment O Stakeholder Meeting
Annual Attachment O Stakeholder Meeting
2015 January February March April May June July August September
Presentation transcript:

NOVEMBER 18, 2014 / MILFORD, MA Mark Babula PRINCIPAL ENGINEER – SYSTEM PLANNING Project Update Eastern Interconnection Planning Collaborative’s (EIPC) Gas -Electric System Interface Study

Table of Contents Legend History Participating Planning Authorities (PPAs) / Study Region PPA Stakeholders / Stakeholder Steering Committee (SSC) The Four Study Targets Project Administration Timeline * Project Update * * All dates are identified as either actual or preliminary 2

Legend Information (text) in dark color was previously delivered to the PAC at these meetings: – 2013 June 19, August 13, September 17, October 16, November 20, December 18 – 2014 January 22, February 19, March 17, April 29, May 21, June 19, July 15, August 14, September 17, and October 23 Information (text) in red color is an update to the previously published information/dates – Prior updates can be found on the PAC Materials web site; by meeting date – This Project Update starts at Page 10 3

History The New York ISO originally developed a Statement of Work (SOW) to study the natural gas–electric interface and infrastructure within New York State; ISO-NE, PJM, MISO, TVA, and Ontario were also interested in performing similar studies At the same time, the U.S. DOE recognized a gap in its review of the EIPC Reports on Phase 1 and 2 of the DOE funded eastern interconnection transmission analysis work, which prompted them to extend the interconnection studies grant to include further analysis of the interaction of the natural gas and electric industries Many of the alternative futures studied within Phase 1 and 2 of the EIPC analysis involved retiring coal-fired power plants and replacing them with natural gas-fired generation During the period of the EIPC study, noteworthy changes have occurred regarding the natural gas markets that would result in an increased dependence on new gas-fired resources – Recent shale gas development and changes in location of new gas supplies also factor in 4

PPAs / Study Region The six Participating Planning Authorities (PPAs) are a subset of EIPC members that include: 1ISO New England (ISO-NE) 2New York ISO (NYISO) 3PJM Interconnection (PJM) 4Midcontinent ISO (MISO) (including the MISO South/Entergy system) 5Tennessee Valley Authority (TVA) Areas 6Ontario’s Independent Electricity System Operator (IESO) The Study Region encompasses the major natural gas supply, pipelines, storage and distribution systems and regional electric systems serving the PPAs. In metropolitan areas, the inclusion of local gas distribution companies (LDCs) is an important consideration because such a large number of generating plants are served directly off the LDC systems in those areas 5

PPA Stakeholders / Stakeholder Steering Committee (SSC) The PPA Stakeholder Groups are the assembly of stakeholders created by each PPA to provide input to the PPA on its activities and to fulfill any requirements it may have under FERC Order No Since this Gas- Electric System Interface Study will be performed in a transparent and collaborative manner, the study processes will be open to participation by state and federal officials, representatives from ISOs, RTOs, electric utilities, transmission and generation owners, end-users and relevant stakeholder bodies or non-government organizations (NGO’s), including appropriate entities in Canada. Representatives from the North American natural gas industry are also included To meet these aforementioned requirements, the EIPC previously established the Stakeholder Steering Committee (SSC), a multi- constituency steering committee, to provide strategic guidance on the scenarios and sensitivities to be modeled, suggest modeling tools, suggest key assumptions for the scenarios and sensitivities, and other activities. The EIPC and SSC Charter and its membership and activities are posted on the EIPC web site which is located at: 6

Study Targets The four Targets of the Statement of Work (SOW) are: Target 1 - Develop a baseline of the electric and natural gas systems, including their planning, operation and interactions Target 2 - Determine the adequacy of the regional gas systems to satisfy generation needs over five- and 10-year horizon Target 3 - Identify contingencies on the gas and electric systems that could negatively affect the other Target 4 - Examine the pros and cons of dual fuel capability for generation versus expanding gas system infrastructure 7

Project Administration Timeline (All dates are actual) 1The EIPC advised the SSC of the continuation of the Phase II work with the Gas-Electric System Interface Study on June 7, The PPA Stakeholder Groups were introduced to the SSC and its process for interaction with the PPA Stakeholder Groups via two Webinars held on June 20 and 26, 2013 o Reconvene the SSC and review its membership o Update the final SSC Roster by September 30, The EIPC invites comments from the SSC and PPA Stakeholder Groups on the draft SOW – comments were due by July 12, The SSC structure was adjusted to include natural gas industry representation on July 27, The PPAs compiled stakeholder feedback on the proposed SOW thru August 2,

Project Administration Timeline – cont’d (All dates are actual) 6 Prior to issuance of the Request for Proposals (RFP), the PPAs review, post and incorporate appropriate Stakeholder comments into a revised SOW thru August 2, The PPAs finalized the Project Management Plan (PMP) and SOW by August 2, The RFP process was initiated with the publishing of the final Statement of Work, along with the formal announcement of the RFP on the EIPC website, an EIPC Media Release, and advertisements in both Platts MW Daily and Gas Daily publications on August 3, Responses to the RFP were required to be completed by midnight on August 30, The contract was awarded to Levitan & Associates, Inc. (LAI) of Boston, MA 9

Project Update – November 18, Target 1 -Complete - The final Draft Report and exhibits have been posted to the EIPC website, along with the matrix of comments from stakeholders. 161 Target 2 – AURORA Production Simulation Update -All Aurora production simulations to support the project have been performed. 162 Target 2 – Gas Pipeline Competition Model (GPCM) Update -GPCM analysis has been completed for all three scenarios and all sensitivities. 163 Target 2 – Draft Report -The Draft Target 2 Report for Stakeholder review was targeted for publication on September 30, Its posting has been delayed for addition review. 10

Project Update – November 18, 2014 – cont’d 164 Target 3 -FERC Staff has delivered all of the 62 requested Exhibit G pipeline data forms. -This delay has introduced a 4-6 week delay in the Target 3 milestones - PPAs & LAI are re-assessing the project schedule. -PJM, NYISO and IESO continue to work with local gas LDCs for contingency identification and modeling. -All PPAs have submitted their lists of electrical contingencies to be modeled. 165 Target 4 -A total of 27 locations have been chosen by the PPAs for the T4/t5 analysis – the incremental firm gas versus dual fuel “benefits” assessments. -The Target 4 Draft Report for Stakeholder review was posted November 7, Stakeholder Webinar on the Target 4 Draft Report was November 14, Project Timeline - The remaining project timeline is currently under review. 11