Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

Washington Department
LOWER SALMON RIVER Tributary Protection and Enhancement.
Presentation for the Policy Advisory Committee California Transportation Plan 2040 April 15, 2014 Agricultural Land Stewardship Planning.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Presented by: Terri Gaines DWR FESSRO February 28, 2014 Regional Permitting for the CVFPP.
Sierra Water Work Group Summit June Upper Mokelumne River Watershed Authority.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Upper San Joaquin River Regional Flood Management Plan Regional Flood Protection Now and in the Future Workshop 7: Financial Planning Wednesday April 16.
Webinar: Central Valley Flood System Conservation Framework and Strategy Draft Proposal Solicitation Package (PSP) FloodSAFE Environmental Stewardship.
1 Rebuilding the System Reducing the Risk California Water Plan – Advisory Committee August 16, 2007.
Anadromous Fish Run Site Selection Tool An Example Application: Identifying Restoration Projects for Community-Based Efforts.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
1 Regional Report San Joaquin River Hydrologic Region.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Method to Develop Flow Criteria for Priority Tributaries to the Bay-Delta Workshop Erin Ragazzi March 19, 2014.
California’s Flood Future Recommendations for Managing the State’s Flood Risk National Association of Flood & Stormwater Management Agencies December 10,
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
1 California Water Plan Update 2009 Where We’ve Been Where We Are Going South Lahontan Regional Workshop Palmdale July 10, 2007.
May 7, …for healthy Water Quality, Quantity, and Aquatic Habitat Presenter: Dianne Denson Alaska Dept. of Environmental Conservation ACWA Alaska’s.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
CLIMATE CHANGE AT THE DEPARTMENT OF WATER RESOURCES Climate Change Adaptation Across the Landscape Michelle Selmon Regional Climate Change Specialist June.
Department of Water Resources California Levee Database (CLD) An ongoing Initiative to Collect and Catalog Data for California’s Levees and Flood Control.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Adapting Water Policy to Meet Future Need North Bay Watershed Association April 4, 2008 Lester Snow Director.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
1 California Water Plan Update 2009 Advisory Committee June 4, 2007.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.
A Vision for the Future Presented to the North Bay Watershed Association by the Sonoma County Water Agency and Zone 7 Water Agency.
The Great California Delta Trail Planning Process for Contra Costa and Solano Counties Technical Advisory Committee Meeting January 2010.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Central Valley Flood Protection Board Update Presented by: Michael Mierzwa, P.E. Lead Flood Management Planner California.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Terri Wegener, P.E., DWR Briefing for Central Valley Flood Protection Board.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
BUILDING STRONG ® 1 ActivityStart Date Finish Tech editing (HDR)15-Oct-1520-Oct-15 PDT Consistency Review20-Oct-1523-Oct-15 Sponsor Review26-Oct-1530-Oct-15.
Sierra Water Workgroup Summit Daniel Schultz State Water Resources Control Board Division of Water Rights June 12, 2014.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Central Valley Flood Protection Board October 25, 2013 Presented by: Michael Mierzwa, P.E. Chief of the FloodSAFE Program Management Office California.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
California Water Plan Old and New Steve Macaulay, Executive Director.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
1 Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Yolo Bypass Fisheries Enhancement.
Draft Central Valley Flood Protection Plan Investment Strategy
Thorp Mill Ditch Assessment ( )
Agriculture and Land Stewardship Planning
Presentation transcript:

Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental Scientist California Department of Water Resources FloodSAFE Environmental Stewardship and Statewide Resources Office (FESSRO) Fish Passage Improvement Program Presentation prepared for: YBFET November 19,

Background 2 Our Fish Migration Improvement Opportunities (FMIO) work is for the 2017 Central Valley Flood Protection Plan (CVFPP) update. FMIO work is a subset of the Conservation Strategy which is the environmental complement to the CVFPP. The Conservation Strategy also addresses floodplain inundation, riparian habitat, and native species recovery. The FMIO work is focused on fish migration and fish passage only.

Problem Statement Several instream water management structures adversely affect fish migration within the Flood Management System.

Systemwide Planning Area Map 4

Conservation Strategy Planning Area Map 5

Fish Migration Improvement Opportunities (FMIO) Objectives Provide planning information at the reconnaissance (context), project-identification (selection), and project- implementation (design) levels Integrate fish migration as an ecosystem enhancement component in flood planning efforts Support three CVFPP planning efforts: CS, RFMP, BWFS by providing best available technical information to improve informed decision-making. 6

FMIO Products Fish Migration Improvement Opportunities - Comprehensive report (~90 pages) - Provides key info: - species presence, fish biology and behavior, mechanism of structure impact on migration, FMI solutions and benefits - Identifies opportunities in the Upper Sacramento, Feather River, and Lower Sacramento - Prioritizes based on anticipated fishery benefit 7

FMIO Products (cont) FMIO Snapshot - Short technical memo of tables and maps - Identifies structures, priority, SPFC linkage, migration problem statement, additional needs/status update GIS dataset - Structure points with associated tabular data - Polygons of potential stranding areas in SPFC flood bypasses 8

Structures State Plan of Flood Control (SPFC) State and federal flood control works of the Sacramento River and San Joaquin River watersheds as identified in Section 9110 (f) of the California Water Code (CWC). Non-SPFC Structures not part of the SPFC. Non-SPFC structures may have a flood control component and be used in conjunction with the SPFC to provide flood management. 9

Information Collection Objective: Identify structures and impact mechanism on migration Literature Review Reports, biological opinions, internal memos, journal articles, flood documents, bulletins, etc. CalFish Passage Assessment Database (PAD) Some information was available from this database for most of identified structures. Direct Communication  People who are familiar with sites and issues (e.g. gauge calibrators who visit some structures frequently during flood events).  CDFW personnel who conducted fish rescues  All state and federal agencies with Northern Regional Offices  UC Davis researchers  Multiple DWR divisions including DWR Sutter Maintenance Yard staff Site Visits  Collected primary data and took photos  Visited when migratory impacts were believed to occur (e.g., low flows, flood flows) 10

FMIO Prioritization Method Objective : Assist planners in prioritizing FMI opportunities within each waterway First Screening: Fishery Impact/Benefit (Priority) Score and rank by: (1)frequency structure acts as a barrier; (2)intensity of obstruction based on location in the waterway, species diversity/presence; (3)upstream habitat the structure limits access to Second Screening: SPFC linkage (Priority and Feasibility of Flood Project Integration) SPFC structures are expected to be the most feasible to improve as part of flood projects. Some non-SPFC structures in new flood project footprints could also qualify. 11

Ex) Tisdale Weir Sacramento River Tisdale Bypass Apron Stilling Basin to top of weir 11’ Sutter County Boat Ramp Tisdale Weir 12

What’s Notable? Help formulate multi-benefit projects for the CVFPP - Documented reconnaissance work on existing migration conditions More than 30 fish migration improvement opportunities - Some (e.g. Fremont Weir, Weir No 2) are already planned. 13

Next Steps Draft FMIO Snapshot Report is available now. Draft FMIO Comprehensive Report will be circulated for comments in Spring of Public draft will be released with Conservation Strategy (June 2014). Interactive map with associated data tables will be published on FPIP website after Public Draft released. 14