LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.

Slides:



Advertisements
Similar presentations
ISIS Accelerator Division
Advertisements

Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
The Stripping Foil Test Stand in the Linac4 Transfer Line
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
First Status Report on Show Stoppers for PSB Energy Upgrade 11. March 2010 PSB Energy Upgrade Working Group Meeting.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Commissioning of the PSB with Linac4 K.Hanke / CERN Review on PS Booster with Linac4 CERN, January 15-16, 2009.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
COMET Task Force 16/Oct/2008 J-PARC PAC meeting Satoshi MIHARA.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Wim Weterings Remy Noulibos
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LIU-PS Beam Dynamics Working Group Introduction and objectives
LINAC4 ADVISORY COMMITTEE
Installations up to Start of Commissioning
LIU / HL-LHC Cost and Schedule Review
Options and Recommendations for TL and Dumps
LIU – EVM status and next steps
PS Booster Energy Upgrade
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Update on the HiLumi/LIU parameters and performance ramp up after LS2
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB magnetic cycle 160 MeV to 2 GeV
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
SLHC-PP kick-off meeting, CERN 9 April 2008
ThomX – Commissioning Meeting – 25/01/2018
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011

upgrade of rings and extraction / transfer from 1.4 GeV to 2.0 GeV and increased intensity replace main power supply, number of smaller power supplies, magnets, kickers, etc. Scope of LIU-PSB upgrade of the injection from 50 MeV protons to 160 MeV H- and increased intensity re-build injection line for 160 MeV replace injection septum by stripping foil injection bumps diagnostics …

Upgrade of the Injection for Linac4 Why re-building the injection region? increased energy from 50 MeV to 160 MeV with Linac4  reduce space-charge effects at PSB injection injection of H- ions rather than protons  significantly reduce injection losses (at the moment about 50% of the beam is lost on the injection septum!)  more flexibility in tailoring emittances by transverse phase space painting

Present Multiturn Injection horiz. beam momentum horiz. co-ordinate septum closed orbit at injection (t 1 ) PSB closed orbit closed orbit after one turn (t 2 ) closed orbit after second turn (t 3 ) etc. as this process takes place, subsequent linac beam “slices” are injected, with increasing oscillation amplitude around the instantaneous closed orbit (“horizontal stacking”) beamlets are now “polygons”, as they have undergone several cuts they spiral up around the (moving) closed orbit, leading to a density distribution which is dense in the core and less dense in the outer part

Charge Exchange Injection more technical details:  review held 9-10 November, see  talk by W. Weterings at this meeting

Present and Future Injection Region B. Goddard, Review on PSB 160 MeV H - Injection, 9-10 November 2011

Booster Injection: Planning long LHC injectors stop Linac4 commissioning Linac4 reliability run potential long LHC injectors stop slotpotential slotpresent official slot for connection 1.Connection of Linac4 to the PSB during LS1 ruled out 2.Connect to the PSB during an intermediate length shut-down (2015/16 or 2016/17) 3.Connect to the PSB during LS2 (assumed 2018) 4.Depending on the physics results, there is still a (minor) possibility that LS1 could move

Upgrade of the Booster to 2 GeV study launched following Chamonix 2010  feasibility, cost & time lines confirmed RCS alternative studied following Chx  Booster option retained 3 rd energy upgrade: from 800 MeV to 1 GeV (1988) from 1 GeV to 1.4 GeV (1999) from 1.4 GeV to 2.0 GeV (LS2) - no technical showstoppers identified - however a number of equipment and - systems need to be changed or upgraded - high-impact items: MPS, RF, kickers, septa, …

Expected Performance Gain with 2 GeV injection at 2GeV lowers space charge effect by a factor (  2 ) 2GeV /(  2 ) 1.4GeV ≈1.63  can inject beams ~65% more intense keeping the same space charge tune spread as now if we assume to conserve the longitudinal emittance (e.g., 1.3 eVs, LHC beam h=1), the bunch at 2GeV will be 33% shorter at the exit of the PSB, which would in principle limit the above gain to less than 40%; however, the PS bucket acceptance at injection also increases by 50%, which allows for injection of larger longitudinal emittances, recovering the desired gain (50% larger longitudinal emittance required) larger transverse emittances acceptable at the PS injection, if the final transverse emittances to the LHC are the same? Unlikely, as the previously PSB specified transverse emittances have meanwhile become the “nominal” LHC emittances!  at least 65% intensity increase (within constant emittance) expected 1/  2 1/  z 1/ 

Booster 2 GeV Upgrade: Power Main Power Supply - present converter cannot deliver more than 1.4 GeV - POPS-type converter proposed (capacitor bank) - divide machine in 2 circuits (inner and outer rings) - will make R 1+4 trim power supply obsolete - new building needed Other Power Supplies - number of smaller converters to be changed Reference magnet Ring 2&3 GND MPS B 2500V 5500A QFO 600V 450A QDE 600V 450A GND MPS A 2500V 5500A 64 BHZ Rings 1&4 128 QFO Rings 1,2,3&4 64 QDE Rings 1,2,3&4 64 BHZ Rings 2&3 Reference magnet Ring 1&4 Ring 1 B- filed measure ment Ring 2 B- filed measure ment New MPSB (2 GeV) (26m x 16m) S. Pittet  talk by S. Pittet at this meeting

Booster 2 GeV Upgrade: Magnets, Dumps, Transfer Magnets - main dipoles can operate at 2 GeV with some modifications (cooling, retaining plates) - number of other magnets to be changed Beam Intercepting Devices - new dump and beam stopper being designed - removal of the old and installation of the new dump being studied for LS1 Extraction & Transfer - number of septa/kickers cannot operate at 2 GeV, notably extraction kickers (BE.KFA) and recombination septa (BT.SMV) Booster main magnet undergoing tests for operation at 2 GeV A. Newborough, M. Buzio

Booster 2 GeV Upgrade: RF System Finemet cavity test installation in the PSB complete upgrade of the Booster high-level RF to new Finemet cavities development of a prototype system (collaboration with KEK-RF team) installation in PSB during winter stop approved by IEFC on 7 Oct  talk by M. Paoluzzi at this meeting upgrade program for the LL RF M. Paoluzzi

Other Items Cooling & Ventilation - refurbishment of cooling station and some distribution piping - complete refurbishment of existing ventilation plant keeping the same functionalities Electrical Systems - re-design of the system has started Other items: - beam instrumentation, transport, controls, interlocks, design office, vacuum, etc. etc. for the full picture see Work-PackageResponsibleUnit 2.Beam DynamicsC. CarliBE/ABP 3.MagnetsD. Tommasini, A. NewboroughTE/MCS 4.RF SystemsA. Findlay, M. Paoluzzi, M.E. Angoletta, A. Blas, A. Butterworth BE/RF 5.Power ConvertersS. Pittet, D. NisbetTE/EPC 6.InstrumentationJ. TanBE/BI 7.Beam Intercepting DevicesO. Aberle, A. MassiEN/STI 8.Vacuum SystemJ. HansenTE/VSC 9.L4-PSB Transfer and PSB InjectionW. Weterings, C. CarliTE/ABT, BE/ABP 10.PSB Extraction and PSB-PS TransferJ. Borburgh, W.BartmannTE/ABT 11.ControlsS. JensenBE/CO 12.Electrical SystemsD. Bozzini, S. OlekEN/EL 13.Cooling and VentilationM. NonisEN/CV 14.Installation, Transport and HandlingI. Ruehl, C. BertoneEN/HE 15.Civil EngineeringL.A. Lopez-HernandezGS/SE 16.Radiation ProtectionJ. VollaireDGS/RP 17.Interlock SystemsB. Puccio, P. Dahlen, B. ToddTE/MPE 18.Alarms --/ Access Systems - Doors --/ SurveyT. DobersBE/ABP 21.Commissioning and OperationB. MikulecBE/OP 22.Dismantling --/---

Time Lines Linac4 connection possible as from end 2015, constrained by LHC stops full upgrade including 2 GeV to be completed during LS2

Next Steps TDR to be written Ongoing MD activity during the next years Some work during coming winter stops (removal ion distributor, Finemet test installation, …) Some work to be done during LS1: change of the Booster dump, renovation of handling equipment, …) Most work in LS2 (complete hardware upgrade); if Linac4 connection could be advanced, this would reduce the stress on the intervening groups and on the recommissioning, and is therefore the preferred scenario If Linac4 and the 2 GeV upgrade will coincide in LS2, we will have a lot to do  We will come out of LS2 with a new Booster