FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.

Slides:



Advertisements
Similar presentations
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Advertisements

MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
MPSRSYS- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW SYSTEMS OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Gayle K. Martin November 14, 2016
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
CINEMA System Engineering
SPP FIELDS V1234 Thermal PSR
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
GLAST Large Area Telescope:
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS FM4/FM5 INSTRUMENT SUITE
0.0 Instrument Suite Name Presenter’s name
University of California, Berkeley
Integration and Test Organization Chart
Presentation transcript:

FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley

FM4/FM5 IPSRSYS - 2 UCB, May 5, 2006 Requirement Verification Status Performance Requirements - FM1/2/3/4/5 MRD Verification Status Environmental Test Requirements - FM1/2/3/4/5 ETM Verification Status Performance Verification Tests and Operating Hours Resource Requirements - Instrument Payload History and Status Instrument Suite Test Flows FM4 Environmental Test Flow FM5 Environmental Test Flow Problem Failure Reports (PFRs) PFR Statistics PFR Status and discussion Open Items and Residual Risk FM4/5 Open Items Overview

FM4/FM5 IPSRSYS - 3 UCB, May 5, 2006 Performance Verification Mission Requirements Document (MRD) Verification Matrix MRD Verification Matrix is available on-line at: ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_001H.2_MRD.xlsftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/thm_sys_001H.2_MRD.xls 03/16/06 MRD Rev H: Released Verification Matrix for F2 Probe PER 05/05/06 MRD Rev H.1: Released Verification Matrix for FM4/FM5 Instrument Suite PSR 05/04/06 MRD Rev H.2: Released Verification Matrix for F3 Probe Bus PSR MRD Status Statistics 142 Instrument Specific Requirements 132 Requirements for FM4/5 have been verified (GREEN) 7 Requirements for FM4/5 are pending (YELLOW) 3 Requirements have been waived (GREY) 0 Requirements have not been met (RED) Pending and Waived Requirements No pending requirements are considered liens to Probe-Instrument Suite Integration Verification activities have been planned for all pending requirements as part of normal course for Probe-level Integration or Environmental Test Waived requirements are provided as back-up material

FM4/FM5 IPSRSYS - 4 UCB, May 5, 2006 MRD Verification Status 142 Instrument Specific Requirements 7 Requirements are pending (YELLOW) REQUIREMENTSTATUS IN-16 Magnetic CleanlinessPending Suite Mag Survey, main offenders tested IN-17 Electrostatic CleanlinessPending Probe ESC Survey, components evaluated IN-21 Instrument Electrical ICD (IDPU-to-BAU)Pending Probe F4/F5 IDPU Integration, F2 Integration complete IN-22 Instrument Mechanical ICDsPending Probe F4/F5 Instrument Integration, F2 Integration complete IN.ESA-13 ESA On-orbit CalibrationPending on-orbit calibration, ESA ground cal complete on all units IN.DPU-05 FSW Data CompressionPending FSW V.X release, FSW bench test complete IN.DPU-15 FSW Science TLM (Burst, Triggers)Pending FSW V.X release, FSW bench test on-going

FM4/FM5 IPSRSYS - 5 UCB, May 5, 2006 Environmental Test Verification Environmental Test Matrix (ETM) ETM is available on-line at: ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1 Management/1.3 Systems Engineering/1. Requirements/ETM_TestRecord_10.xls 05/19/05 ETM_TestRecord_5: Released Test Record after FM1 Instrument Suite PER 06/29/05 ETM_TestRecord_6: Updated Test Record at FM2/FM3 Instrument Deliveries 08/25/05 ETM_TestRecord_7: Released Test Record for FM2/FM3 Instrument Suite PER 09/20/05 ETM_TestRecord_8: Released Test Record for FM1 Instrument Suite PSR 11/10/05 ETM_TestRecord_9: Released Test Record for FM2/3 Instrument Suite PSR and FM3/4 Instrument Suite PER 05/05/06 ETM_TestRecord_10: Released Test Record for FM4/5 Instrument Suite PSR ETM Status Vibration Testing: Over 100 Vibration Tests have been completed Thermal Vacuum Testing: Over 125 Thermal Vac Tests have been completed, over 300 cycles and >3500 hours SPARES: Spare FGM and EFI Y-axis SPBs (6 cycles) completed.

FM4/FM5 IPSRSYS - 6 UCB, May 5, 2006 Performance Tests Instrument Suites have gone through numerous CPTs/LPTs. Over 80 CPTs/LPTs have been completed on all units. THM-SYS-PROC-005 Instrument CPTs (2-3 per Suite): Initial Run at Instrument Suite Level, Pre-Environmental, Post-Environmental Runs on Probe THM-SYS-PROC-006 Instrument LPTs (over 15 per Suite): Pre-TV, 2 Cycles every Hot/Cold ESA/IDPU TV, 6 Cycles every Hot/Cold Suite TV, Post-TV CPTs/LPTs are also performed as necessary pre- and post- workmanship vibes, thermal re-tests, rework, etc. Performance Tests on F2 Probe CPT/LPT procedures have been successfully run through ITOS on the Probe Procedures and ITOS data base have been reviewed for conversions, limits and logic Performance Tests

FM4/FM5 IPSRSYS - 7 UCB, May 5, 2006 Power Log Hours by Flight Model: Hours shown have been accumulated as Integrated Instrument Suite, additional hours were accumulated during board level tests and integration Operating Hours

FM4/FM5 IPSRSYS - 8 UCB, May 5, 2006 Mass Status and History Mass Status Probe Dry Mass is limiting mass resource Probe Dry Mass Current Best Estimate (CBE): 77.0 kg Probe Dry Mass Not to Exceed (NTE) due to Delta-V requirement: 81.8 kg Probe Dry Mass Margin: 6.3% Margin with >97% mass weighed Integrated F2 Probe was measured prior to shipment to JPL: 76.3 kg (corrected value)

FM4/FM5 IPSRSYS - 9 UCB, May 5, 2006 Power Status and History Power Status Heater power estimate, 10.24W, contains most uncertainty. Initial results from Probe Thermal Balance Test showed good model correlation. Final model correlation and results are in process. Probe CBE: 36.6 W Probe Capability: W Probe Margin: 10.2%

FM4/FM5 IPSRSYS - 10 UCB, May 5, 2006 FM4/FM5 As-Run Test Flow FM4/5 PER: 11/10/05 FM4/5 IDPU/ESA TV Test thm-sys-proc-004 Instrument TV: 2/08-2/12/06 4 cycles, +55C to -40C Op, +55C to -60C Non-Op PFR 141: LVPS ESA Oscillation – OPENED FM4 thm-esa-proc-007 IDPU/ESA Vibe: 12/09/05 FM5 thm-esa-proc-007 IDPU/ESA Vibe: 12/09/05 SAI-TM-2430-RevD (Acc), 7.09Grms FM4 thm-sys-proc-005 LPT: 12/12/05 FM5 thm-sys-proc-005 LPT: 12/12/05 thm-esa-proc-016 IDPU/ESA TV: 12/14-12/15/05 1 cycle, +65C to -60C Survival, +55C to -40C Op PFR 135: 5V Drop on SST Turn-On – OPENED PFR 136: PCB Monitor Temp Dependence – OPENED thm-sys-proc-011 PFR 127,135 Close-out: 1/23/06 2 cycle re-test, full temp range, dwells every 10 deg FM4/5 Instrument Payload TV Re-Test FM4/5 ESA/IDPU Vibration Test FM4/5 PER FM4/5 Instrument Payload LPT thm-esa-proc-007 IDPU/ESA Vibe: 4/14/06 F2 Probe Integration PFR 127,131: DCB Reset – OPENED FM1-6 DCB Modification Required FM4/5 ESA/IDPU Vibration Test FM4/5 Instrument Payload TV Test LVPS ESA Oscillation Investigation FM1-6 LVPS Modification Required thm-sys-proc-004 Instrument TV: 3/10-3/16/06 3 cycles, +55C to -40C Op PFR 127,131: IDPU Reset – CLOSED PFR 135: 5V Drop on SST Turn On – CLOSED PFR 141: LVPS ESA Oscillation – CLOSED PFR 136: PCB Monitor Temp Dependence – CLOSED (fly as is) FM1,2,3 IDPU TV Re-Test thm-sys-proc-012 PFR 141 Close-out: 2/27/06 2 cycle re-test, full temp range, dwells every 10 deg FM4 thm-sys-proc-005 LPT: 4/17/06 FM5 thm-sys-proc-005 LPT: 4/18/06 FM4/5 Instrument Post-Vibe LPT

FM4/FM5 IPSRSYS - 11 UCB, May 5, 2006 PFR Summary 55 PFRs logged since FM2/3 PSR (PFR 117 – PFR 170) 42 PFRs found during Probe-Instrument Integration, 3 affected Instruments PFR 127: IDPU Reset during Probe Self Compatibility Test, and PFR 131: IDPU Rejecting all commands Required DCB modification, TV Re-Test, Workmanship Vibe PFR 164: IDPU Current Oscillation during Probe 2 TV-Balance Cold Fly As Is (unloaded ESA supply, situation not expected on orbit) 9 PFRs affected FM4: all closed 9 PFRs affected FM5: all closed 8 PFRs affected Flight Spare: one open, will be closed when IDPU box is integrated List below shows only instrument PFRs:

FM4/FM5 IPSRSYS - 12 UCB, May 5, 2006 FM5 Instrument Suite Magnetics Suite magnetic survey will be done immediately prior to FM5 Instrument-Probe Integration. No risk associated. FM2/FM3/FM4 Suites have successfully gone through survey. FM4/5 PSR Open Items/Risk