April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

GPA Renewable Energy Resource for Guam Power Authority
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Generation Adequacy Task Force Update to WMS September 14, 2011.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
ERCOT Generation Adequacy Study TAC Meeting February 7, 2002.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Severe Winter Weather Resource Outage Analysis Chad Thompson Operations Working Group September
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
NAESB Conference Call October 10, 2008 DSM EE RETAIL GROUP.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Operations Update ERCOT Board Meeting March 18, 2003.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Generation Adequacy Task Force Meeting April 10, 2014.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Overview of New Control Room Desk
Mid-Continent Area Power Pool
Sandip Sharma ERCOT Manager, Operations Planning
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning

Regional Planning Group Meeting April 13, Wind Capacity ERCOT currently has ~2,981 MW of wind capacity online There are ~1,605 MW additional wind capacity that will be on-line by summer 2008 (executed interconnection agreements; sum = 4,586 MW) More wind units are expected to become operational before the end of ,586 MW is ~7.1% of 2008 peak demand forecast for ERCOT (64,318 MW)

Regional Planning Group Meeting April 13, History ERCOT released an RFQ on May 23, 2006 ERCOT evaluated the responses, and worked with bidders to develop a final scope of work ERCOT released an RFP to a short-list of qualified bidders on January 22, 2007 ERCOT has selected GE Energy to conduct the study

Regional Planning Group Meeting April 13, Other Regions Similar studies have been conducted in several regions: –NY ISO –Minnesota –Wisconsin (WE Energies) –Ontario –Alberta –California –Bonneville PA –PacifiCorp –Germany

Regional Planning Group Meeting April 13, Study Goals Identify changes to the methodology for assessing the level of required ancillary services (regulation, responsive, balancing, replacement and non-spinning reserves) Assess the amount of each ancillary service required for three specific wind scenarios Identify changes to current procedures or new procedures for operations with impending severe weather conditions

Regional Planning Group Meeting April 13, Study Methodology 1)Quantitative analysis of the hourly sum of wind generation and load (net load) 1)Analysis of net load variability at different time-frames 2)Analysis of correlation of load and wind generation during periods of specific interest 3)Correlation between variability of net load and load magnitude 4)Correlation between net load variability and seasons or time of day 2)Analysis of the predictability of net load 3)Evaluation of Ancillary Service Needs and Costs

Regional Planning Group Meeting April 13, Extreme Weather Events

Regional Planning Group Meeting April 13, Study Deliverables Statistical analysis of the variability of wind resources and system load Analysis of the accuracy of day-ahead wind and load forecasts and the impact on unit commitment Analysis of the adequacy of ramp-rates of generation units expected to be on-line during different seasons for the three scenarios Evaluation of specific changes required to the current ERCOT methodology for determining the adequate levels of regulation, non-spin, and balancing energy service Evaluation of the adequacy of the currently procured level of responsive reserves (2,300 MW) with respect to changes in wind generation output (not unit contingencies) Evaluation of the additional system costs of maintaining adequate ancillary services for the selected scenarios A detailed report documenting the methodology and results of this study

Regional Planning Group Meeting April 13, Wind Levels Project scope includes evaluation of three wind scenarios Wind levels and locations have not yet been determined The relationship between ancillary service requirements and increasing wind capacity is likely to be non-linear Operations may need one scenario to evaluate likely wind levels in spring 2008 (~5,000 MW) Suggestions for reasonable scenarios would be appreciated

Regional Planning Group Meeting April 13, Project Schedule GE Energy will complete its analysis on or before October 31, 2007 ERCOT System Planning will communicate the interim and final results of this study to RPG, ROS, and WMS

Regional Planning Group Meeting April 13, Summary This study will evaluate: –the impact of increasing levels of wind capacity on ancillary services requirements –the correlations between wind output and load –the correlation of the accuracy wind and load forecasts –the impacts of extreme weather events –the costs of increased ancillary services as a result of increased wind capacity in ERCOT