Institut für Angewandte Physik LINAC AG H. Podlech 1 Injector Development for MYRRHA 3 nd Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-3) Louvain-la-Neuve April 2013 Holger J. Podlech M. Amberg, D. Mäder, R. Ratzinger, A. Schempp, R. Tiede, M. Vossberg, C. Zhang C. Lenz, M. Busch, F. Dziuba, A. Seibel Institute for Applied Physics (IAP) University of Frankfurt, Germany
Institut für Angewandte Physik LINAC AG H. Podlech 2 The MYRRHA Proton-Driver
Institut für Angewandte Physik LINAC AG H. Podlech 3 Present Scheme of the MYRRHA Injector 1.5 MeV 4-Rod RFQ Dynamics based on KONUS Room temperature CH-cavities Superconducting CH-cavities
Institut für Angewandte Physik LINAC AG H. Podlech 4 Short Protoype has been built Q=4300 R p =90 k m P/L=19 KW/m Ready for RF tests Goal: 50 kW/m ParameterUnitValue Cavity type4-Rod FrequencyMHz176.1 E in keV30 E ou tMeV1.5 Lengthm4 Q (estimated)3800 R p (estimated) kmkm 67 UkV40 P/LkW/m25 PkW MeV RFQ Optimized stem cooling
Institut für Angewandte Physik LINAC AG H. Podlech 5 MAX CH-Prototype (room temperature)
Institut für Angewandte Physik LINAC AG H. Podlech 6 MAX CH-Prototype rt RF and beam tests until end of 2013
Institut für Angewandte Physik LINAC AG H. Podlech 7 MYRRHA sc CH cavities CH3 CH4 CH5 CH6 First CH (sc) prototype
Institut für Angewandte Physik LINAC AG H. Podlech 8 Bellow Tuner Static Tuners Helium VesselCoupler Flanges 325 MHz CH-Prototype Praparation Flanges Frequency (MHz) Cells7 Length -def (mm) 505 Diameter (mm)348 E a (MV/m)5 E p /E a 5.1 B p /E a [mT/(MV/m)]13 G ( ) 64 R a /Q 0 ( ) 1248 R a R s ( 2 ) 80000
Institut für Angewandte Physik LINAC AG H. Podlech MHz CH-Prototype
Institut für Angewandte Physik LINAC AG H. Podlech MHz Cavity during Fabrication at RI Delivered without preparation (no BCP, no HPR) and without flanges (!) Contaminated surface
Institut für Angewandte Physik LINAC AG H. Podlech 11 First Cryogenic Test at IAP Frankfurt
Institut für Angewandte Physik LINAC AG H. Podlech MHz Cavity: Cryogenic Test no BCP, no HPR
Institut für Angewandte Physik LINAC AG H. Podlech 13 Disadvantages of Present Design Sensitivity of longitudinal dynamics Available space for diagnostics Investigation of an alternative design based on a more „conventional“ solution with negative synchronous phase
Institut für Angewandte Physik LINAC AG H. Podlech 14 New Design Negative synchronous phase Based on CH-cavities Room temperature part: MeV Superconducting part: MeV 5-gap cavities Goal: More space for diagnostics Goal: Simpler cavities More cavities but cheaper per cavity Shorter cryo modules with warm quadrupoles
Institut für Angewandte Physik LINAC AG H. Podlech 15 New Design: Scheme and Diagnostics ECR LEBT RFQ B C1C2 C3 C4 D D B SC1 SC2 SC3 SC4 SC5 SC6 Steerer Phase probe/Beam pos. monitor Current transformer Faraday cup Halo Monitor Collimator Beam profile monitor 0.03 MeV 1.5 MeV 3.5 MeV 17 MeV
Institut für Angewandte Physik LINAC AG H. Podlech 16 Preliminary Beam Dynamics Results - New Design injection into first cryo module
Institut für Angewandte Physik LINAC AG H. Podlech 17 Cavities for the Alternative Design ParameterUnitCH-1 Beta FrequencyMHz176.1 Gap number5 Length (5 ) mm411 Cell lengthmm82.3 Aperturemm40 UaUa MV1.64 Accelerating gradientMV/ m5 E p / E a 4.4 EpEp MV/m22 Prototype is planned to be constructed
Institut für Angewandte Physik LINAC AG H. Podlech 18 Thank you