E-MERLIN & Radio issues Simon Garrington Wide-fields (ie ~10x10 arcmin) uJy sensitivity; 50-150 mas resolution key science driver for e-MERLIN ~1500 sources.

Slides:



Advertisements
Similar presentations
Wide Field VLBI Imaging I (Background) Indra Bains.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
21 st Century VLBI Mike Garrett (JIVE) Astro-lunch, 16 April
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
S.T. MyersEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Algorithm Research & Development Steven T. Myers (NRAO) CASA Project Scientist with.
3rd September 2006SKADS Workshop 2006Mike Garrett 1 DS2 - Science & Data Simulations Mike Garrett (JIVE)
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
RadioNet First Software Forum, Jodrell Bank – 01Mar05 1 Algorthmic Issues from the First RadioNet Software Forum – a synthesis Steven T. Myers National.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Lessons learned from cm-wave interferometry Interferometry analysis is less straightforward than single aperture analysis. Astronomers need ‘support’.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
Virtual Survey System sept 04 ASTRO-WISE- federation OmegaCEN AstroWise a Virtual Survey System OmegaCAM – Lofar – AstroGrid –((G)A) VO AstroWise a Virtual.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
● Radio telescope arrays – km diameter – Resolution arcmin to micro-arcsec at radio wavelengths ● Similar (baseline/ wavelength) for other regimes.
The NCAR 449 MHz Modular Wind Profiler Development Bill Brown, Steve Cohn, Brad Lindseth Terry Hock, Charlie Martin NCAR / EOL Jim Jordan, Dan Law, Warner.
Sanjay BhatnagarEVLA Advisory Committee Meeting May 8-9, EVLA Algorithm Research & Development Progress & Plans Sanjay Bhatnagar CASA/EVLA.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
E-MERLIN : a pathfinder for the SKA (a summary of the e-MERLIN talk given at the Berkeley SKA meeting) e-MERLIN : a pathfinder for the SKA (a summary of.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
H Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Recent progress in EVLA-specific algorithms EVLA Advisory Committee Meeting, March 19-20, 2009 S. Bhatnagar and U. Rau.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
E-MERLIN & EVLA P.J.DiamondP.J.Diamond MERLIN/VLBI National Facility Jodrell Bank Observatory University of Manchester MERLIN/VLBI National Facility Jodrell.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
ALMA Project Status Adrian Russell. Where is ALMA? El llano de Chajnantor ALMA.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Anita Richards and members of MERLIN, RadioNet and AstroGrid teams. ● 'Old' radio archive access ● Source lists, fixed images or visibility data ● Most.
AstroGrid and Virtual Observatories for Radio Interferometry arrays/ proposals Anita Richards Paul Harrison Noel Winstanley (Jodrell Bank Centre for Astrophysics,
Anita Richards and members of MERLIN, RadioNet and AstroGrid teams. ● 'Old' radio archive access ● Source lists, fixed images or visibility data ● Most.
SA1: overview, first results
Andreas Horneffer for the LOFAR-CR Team
NRAO VLA Archive Survey
Modern Interferometric Arrays
Computing Architecture
S. Bhatnagar: ASTRON, Dwingeloo, June 29th 2010
EGEE NA4 Lofar Lofar Information System Design OmegaCEN
EVLA Project Peter Napier
Telescopes and Images.
Committee Charge Fred K.Y. Lo
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
Oxford Algorithms Workshop
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
John Conway Bonn, Sept 20th, 2007
Shared Risk Science with the EVLA
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

e-MERLIN & Radio issues Simon Garrington Wide-fields (ie ~10x10 arcmin) uJy sensitivity; mas resolution key science driver for e-MERLIN ~1500 sources for deep 1.5 GHz field AG, VO tools already essential for multi- Making transition from expert to routine use GOODS HST/ACS N 16x10arcmin

e-MERLIN Project Status DESIGN: 2x2 GHz;widefield;freq. flexible Front-ends –New C-band (4-8 GHz) installed –L-band lens, mechanisms, horns: in place IF,samplers –Design/prototype: on telescope Fibre network –90 km new dig + 600km trunk –All installed & connected –First light on local sections –Cambridge-Birmingham tests start today Digital & transmission –Modules ready for tests this year Correlator –WIDAR from DRAO –16 x 128 MHz sub-bands; 2048 complex lags –1 st fringes: prototype 2006 (4 tels 1 band) – Full correlator 2007/8

e-MERLIN software/imaging challenges All 1.5 GHz (5GHz) images will require wide-field mapping To reach 1-3uJy noise in normal 12-24hr runs Wide-field & wide-band imaging techniques & algorithms –EVLA, LOFAR, WSRT,LWA  KAT, NTD  SKA –‘Image-plane’ calibration (ionosphere; antenna pointing) –Wide-band imaging: MFS –Dwingeloo workshop June ’05: ALBUS (RadioNET JRA) –Advanced Long Baseline User Software –ASTRON,JIVE,MPIfR,JBO –Parallelisation;calibration;wide-field;wide-band

ALBUS Progress Smarter pipelines/scripts... Improving the products delivered to the users/archives –Smart calibration Using GPS+Ionospheric models (Anderson. JIVE) Using WVR/GPS for tropospheric calibration (Roy, MPIfR) –Better pipelines ParselTongue: Python for AIPS – ideal for CEA integration (Kettenis, JIVE) –Wide-band & Wide-field: data splitting & task parallelisation & (JIVE, JBO) Opportunity for AG Workflow management

Summary New generation of cm- and metre-wave radio telescopes in 2007> New ways to access data –Some (eg LOFAR) will be radically different –Others eg e-MERLIN,EVLA Lots more data; wider fields; new algorithms required; faster & smarter pipelines Expectation that data may not move Increased sensitivity will motivate more multi- studies using VO tools Of course, data will be VO-ready –Renewed interest & effort in algorithms and processing strategies –No big new packages; interfaces to ‘legacy code’; workflows etc. ParselTongue opportunity