Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Recent Surface Studies in KEK-STF
New Results on Field Emission Suppression in EP Multi-Cell Cavities at JLab Rong-Li Geng Jefferson Lab ILC10, March 26-30, 2010, Beijing, China.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Dec/3/2015WG2 in TTC Meeting Field emission / Radiation in V.T. Kirk.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Possible Relationship Between Defect Pre-Heating and Defect Size H. Padamsee Cornell S0 Meeting, Jan 26, 2009.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Recent Result for the STF-2 Cryomodule Operation
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Cavity Gradient R&D Status and Future Plans for TDP-2
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
Results on second sound method
for the FNAL/ANL, JLab, and Cornell cavity teams
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S0 Status report from KEK
Cost reduction activities in cavity fabrication at MHI
R&D Activity for Field Emission and Vertical EP
Masaru Sawamura (JAEA)
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
FOR SUPERCONDUCTIVE CAVITIES
TTC Meeting, 28 February - 2 March, 2011, Milan
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Quench Studies in Single and Multicell N-Doped Cavities
The LCLS-II HE High Q0 and Gradient R&D Program
Presentation transcript:

Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido, K. Umemori, K. Watanabe(KEK) abstract Vertical test for 1.3GHz 9-cell cavity has been routinely carried out over one year since 2008 in KEK-STF. Temperature mapping (T-mapping) system using 352 carbon resistors was introduced to identify the heating location at thermal quenching of the cavity. The T-mapping system identified perfectly the heating location in every vertical test for S1-Global project. As X- ray-mapping system, 142 PIN diodes were used, and the x-ray emission site was detected under heavy field emission. During the vertical test, it is convenient to display the result of T- mapping and X-ray-mapping by online monitor system. For this purpose, the new online monitor system was developed by using EPICS (Experimental Physics and Industrial Control System) and Java script, and introduced in recent several vertical tests. As a data acquisition system, nine data loggers (MW100, YOKOGAWA) are used, and signals from totally 540 channels are stored every 0.1 sec. The online display for T-mapping and X-ray-mapping is updated automatically every five seconds. In this report, the summary of T-mapping/X-ray-mapping result and the online monitor system will be described in detail. Introduction The new vertical test facility and the electro-polish (EP) facility were constructed for ILC (International Linear Collider) and ERL (Energy Recovery Linac) project at KEK-STF in It is possible to do all processes, except annealing, in STF after the delivery of cavities. Successful commissioning of this vertical test system was carried out with AES#001, after solving a few technical issues. Identification of heating locations during the thermal quenching is an important task of vertical test, in addition to the measurement of Q 0 – E acc curve and maximum gradient. For this purpose, the new T-mapping system was developed and introduced [1], which allows to identify the hot spots with an efficiency close to 100%. A cavity occasionally quenches due also to field emission, which is caused by the electron bombardment. In this case, an associated x-ray emission would be detected. Recently, an X-ray- mapping system using 120 PIN diodes is completed and attached around each iris region. Correlation was found between the heating and the x-ray emission in the first and third vertical test of MHI#9. In the third test, the pre-heating phenomenon, which level is generally small and appears before quench, was also observed with the x-ray emission. Probably, the electron impact is responsible for the pre-heating phenomenon in this test. # of carbon resistor : , # of PIN diodes : , Data sampling time : 0.1sec, Measured pass-band modes : π ~ 3π/9 Summary The T-mapping system identified perfectly the heating location at the quench during the vertical tests for S1-Global project in STF. The right figure shows the summary of the heating cell for every vertical test. There is no excess bias in the heating cell. The main cause is the thermal quench due to defect or contamination. However, in many cases, any target was not observed around the heating location. This is the most common case in STF. The new online monitor system using EPICS and Java was introduced in recent several tests. It is easy to identify the heating location by the online T-mapping display. WEPE013 Transition of heating location for MHI#7 1 st 2 nd 3, 43MV/m 6, 7, 8π/9, π(17MV/m) 3π/9(31MV/m) 4π/9(27MV/m) 6~8π/9(17~19MV/m) 5π/9(25MV/m) EP2 : 20μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 5, 38MV/m 3, 4, 8π/9, 5, 3, 4, 8π/9, Transition of heating location for MHI#8 EP2 : μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 3, 4, 5, 7, 8π/9, EP2 : 20μm Degreasing(FM-20) +HWR+HPR 1 st 2 nd rd th 3, 40MV/m EP2 : 20μm (low current density) Degreasing(FM-20) +HWR+HPR cell #2, 172° cell #2, 86° 3, 4, 5, 7, 8π/9, 3, 1 st 7, 8π/9, 2 nd Transition of heating location for MHI#9 1 st 2 nd EP2 : 20μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 4π/9, 5, 6, 7, 8π/9, 7, 8π/9, EP2 : 20μm Degreasing(FM-20) +HWR+HPR 3 rd black red green blue Results of T-mapping for MHI#7-#9 Heating location is different at every vertical test for these cavities. On the other hand, the same location was heating for MHI#5 and #6 [1]. This means the quality of EBW is improved for MHI#7-#9. However, the problem, which is the gradient drop below 20MV/m, still remains at STF. Even in such a low quench field, any target was not found around the heating locations in almost all cases. For MHI#8, two defects (one pit and one bump) were observed. The pit type defect was removed by the local grinding machine. After that, the gradient was improved from 16 to 27MV/m. References [1] Y. Yamamoto, et al., “A new cavity diagnostic system for the vertical test of 1.3GHz superconducting 9-cell cavities at KEK-STF”, PAC’09, Vancouver, Canada, (2009), TU5PFP076. [2] Y. Yamamoto, et al., “Cavity diagnostic system for the vertical test of the baseline SC cavity in KEK-STF”, SRF’07, Beijing, China, (2007), WEP13. [3] T. Saeki, et al., TTC meeting 2010, FNAL, U.S. “ Pre-heating observed at 3 rd V.T. for MHI#9 These figures show the pre-heating observed at the third vertical test for MHI#9. The left figure shows the time trend, and the right one shows the correlation between the gradient and the heating. In the purple framework of the right figure, the T-mapping at the quench is shown. Before the quench, the pre-heating location was on the meridian of the cell #8 and #9. However, at the quench, the cell #2 was heating. The heating at the quench is higher and pulse-like, compared to the pre- heating. Quench location Pre-heating location Pre-heating location was consistent with the highest x-ray emission. This means the phenomenon is induced by the electron impact. If the yield of electron is increased, this location may be quenched. Highest x-ray region Quench location Pre-heating location Online display for T-mapping & X-ray mapping cavity# of V.T.Gradient [MV/m] Radiation level [μSv/h] P.D. (Top) [V] P.D. (Bottom) [V] larger direction MHI#51 st 27.3>999>>10>10top MHI#52 nd top MHI#53 rd – MHI#61 st 25.7>999>108top MHI#64 th – MHI#66 th 27.7> top MHI#71 st bottom MHI#72 nd 33.6>99900>141top MHI#81 st bottom MHI#82 nd bottom MHI#83 rd – MHI#84 th 37.8>99900>143top MHI#91 st 25.0>99900>1010top MHI#92 nd top MHI#93 rd 27.0>99900>140top Comparison of radiation level between top and bottom direction from P.D. From the signals of PIN diodes attached on the top and bottom flanges of a cavity, it is found the direction of the higher x-ray emission is top or bottom. If the ratio is unbalanced, any common cause may be concerned. In STF, the top direction is the higher radiation level at many of vertical tests. This means a common cause is related to the field emission. For example, a contamination or particulate is falling down during the assembly working in the clean room, or brown stains [3] remain inside the cavity even after HPR. π 8π/96π/9 3π/9 π 1 st π 2 nd π Top flange Bottom flange 1 st π 2 nd π RF processing Online monitor system For convenience of the DAQ and the data analysis during the vertical test, the online monitor system using EPICS (Experimental Physics and Industrial Control System) and Java script was developed and introduced in the recent tests. The online display for the T-mapping and X-ray-mapping is updated every five seconds and the maximum temperature is identified in this span. It is possible to change the threshold level for the heating easily. 23MV/m26MV/m27MV/m28MV/m Time trend of PIN diode signalsTime trend of carbon resistors During the power rise, the pre-heating phenomenon was observed on the online display. At the quench field, the different location was heating as mentioned above.