Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Coupler Pair 2 nd 2.53 rd 4 th Vacuum 114:39 05/26/ , 38.6, :35 07/24/ , 2.1, :48 11/03/ , 82.3, :37 02/19/2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
TTF3 Coupler Assembly Cleanroom SLAC March 26, 2007 Jeff Tice.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
US Construction Project: SSs, PRY, Cavities and test program 1.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
WP High Beta Cavities Delivery
Tongming Huang (IHEP) On behalf of the power coupler working group
Completion of the MICE-US construction project
Field Emission Minimization for LCLS-II
ILC R&D Board Meeting: SRF Cavities Status and Plans
Power coupler at DESY & for XFEL
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
Chris Adolphsen Sergei Nagaitsev
EDR HLRF Work Packages Draft Summary
X-ray Pump-Probe Instrument
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 2 Overview Background –TTF3 coupler cleanroom status –Cleanroom Layout –SLAC TTF3 Couplers Website –Metrology Reports –Coupler Assembly –Schedule –Production & R&D

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 3 Cleanroom Status Cleanroom awarded to vendor Flowstar –Flowstar has worked at SLAC in building laser room at ESB All construction prints have been submitted to SLAC ES&H Construction for approval. –SLAC is still reviewing for approval –All but seismic has approved to start construction of cleanroom –Should have approval on Cleanroom fabrication is 8-10 weeks. Vendor has ordered long lead items for cleanroom fabrication

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 4 Cleanroom Layout Cleanroom layout Class 1,000 Gowning area Class 100 cleanroom 10 HEPA Filters 0.3) Class 10 cleanroom 24 ULPA Filters 0.12)

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 5 SLAC Coupler Website SLAC ILC TTF3 Website is up and running –Website location is on the SLAC website under Test Facilities TTF3 –URL Website has the following information available for all collaborators to view: –Drawings DESY LAL –Images 1st Pair of Couplers at SLAC Test Stand Prototype –Inspection Coupler Parts Kit List –Metrology Blank Inspection Report form (.xls) Completed Inspection Report –Assembly and Cleaning LAL Coupler Testing - Assembly and Cleaning Procedures SLAC Coupler Testing - Assembly and Cleaning Procedures –RF Processing –Delivery to FNL –Assembly to Module

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 6 SLAC Coupler Website

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 7 Coupler Metrology Reports The first set of CPI couplers have been inspected – Metrology reports on SLAC TTF3 website for viewing Inspection of couplers focus on the following: –Borescope: Visual inspection of all internal surfaces SLAC has two new Olympus borescopes to use for inspection –CMM: Coordinate Measuring Machines of critical dimensions of coupler parts –Visual: Visually inspect outside of coupler body

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 8 Coupler Metrology Reports SLAC TTF3 Metrology Report –Report has hyperlinks for: CMM reports Prints Borscope images Fixturing to hold couplers is completed: –V Block support stand to hold coupler during inspection –Linear actuator stand to move coupler during borescoping

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 9 Coupler Assembly Coupler assembly in building 033 cleanroom –Support stand ready for fabrication –CPC (Coupler Processing Cavity) one built two being fabed –Vacuum leak detector up and running for couplers –SLAC techs received Varian Vacuum training certification –Couplers to be cold tested on CPC

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 10 Schedule TTF3 Schedule: –Cleanroom is biggest driver (should be up and running February 08) –All long lead items for cleanroom equipment have been received and are at building 006 UPW system Ultrasonic bath Remote Particle Counter Oven at ESB Vacuum Leak Detector

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 11 Schedule

SLAC TTF3 Coupler Assembly November 26, 2007 SLAC 12 Production & R&D Production of Couplers to start once cleanroom is up and running. –Ordering more CPI Couplers for SLAC FY08 (10 total) –Have received 8 total Couplers of the FNAL order for processing R&D –Validate cleaning process through coupon testing –Coupon testing of Ultrasonic parts vs. High Pressure washing –Review process and streamline any nonessential procedures