PSM Audit Occurrences Randy Bentley. Topics: 1.Audits/Assessments 2.Violations of the OSHA Standard 1910.119, Process Safety Management. 3.Audit/Assessment.

Slides:



Advertisements
Similar presentations
Introduction to Process Safety Management (PSM) of Highly Hazardous Chemicals Aimed at preventing unwanted releases of hazardous chemicals especially into.
Advertisements

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
Course Material Overview of Process Safety Compliance with Standards
Course Material Overview of Process Safety Compliance with Standards
Checking & Corrective Action
ABA – 2012 Enforcement Update Richard E. Fairfax, CIH Deputy Assistant Secretary Occupational Safety and Health Administration.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
GCEAG Meeting January 12,  NPR Issued September 14, 2011  Comments were due November 14, 2011  Focuses on six new or expanded items  Stop work.
© Copyright SafetyInstruction.com 2005 AMMONIA SAFETY - SLIDE 1 OF 97 AMMONIA SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING 29 CFR WELCOME Chemicals.
SODIUM CYANIDE SAFETY - SLIDE 1 OF 98 © Copyright SafetyInstruction.com 2006 WELCOME SODIUM CYANIDE SAFETY CORPORATE SAFETY TRAINING REGULATORY STANDARD.
Nearly 50 American workers are injured every minute of the 40-hour work week and almost 17 die each day (OSHA) In 2003: 111 million workers at 7 million.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
School Safety Training
Safety and Health Programs
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Course Material 1.Overview of Process Safety 2.Compliance with Standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe Work Procedures.
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
Process Safety Management of Highly Hazardous & Explosive Chemicals
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
PSM Covered Chemical Facilities National Emphasis Program.
Process Safety Management - Tips for the Little Guy.
Process Safety Management
OSHA Safety and Health Regulations Related to SPF Applications
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
Center for Offshore Safety
Elements of Process Safety Management
Process Safety Management
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
Basics of OHSAS Occupational Health & Safety Management System
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
Occupational Safety & Health Act of 1970
Ert 312 LECTURE 4 OSHA & DOSH.
1. 2 An Update on OSHA’s Chemical PSM National Emphasis Program Presented to SOCMA March 3, 2011.
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Scenario Based Auditing
BERYLLIUM SAFETY - SLIDE 1 OF 86 © Copyright SafetyInstruction.com 2006 WELCOME BERYLLIUM SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING REGULATORY STANDARD.
IMPLEMENTING AN EFFECTIVE SAFETY PROGRAM What Am I Supposed To Do To Meet OSHA Standards?
Module 1.  Objectives - Provide information about worker rights under OSHA law - Learn how to file a complaint, and rights against discrimination and.
Lecture 2 ENGR. MARVIN JAY T. SERRANO Lecturer
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
VPP Mobile Workforce Demonstration for Construction.
Hazards Identification and Risk Assessment
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
© Copyright SafetyInstruction.com 2006 CARBON DIOXIDE SAFETY - SLIDE 1 OF 97 CARBON DIOXIDE SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING 29 CFR
KNPC HSE Management System
© Copyright SafetyInstruction.com 2006 BUTADIENE SAFETY - SLIDE 1 OF 97 BUTADIENE SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING 29 CFR WELCOME.
ACETONE SAFETY - SLIDE 1 OF 95 © Copyright SafetyInstruction.com 2006 WELCOME ACETONE SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING REGULATORY STANDARD.
SULFURIC ACID SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety and Health Program Don Ebert- Risk Manager (509)
OHSAS Occupational health and safety management system.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
© Copyright SafetyInstruction.com 2006 ASPHALT FUMES SAFETY - SLIDE 1 OF 63 ASPHALT FUMES SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING 29 CFR

Pipeline Safety Management Systems
OHS Staff Introduction Training
What To Do When OSHA Comes A-Knockin’
Safety plan.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
Process Safety Management
Presentation transcript:

PSM Audit Occurrences Randy Bentley

Topics: 1.Audits/Assessments 2.Violations of the OSHA Standard , Process Safety Management. 3.Audit/Assessment Findings 4.Necessities for Successful Audits/Assessments

Audits/Assessments Why we do them: 1.OSHA PSM/EPA RMP, Compliance Audit requirements. 2.Recent OSHA/EPA Visit 3.Management Changes 4.Internal Improvement Exercises 5.Internal/Corporate Standards

PSM OSHA Citations 2012-Present* PSM Element# of Citations Employee Participation4 Process Safety Information71 Process Hazard Analysis73 Operating Procedures44 Training13 Pre-start Up Safety Review1 Mechanical Integrity60 *U.S. Department of Labor; Occupational Safety & Health Administration; 200 Constitution Ave., NW, Washington, DC Nov. 11, 2013.

PSM OSHA Citations, 2012-Present* PSM Element (cont.)# of Citations Hot Work Permit0 Management of Change18 Incident Investigation9 Emergency Planning and Response9 Compliance Audits24 Contractors0 Trade Secrets0 *U.S. Department of Labor; Occupational Safety & Health Administration; 200 Constitution Ave., NW, Washington, DC Nov. 11, 2013.

1.Audits covered all triggers: Referral, NEP, Complaint, Accidents, etc. 2.Referrals were the most common trigger for audits. 3.Region 5 = $1,752, Citations; Avg. $5,376 Each 5.42 Organizations; Avg. 8 Citations per Audit More Statistics

Audit/Assessment Findings ElementAudit 1Audit 2Audit 3Audit 4Audit 5Totals Employee Participation 336 Process Safety Information Process Hazard Analysis Operating Procedures Training Pre-start Up Safety Review 1124 Mechanical Integrity Hot Work Permit 268 Management of Change 1157 Incident Investigation 1113 Emergency Planning and Response Compliance Audits 112 Contractors 167 Trade Secrets 0

OSHA Violation and Routine Audit Common Finding PSM ElementFinding Employee ParticipationWritten Plan/Consulting with Employees Process Safety Information Documenting Equipment Complies with RAGAGEP (recognized and generally accepted good engineering practices) Process Hazard AnalysisEstablished system for addressing findings and recommendations Operating ProceduresDeveloping and implementing operating procedures/Procedure reviews TrainingTraining in the process and operating procedures

GOLDEN GEARS POWERPOINT TEMPLATE PSM Element (cont.)Finding Hot Work PermitDates, Equipment, a Management of ChangeEstablish and Implement written procedures to manage change Incident InvestigationInvestigate each incident which resulted OR COULD HAVE RESULTED Emergency Planning and Response Establish and Implement an Emergency Action Plan (EAP) IAW Compliance AuditsCertify, Report, Document Reponses Pre-startup Safety ReviewsPHA performed and findings resolved before startup Mechanical IntegrityInspection and Testing shall be performed OSHA VIOLATION AND ROUTINE AUDIT FINDING ( CONT. )

Necessities for Successful Audits /Assessments Management Support Site Support Program Documentation Program Implementation

Necessities for Successful Audits /Assessments Management Support Management-Driven Program Long-Term Support Corporate and Site Support

Necessities for Successful Audits /Assessments Management Support PSM is a Management-Driven Program Top-Down influence and implementation Dedicated Resources, both personnel and financial Long-Term Support PSM is a permanent body of regulation PSM program impact must be integrated to Cost/Earnings Forecasts A timetable of years, not business quarters Corporate and Site Support Support must come from all levels If a layer of support is missing, program will fail A successful program is one factor of site viability

Necessities for Successful Audits /Assessments Site Support Organization at the Site Personnel Requirements (Technical/Operations/Clerical)

Necessities for Successful Audits /Assessments Site Support (“Moderate” Size; 300 People; 3 Processes) Site PSM-Programs Manager Site Champions for Each PSM Element (14 Element Model) Process Area Champions for Each Element (14 Element Model)

Necessities for Successful Audits /Assessments Site Support Site Champions for Each Element 14 Elements = 14 Champions (can vary per site size) Calculate the Personnel Needed (“Moderate” sized plant-site): (14 Elements) X (1 Person/2 Elements) X (0.25 Fraction of Person’s Time) = 1.75 Persons as Site Champions Call it “2 People” Typically Technical/Salaried Personnel Include technical and administrative requirements

Necessities for Successful Audits /Assessments Site Support Process Area Champions for Each Element Typically salaried personnel Skills driven by technical needs of the element Calculation of personnel is similar Assume three (3) process areas on-site One person handles several elements in less-demanding areas Calculate the personnel needed (“Moderate” sized plant-site): (14 Elements) X (1 Pers/2 Elem) X (0.1 Fraction of Person’s Time) X (3 Process Areas) = 2.1 Persons as Process Area Champion Call it “2 People”

Necessities for Successful Audits /Assessments Site Support (“Moderate” Size; 300 People; 3 Processes) Site PSM-Programs Support Personnel (Eng. Dept) “Reliability Engineer” Calculate the personnel needed (“Moderate” sized plant-site): (1 Person) X (0.25 Fraction of Person’s Time) X (3 Process Areas) = 0.75 Persons as Reliability Engineer Call it “1 Person” Process Area PSM-Programs Support Personnel (Tech. Eng.) “Process Engineer” Calculate the personnel needed (“Moderate” sized plant-site): (1 Person) X (0.25 Fraction of Person’s Time) X (3 Process Areas) = 0.75 Persons as Reliability Engineer Call it “1 Person”

Necessities for Successful Audits /Assessments Site Support (“Moderate” Size; 300 People; 3 Processes) Summary of Personnel Needs for PSM Programs 1 each – Site Programs Manager 2 each, equivalent – Site Element Champions 2 each, equivalent – Process Area Element Champions 1 each, equivalent – Site Engineering - Support 1 each, equivalent – Process Area Engineering – Support Above is for a long-term, continuing PSM program Approximately 1.5 dedicated persons for every $100 Million of Replacement Investment.

Necessities for Successful Audits /Assessments Program Documentation Specificity and a Requirement Goal: to provide a comprehensive audit trail so government regulators may feel assured that the facility is operating “Safely”.

Necessities for Successful Audits /Assessments Program Documentation Specificity and a Requirement Audit Trail Sampling… Technology: Documented PSI; Updated PHAs; Management of Change documents. Facilities: Operating Procedures; PSSRs; MI; QA. Personnel: Site governance documents, all elements; Contractor Safety Programs; Position Qualification Training Programs and Records; Self-auditing programs and protocols; Incident Investigations, records and analysis. Employees will be interviewed during a third-party audit.

Necessities for Successful Audits /Assessments Program Documentation Each regulatory reference requires some type of information This information must be captured by some type of form or information system The employer must maintain documentation and an audit trail that shows employer compliance with the various regulatory references Third-party auditors go directly to this audit trail to determine compliance Verbal comments and discussions do not constitute an audit trail; documents must be presented to verify an audit trail

Training of Co-Managed Elements All contract partners are affected Facility - maintain audit trail for contractors Contractor requirements can be audited Involvement of Workforce Employee PSM records will be audited Training records Certificates (Example – Welding Qualifications) Employees will be interviewed during an audit Evidence of employee involvement in PSM program Necessities for Successful Audits /Assessments Program Implementation

Questions?? 1.Audits/Assessments 2.Violations of the OSHA Standard , Process Safety Management. 3.Audit/Assessment Findings 4.Necessities for Successful Audits/Assessments PSM Audit Occurrences