Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy 20-20 Strategy Plan.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Enhancing Scientific Cooperation between the European Union and Central America Funded by the European Commission's Directorate-General for Research -
Dr. Bader Eddin Al-Majali
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Renewable Energy Program in Jordan
Chinmay Das,ABIT,Cuttack Non-Conventional Energy Sources.
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
Renewable Energy in Islamic Republic Of Iran
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Renewable Energy in Libya ( The Future Prospectives ) Wednesday 28 th of March 2012 Amman, Jordan Eng. Mohamed R.Zaroug Renewable Energy Authority of Libya.
Renewable Energy Program Arab Union for Electricity
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
NovEnergia II Technical Bureau - Sep08 THE OPPORTUNITIES OF HUNGARIAN WIND ENERGY Álvaro Rodrigues September 2008.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Egyptian Renewable Energy Activities and Strategy
Biomethane Roadmap in Hungary Wien, AGCS AG, February 27, 2015 Kornél L. Kovács Hungarian Biogas Association.
Special Report on Renewable Energy Sources and Climate Change Mitigation IPCC WORKING GROUP 3.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
1 Energy Sector Development in Montenegro: reforms, goals and overall strategy Government of Montenegro Ministry of Economy 6 November 2009, Podgorica.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
Energy Policy and Planning Office The Energy Conservation Promotion Fund for Developing RE Projects in Thailand Pinnara Premcharoen Policy and Plan Analyst.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
Investment, Technology Transfer and Climate Change Case Study: Wind Power in Egypt Peter Wooders, Senior Economist Climate Change, Energy and Trade Mohamed.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Dr. Sombat Teekasap The Chairman of Renewable Energy Industry Club The Federation of Thai Industries Website:
Li Junfeng APEC Renewable Energy Expert Group Meeting October 13 to 15, 2003 Shanghai China CHINA’S Renewable Energy Industrial Development Strategy.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Promoting Renewable Energies – in Germany and worldwide Dr. Karsten Sach at Eco Cities of the Mediterranean Forum 2008 October 20, 2008.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
El Gallo Hydroelectricity Project PDD Analysis
Global Environment Facility Climate Change 14 May 2004 Siv Tokle GEF Monitoring and Evaluation Unit.
Africa Talks Lucas Hautvast, CEO & President
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
E gypt E ra Electricity Market Reform and Their Relation with the Development of Renewable Energy Market in Egypt.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Renewable Heat Incentive Andrej Miller RHI team Department of Energy and Climate Change.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Energy Efficiency in the Building Sector in Egypt
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Opportunities for renewable energy investments in Serbia
Kenya’s INDC: Actions in the Energy Sector
By Joseph Al Assad Advisor Ministry of Energy and Water
Template for country interventions (5 min)
Egypt’s Electricity Subsidy Removal and the Unified Electricity Law; Paving the Way for Renewables SME Growth.
Khuzestan Regional Electric Company
Highlights of the Ethiopian Energy Sector
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Energy transition in Uruguay
“Projects and Impementation of Renewable Energy „
Oregon Energy Plan As of April 2005.
The Potential of Renewable Energy in Libya
Presentation transcript:

Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan

Potential of Electricity Generation from Renewable Energy Sources in Egypt  Egypt is a rich country with renewable sources which can be used for power generation on commercial scale. These sources include; wind, solar and biomass  Atlases for both wind and solar energies have been already developed  Two third of the country area has a solar energy intensity more than 6.4 kWh/m2 day (an annual global solar insolation of 2300 kWh/m2 year)  In some areas especially on the red sea cost the wind speed approaches 10 m/sec or even higher

Potential of Renewable Resources in Egypt

Renewable Energy Strategy  According to the Wind Atlas in Egypt published by NAREA in cooperation with the National Laboratory RESO (Denmark) major areas with sufficient wind energy resources have been identified these areas include:  Gulf of Suez area-Class 1 at the height of 50 m above ground level is between 400 and 800 W/m²- wind speed (> 9 m/s)  Western Egypt Domain at the west bank of the Nile-Class 1 at the height of 50 m above ground level is between 300 and 400 W/m² - wind speed (7-8 m/s)  Areas close to Kharga -Class 1 at the height of 50 m above ground level is between 300 and 400 W/m² -with wind speed (7-8 m/s)  Eastern Egypt domain at the east bank of the Nile-Class 1 at the height of 50 m above ground level is approx. 300 W/m² -wind speed (6- 7 m/s)  Gulf of Aqaba area Class 1 at the height of 50 m above ground level is between 400 and 600 W/m². (national reserve so restricted site)  Most of the sites where high wind speed exists fill into state own lands

Wind Atlas of Egypt and Areas of High Wind Energy Proposed Area Kharga Proposed Area east Nile Proposed Area west Nile Proposed Area at Gulf of Suez

Wind Speeds at Gulf of Suez Source: NREA and Risø National Laboratory (DK): Wind Atlas for Egypt. December 2005

Main Features of Wind Energy in Egypt  Main features of wind energy in Egypt:  High wind speed resources but concentrated in some areas  Most of the sites with high wind speed or in remote areas

Energy from Biomass  Power generation from the gasification of sewage sludge in waste water treatment plants (EL- Gabal El-Asfer 23 MW plant) is already been used  High potentials projects for power generation based on gasification or direct combustion of organic solid wastes or agricultural wastes are under considerations  A potential of 1000 MW could be generated from agriculture waste

Barriers for Promoting Renewable Energy Suppliers  Most of the renewable power sources are not competitive in price with electricity produced from fossil fuels in Egypt  This is attributed on one hand to electricity subsidy and on the other hand to the intensive capital cost of these projects, since the equipment needed is not locally manufactured  Most renewable sources have low power intensity which requires the power system, which is current structured on the centralized plants, to adopt the concept of distributed generation

Renewable Energy Strategy  In February 2008 the supreme council of energy has set a target to have 20% of the electrical energy mix from renewable sources including hydro by the year 2020  The current hydro installed capacity represents 12% this will become 8% by the year 2020  This means that 12% contribution from renewable source other than hydro need to be added by 2020.

Renewable Energy Strategy  Solar  Wait and See for the local implementations  Pilot implementations (e.g. Korimatte solar thermal)  Rely on regional co-operation MSP (Mediterranean Solar Plan)

Renewable Energy Strategy  Biomass  1000 MW potential primarily from  Agricultural waste  Garbage  Municipalities  Cooperation with Ministry of Environment and municipalities

Renewable Energy Strategy  Geothermal  Assessment and identifying potential  Hydro  Mini and Micro plants with total capacity less than 100 MW (not including Katarah depression).  This will be done in cooperation with the ministry of irrigation

Justification for Relaying of Wind The Set Target of will be Met by Relying Primarily on Wind Resources. Electricity generated from wind resources represent a near reach opportunities where it has the closest price to electricity generated from oil and gas. Considering the available wind speed and capacity factor, the set target is equivalent to 7200 MW

Renewable Energy Strategy  New electricity law has adopted three mechanisms for power generation from renewable sources these mechanisms are:  Plants built by NAREA  Plants built through Competitive bidding  Plants built through the Feed in Tariff

Energy Development Business Models Feed-In-TariffCompetitive BiddingNAREAItem Medium & SmallLarge Project size Private (focus on local) Private (most probably international)NAREADeveloper Commercial finance Governmental and soft financing from international development agenciesfinances proposed by Egypt era and approved by cabinet of ministers According to the bid outcome Proposed by Egypt era and approved by the cabinet of ministersTariff Setting 15 years Long term PPA mostly for 20 years20 yearsContracting Grid or distribution systemGridOff taker Developer NAREAO/M Developer NAREA through EPC Construction Responsibil ity

NAREA Share in the Plan  Projects in the pipelines till MW, by 2014 NAREA will reach 1270 MW)  Current installed capacity is 310 MW  There is a plan to add another 200MW every year ( ) to reach 2200 MW of a total installed capacity owned  Added capacity after 2014 will developed either through the current business model, which relies on soft financing or through partnership with other governmental companies

 Plan:  2500 MW to be executed by private sector through long term power purchase agreement with the grid  The 2500 MW will be issued in blocks each of which of 250 MW  The program will include 5 bids each will consists of more than one block except the first one which will be restricted to one block.  Attract highly qualified international developer with strong financial status and high capacity for technology transfer.  Promotion of local manufacturing where bid evaluation will be based on points system which offers advantages for proposal having higher share of locally manufacture components (technology Transfer). Competitive Bidding

The bidding process consists of two Phases  Phase1: Pre-Qualifications based on experience and financial status (1-Year Period)  Wind measurements  Bird Migrations & environmental impact assessment  Soil testing  Phase2: Short listed bidders submit proposals to construct, own and operate the wind plant  By the year 2017 the last tender for achieving the targeted energy by the year 2020

Feed in Tariff  Goal is to reach another 2500 MW  Support medium and small developer  Projects with capacities of 50MW and less  Tariff will be set for 15 years taking into consideration the wind speed, and capacity  Request for technical support

Thank You