Brandi M. Carrier Archaeologist Office of Renewable Energy Programs Port Modifications and their Consequences “In an industry where.

Slides:



Advertisements
Similar presentations
Eastern Virginia Airport I. Introduction The Eastern Virginia Airport System Study (EVASS) was an analysis designed to help the Commonwealth identify a.
Advertisements

The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
Overview of the Environmental Assessment for Lease Issuance and Site Assessment Activities off Rhode Island and Massachusetts July 16-17, 2012July 16-17,
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Multi-Sector Ocean Use: Traditional and Alternative Energy MAFAC Meeting May 13, 2009.
Environmental Assessment of Marine Renewable Energy Presentation to Pre-BIC meeting 24 th June 2010 Andrew Casebow Chris Green.
Integrated Ecosystem Assessment for the Gulf of Mexico Becky Allee Gulf Coast Services Center.
Agenda  Surging wind industry  Land-based wind in Maryland  Offshore wind  Policies – federal and state  MD’s Climate Action Plan  40% clean electricity.
Solutions for Flaring & Venting CNG Marine Transportation
Barrage or What? Social & Economic Impacts. Cardiff-Weston Barrage: Estimated construction cost: £20.9bn Gross value-added over 40 years: £1.6 billion-£4.8.
SW England testbed opportunities for marine renewable energy & offshore engineering Prof Martin J Attrill Director, Plymouth University Marine Institute.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Anthropogenic Noise from Offshore Wind Farm Construction Background A key element of the UK plan for the delivery of renewable energy.
THE VULNERABILITY OF GULF OF MEXICO SHIPYARDS TO COASTAL FLOODING AS A RESULT OF STORM SURGE By Capt. Christopher Bowman.
Claire Gibson, Wave Hub General Manager 19 February 2013
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Office of Renewable Energy Programs NAC-CESU Annual Meeting June 12, 2013 Mary C. Boatman, Ph.D. Environmental Studies Chief.
Offshore Wind Update Massachusetts Wind Working Group Nils Bolgen May 28, 2014.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
Design Phase Coordination and the Regional Environmental Coordinator’s Role.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Renewable Ressources in Mecklenburg- Western Pomerania.
= Yr NG price high point Data Source - AFDC. Natural gas prices historically have remained, in general, below crude oil prices, except during the winter.
1.  Offshore Siting Process / Guidelines – Macro View  Offshore Siting Example – VA  Offshore Development Example – VA Virginia Offshore Wind Technology.
1 Bureau of Ocean Energy Management Assessing Historic Properties and Cultural Resources in the Main Hawaiian Islands Dave Ball, MA, RPA Pacific Region.
1 DOE Office of Natural Gas and Petroleum Technology Overview of Environmental Program Retroactive Metrics Analysis July 2000.
Economic Productivity of the Working Coast Louisiana’s coast is a tremendously productive region ecologically and economically Variety of separate studies.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
MMS Alternative Energy Program November 28, 2007.
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Kirk LaGory North Aleutian Basin Information Status and Research.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Fish and Fisheries Working Group John Hayse North Aleutian.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
EWEC 2006, Athens1Jan Rispens Wind Energy Agency Bremerhaven/Bremen (Bild: Enron Wind) The WAB Industry Network in Northwest-Germany Profile and R&D-Activities.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
Decision making exercise
GBT - part of Econcern’s Wind Holding BV - works closely with Darwind BV and Steelworks BV. GBT forms an essential part of the value chain that will provide.
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Long Island’s Offshore Wind Farm David Tobias Project Evaluation.
Offshore Wind Energy in the region – EMDEN (Germany)
A Presentation By Student Ocean Advocates. The New York/New Jersey Bight: Our Little Sea in the Big Ocean The NY/NJ Bight NY/NJ Bight - Waters from Montauk.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Every state in the nation benefits from wind energy.
New York Intergovernmental Renewable Energy Task Force Garden City, New York April 28, 2016.
North Coast Wind Farm Tolano Environmental Consulting.
Isis Johnson Environmental Protection Specialist Bureau of Ocean Energy Management Office of Renewable Energy Programs April 28, 2016.
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
COSA Committee Meeting
Baseline Ecological Study of Wind Turbines at Block Island Wind Farm
COSA Committee Meeting
Barriers and Challenges to Developing Renewable Energy Projects
COSA Committee Meeting
June 22, 2017 Keely M. Hite Social Science Specialist
Renewables Capability Presentation All Energy May 2017
COSA Committee Meeting
Economic Impact Assessment Rosignano LNG Terminal
Industrial Power Sails for Ocean Shipping
Offshore Wind Energy Development – Technical Challenges
Bureau of Ocean Energy Management
COSA Committee Meeting
Social & Economic Impacts
NWF & Offshore Wind Power
Socio-economic impacts of Offshore Wind Farm (OWF)
U.S./European Cost Comparison Study Preliminary Results
Presentation transcript:

Brandi M. Carrier Archaeologist Office of Renewable Energy Programs Port Modifications and their Consequences “In an industry where one port can generate billions of dollars in state and local tax revenues and affect the lives of more than 3 million industry-related employees throughout the U.S., any change is a big deal. – NBC News’ Brad Racino

Information Needs Modifications to Atlantic coast ports, including expansion and changes in operations, may be necessary for offshore commercial wind development. BOEM needs to evaluate environmental and socioeconomic consequences of such modifications. Project-specific Environmental Impact Statements (EIS) will analyze expansions associated with specific developments; the information from this study will support these assessments. Office of Renewable Energy Programs Port Modifications and their Consequences

Background Onshore facilities to support activities on future leases would be located at existing ports near lease areas. Development activities will eventually lead to the expansion of ports to accommodate the size of construction vessels, space required for staging and maneuvering turbines, and cranes capable of handling the weight of the nacelles and other components. Office of Renewable Energy Programs Port Modifications and their Consequences

Background Expansion of port facilities can produce a variety of environmental impacts, such as emissions, expansion into undeveloped areas, vessel-induced wake erosion, increased dredging, and discharges on air and water quality and coastal habitats. In addition, a variety of socioeconomic impacts may occur, such as the increase in employment and changing characteristics and use of a port (i.e. a traditional fishing port changing to a wind energy hub). Office of Renewable Energy Programs Port Modifications and their Consequences

Objectives Synthesize current port capacity and necessary modifications; Discuss environmental and socioeconomic consequences from modifications and alterations to port operations; and Analyze effectiveness of potential mitigations measures. Office of Renewable Energy Programs Port Modifications and their Consequences

Methods Identify ports that can accommodate the types of vessels required for offshore wind development; Refine the list based on existing proposals, state initiatives, and additional characteristics (e.g., distance to WEAs, regional expertise, reinforced quaysides, large staging areas, easy access, and facilities to move foundations); Identify potential modifications that would be necessary to accommodate the activities associated with offshore wind energy facility construction; Office of Renewable Energy Programs Port Modifications and their Consequences

Methods Extrapolate environmental and socioeconomic consequences from analyses of similar, world wide port improvements and expansions; air and water quality, and coastal habitats; land use changes, environmental justice issues, population changes, and strain on existing infrastructure, such as traffic congestion; Describe cumulative impacts of modifications and effective mitigation measures. Office of Renewable Energy Programs Port Modifications and their Consequences

Additional Information Example 1: Monopile construction offshore. Port of Harwich, UK. Using DPS self-propelled jackup vessels Video Example 2: Floating turbines constructed at port, towed to lease site, and moored. Port of Lisnave, Portgual. Using drydock construction and tugs to tow to lease site Video Office of Renewable Energy Programs Port Modifications and their Consequences

Additional Information Builds on and expands a study entitled “Energy Market and Infrastructure Information for Evaluating AE Projects,” but focuses exclusively and intensively on port infrastructure. The study will take place in two phases (North Atlantic and Mid-Atlantic) in relation to the progress of leasing activities in that area of the Atlantic OCS. Office of Renewable Energy Programs Port Modifications and their Consequences

Questions and Discussion Office of Renewable Energy Programs Port Modifications and their Consequences