Demonstrating Digital Railway

Slides:



Advertisements
Similar presentations
The RCP Health Research Support Service (HRSS) The approach to transitioning the HRSS Governance Framework : Presentation for the National Information.
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
© 2006 itSMF USA. All rights reserved. ITIL v3 – Familiar Ground, New Territory David Cannon ITSM Practice Principal - HP.
Delivering Digital Services Information Management Theme Presented By: Deborah Cowell, FAA, AIT Date:August 27, 2014.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
Strategic Plan and Annual Performance Plan
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
1.
R A I L T R A C K Presentation to Liability Underwriters Group Conference 4 September 2002 Ian Thompson Head of Insurance & Risk Management Railtrack PLC.
The changing world of Network Rail Simon Kirby, Managing Director Infrastructure Projects.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
1DMG Confidential. Problem #1  Development and maintenance Huge demand for DMG services plus focus on short-term benefits led to shortcuts in code development.
Exploiting the CRM for B2B Marketing Karen Race Deputy Director, Academic Enterprise.
ETCS Level 2 Operational Concept in Austria
1 Delivering a 21 st century railway Anna Walker, Chair, ORR National Rail Conference: Cracking the Capacity Problem, 5 July 2012.
‘How can we make better use of existing rolling stock fleets?’ Tim Burleigh Relationship Development Manager, Eversholt Rail Group ACoRP ‘Radical approaches.
RESTRAIL Final Conference Lessons Learned from WP4 – Mitigation of Consequences Gilad Rafaeli, MTRS3,
Bowel Screening Project Overview Rhys Blake Head of Business and Service Development.
A ‘Plug’ for Electric Vehicles! Sally Herbert Sustainable Travel Officer Newcastle City Council.
IT Infrastructure Management IT Infrastructure Library Best Practice.
Developing the competency of managers in the field of safety management Aidan Nelson Director Policy & Standards International Railway Safety Conference.
High Speed 2 – Rapid Collaborative Project Planning 11 th October 2012.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
Right on Track towards a safe and interoperable Europe? 2 April 2014 Luc Lallemand Vice President EIM CEO Infrabel Belgium Rail Infrastructure Manager.
1DMG Confidential. Problem #1  Scalability Ingest and export processes not able to handle burst traffic loads Exponential growth in storage usage and.
Levers enabling industrialised deployment and a effective multi-vendor eco-system We wish to assess the current position of these levers and the opportunity.
Infrastructure Projects 03 Dec 2015Cost Planning Briefing to Commercial Directors Forum1 Cost Planning Improvement Plan Awareness Briefing to Commercial.
/18-Feb-161 Response of Surface Access Providers – Network Rail Chris Rowley, Principal Strategic Planner (L&SE)
Valerie Briggs Team Lead, Knowledge Transfer and Policy ITS Joint Program Office, USDOT April 10, 2013 Inputs to USDOT’s ITS Strategic Research Plan,
EU Cybersecurity Strategy and Proposal for Directive on network and information security (NIS) {JOIN(2013) 1 final} {COM(2013) 48 final} Digital Enlightenment.
Department of Transport Joint Budget Committee Hearings Medium Term Budget Policy Statement 2005 Theme 3: Employment and Economic Development 1 November.
C4IT S ERVICE C ENTER 2016 Industry Day C4IT Service Center CAPT David Dermenalian March 8, 2016.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
Simon Amor Asset Development Manager
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Developing the Commercial Strategy in Partnership with Suppliers Phil Bennett & Rebecca Shepherd.
Programme Update since April 2015 Martin Arter | Digital Railway Development Director Suppliers’ Summer Conference 15/07/2015.
The MOST project How have we changed the business model? 12 December 2012 Andrew McIntosh, Tunstall Healthcare Adam Steventon, Nuffield Trust.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
Making Space for Water Risk Mapping: Coastal Erosion Tuesday 17th October 2006 Geoff Astle Senior Project Manager Environment Agency.
It’s looking good: the emerging case for Digital Railway Martin Arter Programme Development Director Digital Railway Supplier’s Conference 20 November.
How Digital Railway is a key part of the Rail Delivery Group strategy Paul Plummer Chief Executive Rail Delivery Group.
Building Business Transformation Capabilities Our perspective on the building blocks, structure and critical success factors to impact change Gillian.
Workforce Repository & Planning Tool
ServiceNow Business Offerings
The Freight RUS - a draft for consultation
Current status of Shift2Rail
Ground System implication for ASAS implementation
EOB Methodology Overview
Key Information Summary (KIS)
Initial Strategic Business Plan July 2006
A paradigm shift in how we operate the railway
Danish Onboard ERTMS Implementation
Pete Glass – Head of Performance Strategy (EMT)
Trust and Security Unit
East Coast Route Study November 2016 update.
Signalling – for the next generation
CP6 and Growing the supply chain
SPECTRUM STRATEGY & VISION
Xoserve IX Refresh Customer Update 30/10/2018.
Building Capacity for Quality Improvement A National Approach
Status Report of the SPRWG of the Council
Pete Glass – Head of Performance Strategy (EMT)
OFFICIAL Data Analytics and AI Centre of Expertise 17th September 2019.
Presentation transcript:

Demonstrating Digital Railway Dave Palmer Industry Lead (Rail Infrastructure) Patrick Gallagher Phase 2 Lead

Digital Railway: phased transformation Current Delivery Projects PHASE 1: Strategic pilots, tactical deployments & future enablers PHASE 2: Technology integration and roll out PHASE 3: Optional enhancement 1 2 3 L2 National Roll Out Optional L3 Upgrade Strategic delivery projects CP5 tactical deployments Enabling projects Toolkits enabling repeatable, scalable national rollout to double the pace of change Option for further digital acceleration to L3 and additional enhancements TM trial: Romford & Wales Thameslink: Integrated ETCS & TM First in Class: c.50 classes passenger & freight plus OTM ETCS Level 2: Paddington - Heathrow

Phase 1: RIDC Melton test track Cambrian ETCS Hertford test loop GWR 0-12 miles (Crossrail) Romford Traffic Management Thameslink overlay First in Class Wales Traffic Management Wessex CDAS

Phase 1 - Delivery Tactical solutions, early deployment of traffic management, initial cab fitment and some limited ETCS deployment Thameslink: Integrated ETCS & TM First in Class: approx 20 classes ETCS Level 2: Paddington - Heathrow TM trial: Romford & Wales Industry stakeholder engagement Business change activity

“The Phase 2 Digital railway Configuration” We are are creating a common “Toolkit” “The Phase 2 Digital railway Configuration” Data: Systems & standards Operating processes & procedures People: - Culture Change - Org Design - Competencies - Training - Simulation Safety Regulations Network Code Security & Cyber-security Programme mgt & Business Change Costs Benefits GSM-R ETCS C-DAS TM COMPASS FTNx Implementation standards, templates, specifications, commissioning …

Demonstrating Digital Railway : Norwich – Yarmouth – Lowestoft Will take Digital Railway a step beyond early testing at Thameslink and Cambrian line during CP5. First time ETCS Level 2 and Traffic Management will be integrated based on Phase 2 systems architecture. Final approval April 2016 Target completion March 2019 The site is: Representative of the wider network Renewal required in CP5 Linked to Rail Operating Centre (ROC) with full rollout early in programme sequence Manageable fleet fitment/driver training Operationally low risk The deployment will demonstrate and prove: That the different systems can be integrated The business change required to implement the national toolkit The capability and business benefits; The assumptions made in the business case including cost The change can be made to minimise performance disruption

NYL Delivery Configuration Drop A Configuration Drop B ETCS L2, controlled from Romford, system integration, asset recovery, telecoms upgrade, level crossing upgrade, business change including organisational change. Configuration Drop A Minimum scope required for Digital operational solution to enable asset renewal and signaller release Required by October 2018 As per “A” plus Traffic Management, Connected Driver Advisory System (C-DAS), Data Reporting Analysis and Corrective Action System (DRACAS), telecoms upgrade (packet switching), fully bi-directional, LINX. Configuration Drop B Minimum scope required to demonstrate Digital Railway National Toolkit Required by March 2019 As per “A” + “B” and additional decision support tools, (stock and crew, incident management), Combined Positioning Alternative Signalling System (COMPASS). Configuration Drop C Minimum National Toolkit demonstration achievable on NYL Required by December 2019

Collaborative Development and Delivery Team DRAFT