Multipurpose Reservoirs and Reservoir Systems David Rosenberg CEE 6490 – Integrated River Basin / Watershed Planning & Management.

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Water Management Section, Sacramento District, US Army Corps of Engineers Climate Impacts on Reservoir Rule Curves Stu Townsley Chief, Water Management.
HEC-ResSim Enhancements
CVEN 5838 Aug 28, 2008 Lecture 2 Reservoir Capacity Yield Analysis (how to size a reservoir and measure its performance)
Water Resources Planning and Management Daene C. McKinney River Basin Modeling.
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Multipurpose Water Resource Systems
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
1 Real Time Flood Forecasting for the Willamette Basin using HEC-CWMS / ResSim Modeling Real Time Flood Forecasting for the Willamette.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Deksyos Tarekegn National DSS Specialist - Ethiopia
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Sept 2, 2008CVEN 4838/5838Slide #1 Lecture 3 Flood Control and Operating Criteria.
Hydro Power 102. Hydroelectric Models in the Northwest.
Potential Effects of Climate Change on New York City Water Supply Quantity and Quality: An Integrated Modeling Approach Donald Pierson, Elliot Schneiderman.
1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority.
A MANAGEMENT SYSTEM FOR OPTIMIZING OPERATING RULES OF MULTIPURPOSE RESERVOIRS ALLOWING FOR BOTH EXTREME FLOODS AND ECOLOGICAL PERFORMANCE 4 th International.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting March.
James VanShaar Riverside Technology, inc
Modeling Development CRFS—Technical Meeting November 14, 2012.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
Integrating tools to scope coordinated reservoir-floodplain management for climate resilience Jeff Opperman and Andy Warner, The Nature Conservancy.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Multiple Purpose Dam & Reservoir
YCWA Flood Management for Relicensing 9/24/14 9/24/20141.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
OASIS Basics Computer Aided Negotiations of Water Resources Disputes.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Water Resources Planning and Management
Multi-objective Optimization
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Model Overview Application of CALSIM II to Friant System.
Linear Programming and Applications
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Water Resources Planning and Management Daene C. McKinney Multipurpose Water Resource Systems.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Hydroelectric Generation CEE 6490 David Rosenberg.
Design Reservoir Water- Management Data Model By: Adel M. Abdallah Instructors: David Rosenberg and Dr. Jeff Horsburgh Oct. 16, 2012 Hydroinformatics,
Reclamation and Hoover Dam It’s All About The Water.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Guide Curve Operations Partition reservoir storage into “pools” Each pool has a separate purpose Release (or avoid releasing) water to reach the “guide.
WaM-DaM: A Data Model to Synthesize and Organize Water Management Data 1 EWRI CONGRESS June 4, 2014 Adel M. Abdallah David E. Rosenberg.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Hydroelectric Generation CEE 6490 David Rosenberg.
River Basin Simulation with WEAP Water Evaluation and Planning System David Rosenberg NRM + IWRM.
River Basin Simulation with WEAP Water Evaluation and Planning System David Rosenberg CEE 5460 – Water Resources Engineering.
HEC-ResSim 3.3 New Features to Support Complex Studies
Ten Reasons to Use South Carolina’s Surface Water Quantity Models
River Basin Simulation with WEAP Water Evaluation and Planning System
03/02/2006 Flow Routing Reading: 8.1, 8.4, 9.1, 9.2.
Multipurpose Reservoirs and Reservoir Systems
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Integrating tools to scope coordinated reservoir-floodplain management
Presentation transcript:

Multipurpose Reservoirs and Reservoir Systems David Rosenberg CEE 6490 – Integrated River Basin / Watershed Planning & Management

Learning Objectives Diagram multi-purpose operations for a single reservoir Describe rules of thumb for drawdown and refill of reservoirs in series Compare rules of thumb for reservoirs in series and in parallel Illustrate use of rules in real reservoir systems Integrate rules into reservoir simulation models 2 Mokelumne River Calaveras River Mokelumne and Calaveras Rivers, CA (Google Earth) CEE 6490

Multi-purpose Reservoir Operations Partition reservoir storage into “pools” Each pool has a separate purpose Release (or avoid releasing) water to reach the “guide curve” CEE 6490David Rosenberg 3 Dead/Inactive pool (no release) Buffer pool (min. in-stream flow releases) Conservation pool (release to meet water supply / hydropower delivery targets) Flood pool (release to empty, but don’t flood downstream areas) Surcharge pool (emergency spillway releases) Top of dam Guide Curve

Seasonal guide-curve CEE 6490David Rosenberg 4 1, Storage in thousand acre-feet Contours are preceding 60-day basin-mean precip. (% of normal annual precip.) Release all excess storage above line as rapidly as possible, subject to: –Do not exceed 50,000 cfs or maximum rate of inflow for flood event –Do not exceed 150,000 cfs at any time –Flows in a downstream damage reach do not exceed 180,000 cfs (HEC, 1976)

Example 1. How to consider guide-curve operation in SLOP? CEE 6490David Rosenberg 5 Review Google Sheet with worked example from prior classGoogle Sheet Break into teams of two Duplicate the Master worksheet Modify your copy to include guide-curve operation. The guide curve is at 190 units (60 units for flood protection). (You will also need to do this to complete ILO-4)

Compare Operations Objectives * Releases to achieve objective depend on spatial configuration CEE 6490David Rosenberg 6 Purpose Single ReservoirReservoir System Water Supply Keep reservoir full; avoid spills; meet demands Avoid system spills* Flood Control Keep reservoir empty; avoid damaging releases Avoid damaging releases* Energy Storage Keep reservoir full + high head Max. total energy stored at end of refill season* Hydropower Production Keep reservoir full; meet energy demands Max. value of energy production* Recreation - Pool Keep reservoir fullEqualize marginal rec. benefits of additional water

Rules of Thumb Rules differ for different –Water uses –Spatial configurations 7 inflow release/spill Reservoirs in Series: inflow release/spill inflow release/spill Reservoirs in Parallel: CEE 6490

Operations Rules for Reservoirs in Series 8 PurposeRefill PeriodDrawdown Period Water SupplyFill upper reservoirs first Empty lower reservoirs first Flood ControlFill upper reservoirs first Empty lower reservoirs first Energy StorageFill upper reservoirs first Empty lower reservoirs first Hydropower Production Maximize storage in reservoirs with greatest energy production potential RecreationEqualize marginal recreational improvement of additional storage among reservoirs CEE 6490

Operations Rules for Reservoirs in Parallel 9 PurposeRefill PeriodDrawdown Period Water SupplyEqualize probability of seasonal spill among reservoirs Equalize probability of emptying among reservoirs Flood ControlLeave more storage space in reservoirs subject to flooding NA Energy Storage Equalize expected value (EV) of seasonal energy spill among reservoirs For the last time-step, equalize EV of refill season energy spill among reservoirs Hydropower Production Maximize storage in reservoirs with greatest energy production potential RecreationEqualize marginal recreation improvement of additional storage among reservoirs

Example 2. Illustrations Break into groups of two Select a reservoir system (next slides) Describe system and recommend operations for the specified water use in the Google DocGoogle Doc

A. Porcupine and Hyrum Reservoirs on the Little Bear River, UT Operating for water supply in South Cache Valley CEE 6490David Rosenberg 11

B. Smith & Morehouse, Rockport, and Echo Reservoirs, Weber Basin Operating for water supply on the Gateway Canal CEE 6490David Rosenberg 12 UDWR (2008), Hi-ResHi-Res

C. Echo and Pineview Reservoirs, Weber Basin Operating for the Ogden Bird Refuge CEE 6490David Rosenberg 13 UDWR (2008), Hi-ResHi-Res

D. Pineview and Willard Bay Reservoirs, Weber Basin Operating for the Slaterville Diversion and Warren Canal CEE 6490David Rosenberg 14 UDWR (2008), Hi-ResHi-Res

E. Mountain Dell and Little Dell Reservoirs: water supply for SLC Goharian and Burian (2014), Hi-Res Hi-Res

F. Upper Stillwater, Currant Creek, and Strawberry Reservoirs, Bonneville Unit CEE 6490David Rosenberg 16 Operating for water supply at Utah Lake Central Utah Water Conservancy District, Hi-ResHi-Res

Application Feather-Yuba River System, California

2 parallel reservoirs 4.8 MAF storage (90% of mean annual flow) Drains 4,100 mi 2 within larger 27,000 mi 2 of Sacramento River Basin 3 rd Marysville reservoir authorized, but never built Flood protection, Water supply, Hydropower, Recreation, In-stream flows Feather and Yuba Rivers, CA (Rosenberg, 2003) 18

Feather and Yuba Rivers, CA Schematic David Rosenberg 19 CEE 6490

Feather and Yuba Rivers, CA Analysis Method 1.Build Reservoir Simulation Models –HEC-ResSim for flood operations Synthetic storms, various return periods, hourly time-step –HEC-5 for water supply, hydropower and in-stream flow requirements Period-of-record of inflows, monthly time-step 2.Specify performance objectives (more next slide) 3.Simulate project alternatives –Base case (existing) –Storage reallocations (raise and lower guide curves) –Re-operate for lower downstream flood flow requirements 4.Select preferable alternative(s) David Rosenberg 20 CEE 6490

Feather and Yuba Rivers, CA Performance Indicators Objective flow criteria met? At… –Oroville, New Bullard’s Bar –Yuba City, Marysville –Feather + Yuba Confluence, Nicolaus Expected Annual Flood Damage ($) –Simulate for likely events (little water) and unlikely events (lots of water) –Calculate damage for each event based on flows at downstream impact areas (HEC-FIA) –Weight by event likelihood and damage amount –Annualize to $ amount people pay every year Reliability, Vulnerability, and Resilience to meet water supply demand (%) David Rosenberg 21 CEE 6490

Expected Annual Damages for Oroville & New Bullard’s Bar Storage Reallocations

Expected Annual Damage for Reservoir Re-Operations Alternatives

Feather and Yuba Rivers, CA Conclusions Storage reallocations have small influence on EAD Lowering flow objective to 270,000 cfs at Feather-Yuba confluence is most promising re-operation alternative Up to 200 TAF storage in Oroville serves little additional flood protection purpose Oroville reallocations have greater EAD reduction benefit than New Bullard’s Bar reallocations EAD extremely sensitive to flow at Marysville, Natomas, and levee failure stage at Natomas Difficult to operate for Nicolaus (Rosenberg, 2003) David Rosenberg 24 CEE 6490

Integrating concepts into reservoir simulation models

Reservoir Simulation Modeling Data Requirements For WEAP, HEC-ResSim, HEC-5, Oasis, RiverWare, etc. Time-series of inflows Spatial configuration of inflows Routing between model nodes Reservoir locations and –Physical data: pool elevation-storage-area curves, evaporation and leak rates –Dam outlets: elevation-release capacity curves Operations –Zones: elevations –Release rules and prioritization in each zone 26CEE 6490

Reservoir Simulation Modeling Computational Requirements Time step Method to calculate change in storage –Finite difference –Modified Puls (level pool) –Are inflows, releases, etc. at beginning of time step or averaged over the time step? Routing –Simple (constant discharge-storage; velocity-based) –Muskingum (variable discharge-storage; attenuation) –Hydraulic (unsteady flows, variable storage; wave and out- of-bank flow) 27CEE 6490

Reservoir Simulation Modeling Performance Measures a.Delivery-reliability b.Firm yield c.Max (or min) reservoir storage level d.Max (or min) flows at a particular location e.Hydropower generated f.Costs of shortages g.Economic revenues from (b) or (e) h.Vulnerability i.Resiliency j.And many, many others 28CEE 6490

Conclusions Use zones (pools) to allocate water to different purposes within a single reservoir Simple rules of thumb for operating single-purpose reservoir systems depend on spatial configuration Simulation, optimization, or learning machine models used to determine or test rules in real applications Model type depends on system and operations purpose(s) Numerous performance indicators Joint reservoir operation often beneficial CEE 6490David Rosenberg 29

References Bower, B. T., Hufschmidt, M. M., and Reedy, W. W. (1966). "Operating procedures: their role in the design of water-resource systems by simulation analysis." Design of Water Resource Systems, A. Maass and e. al, eds., Harvard University Press, Hashimoto, T., Stedinger, J. R., and Loucks, D. P. (1982). "Reliability, Resiliency, and Vulnerability Criteria for Water Resource System Performance Evaluation." Water Resources Research, 18(1), Hirsch, R. M., Cohon, J. L., and ReVelle, C. S. (1977). "Gains from joint operation of multiple reservoir systems." Water Resources Research, 13(2), Labadie, J. W. (2004). "Optimal Operation of Multireservoir Systems: State-of-the-Art Review." Journal of Water Resources Planning and Management, 130(2), , Lund, J. R. (2000). "Derived power production and energy drawdown rules for reservoir." Journal of Water Resources Planning and Management-Asce, 126(2), , Lund, J. R., and Ferreira, I. (1996). "Operating Rule Optimization for Missouri River Reservoir System." Journal of Water Resources Planning and Management, 122(4), , CEE 6490David Rosenberg 30

References (cont.) Lund, J. R., and Guzman, J. (1999). "Derived Operating Rules for Reservoirs in Series or in Parallel." Journal of Water Resources Planning and Management, 125(3), , Palmer, R. N., Smith, J. A., Cohon, J. L., and ReVelle, C. S. (1982). "Reservoir management in Potomac River Basin." Journal of Water Resources Planning and Management, 108(1), Paredes, J., and Lund, J. R. (2006). "Refill and drawdown rules for parallel reservoirs: Quantity and quality." Water Resources Management, 20(3), , e51&pi= e51&pi=1 Rosenberg, D. E. (2003). "Simulating Cooperative Flood and Water Supply Operations for two Parallel Reservoirs on the Feather and Yuba Rivers, CA," Masters Thesis, University of California, Davis, Davis, California, Wurbs, R. A. (1993). "Reservoir System Simulation and Optimization Models." Water Resources Planning and Management, 119(4), , Yeh, W. W. G. (1985). "Reservoir Management and Operations Models: A State of the Art Review." Water Resources Research, 21(12), CEE 6490David Rosenberg 31