A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH Atal Mission.

Slides:



Advertisements
Similar presentations
LezkV vkksd m|ku ds v/kwjs dk;ksZa dks iw.kZ djus,oa lezx fodkl lapkyu,oa la/kkj.k ds fy;s ljdkjh,oa futh Hkkxhnkjh ¼ih-ih-ih- eksM½ ;kstuk ij fopkj foekZ.
Advertisements

Questionnaire survey and data acquisition  on Status of Wastewater Management in India R.M.Bhardwaj, Scientist ‘C’ Central Pollution Control Board,
Peco Facet Sewage Water Treatment Plant
Peco Facet Sewage Water Treatment Plant
CONSULTING ENGINEERS LIMITED PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 CIVIL SERVICES, ROADS AND TRANSPORTATION KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT.
PLAN FOR SEPTAGE MANGEMENT UNDER AGARTALA MUNICIPAL COUNCIL BY MILIND RAMTEKE, IAS CHIEF EXECUTIVE OFFICER AGARTALA MUNICIPAL COUNCIL AGARTALA, TRIPURA.
B.ARCH. SEMESTER-II AR 126 BUILDING TECHNOLOGY – P/H UNIVERSITY INSTITUTE OF ARCHITECTURE Scheme of Teaching L T P Total Scheme of Examination.
1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.
STATE OF URBAN WATER SUPPLY & SANITATION SECTOR IN SINDH By Khalid M. Siddiqui DG UP&SP Sindh.
Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Wastewater generation
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Water Issues In India by Vijay Kumar Eppakayala. India on the globe.
DOMESTIC SEWAGE GENERATION, COLLECTION, AND TREATMENT IN CLASS I CITIES Sr. No.WastewaterYear (?)2007 (?) 1Generated, mld7,007 16,27135,558.
Sanitary Engineering.
Gross capacity of the unit is 26 lakh liters of waste water per day It is working at 70% of the installed capacity, treating 15 lakh liters per day There.
GOVERNMENT OF JHARKHAND, DRINKING WATER & SANITATION DEPARTMENT GOVERNMENT OF JHARKHAND, DRINKING WATER & SANITATION DEPARTMENT DEPARTMENTATAGLANCEDEPARTMENTATAGLANCE.
Roman aqueducts and the water and sewage systems By: Shawleace Hill.
September 2005Urban Planning Carleton University 1 Drainage Systems _____________________________.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
Neotech Institute of technology Department of Civil Engineering
“Urja Yatra towards a Focus on Green Power Technologies” “Urja Yatra towards a Focus on Green Power Technologies” Presented By:
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.
6.7 WASTEWATER QUANTITY Wastewater quantity varies hourly, daily and weekly. Peak flow occurs at maximum flow for the day.
21 st Sep Election Process July & August
yksd fuekZ.k foHkkx] dkS”kkEch  { { { {ks=Qy oxZ fdeh0  v v v vkcknh 15]96]909  1 1 1 1 yksd lHkk {ks=] 3 fo/kku lHkk {ks=] 3 rglhy]
E/;izns’k 'kklu] lgdkfjrk foHkkx] e/;izns’k n`f"V i= 2018 ds fØ;kUo;u gsrq 100 fnolh; dk;Z;kstuk 1.
Government of Jharkhand Drinking Water & Sanitation Department 12 th Five Year Plan.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
® Rainer Abendt Dr.- Ing. Rainer-Werner Abendt Nuremberg Contact: Waste Water Workshop in Nairobi 29-th August till 03-rd September.
 Sanitation situation reflects the development of communities.  Health of people is also related to the sanitation situation.  Existing of sewerage.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Alandur Sewerage Project Background: Municipality in Chennai Metropolitan Area Population of around 165,000. Before 1996, town did not have underground.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
LokbZek/kksiqj Hkze.k ds nkSjku ik;s x;s eq[; fcUnq Hkze.kdrkZ %& usgk ikjhd.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
ABOUT US Pioneers in using Green Technologies for waste water and solid waste treatment Started in 2001, based out of Gurgaon.
Welcome to Chokhavatia Associates For over 30 years, Chokhavatia Associates has been delivering world-class, award-winning design solutions with all the.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
NATIONAL RURBAN MISSION NRuM 1 MINISTRY OF RURAL DEVELOPMENT Integrated Cluster Action Plan Step 3b- Component Profiling May 11 th, 2016.
Water Security for Urban India (Water for billion + people….) Arun Lakhani, Chairman Vishvaraj Environement Pvt. Ltd. SUM – Sustainable Urban Water Management.
DjkSyh Hkze.k ds nkSjku ik;s x;s eq[; fcUnq Hkze.kdrkZ %& fot; ;kno¼,e-vks-vk;q"k½.
E-News Letter February NAGAR PARISHAD GANGAPUR CITY Distt. Sawai Madhopur Raj. E-NEW LETTER April
E-News Letter February NAGAR PARISHAD GANGAPUR CITY E-NEW LETTER FEBRUARY
CHITTOOR MUNICIPAL CORPORATION Population forecast 20172,07, ,22, ,60, ,26,000.
Water Management System Review of the Existing System – Sources Intended to be used Bore wells Open Wells Tanker Supply KWA Rain water (??) STP Recycled.
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
Faecal Sludge Management (FSM)
The Assessment of Water Utility's Efficiency in Libya ) Case Study (
Under Sanitation Capacity Platform (SCBP)
LP Examples Wastewater & Water Quality
Electricity is produced at the power station.
Service Costs and their recovery in Urban water and sanitation services: A study of select urban areas in AP Ramakrishna Nallathiga Associate Professor.
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
OVERVIEW & PROGRESS Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore.
Sewerage Disposal for Srinagar City
Baglung Nagar Water Supply and Sanitation Project
2 Days National Workshop on “National Building Code of India 2016 ”
The SWITCH Approach to Integrated Urban Water Management
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH Atal Mission for Rejuvenation and Urban Transformation (AMRUT)

EXISTING WATER SUPPLY  The water supply of Morena was initially started in year  Existing Water supply facility in the town is lastly augmented in year  Source- Tube Wells/Hand Pumps  Present supply level-80 LPCD  The distribution system is also not adequate.  Supply system–Intermittent Supply through SR & direct pumping for 1-2 hours per day  People are getting water from making pits at connection level  Line agency is MCM  Present Production S. No.SourceNo. of Source Discharge (KLH) Pumping Hrs. Daily production 1Tube Wells at various location of Morena Town KLD

Water Demand Morena Town S.No.Description (i) Water supply level(lpcd) as per CPHEEO manual (ii)Population (Total) (iii)Water Dmand (MLD) Present Production (MLD) 13.4 Population Projection Year Projected Population for

Ø dk;Z dk uke izkDd yu jkf”k Lohd `r jkf”k orZeku fLFkfr 1pacy unh ij vk/kkfjr tyiznk; ;kstuk djksM djks M ;kstuk dh Mhihvkj rS;kj gksdj “kklu dks Hksth tk pqdh gSA ve`r ;kstukUrxZr 135 djksM dh Lohd`fr gks pqdh gSA izdj.k esa ou foHkkx ls,uvkslh dh dk;Zokgh gsrq izLrko Hkstk tk pqdk gSA tks fd iz/kku eq[; oulaj{kd ¼oU; izk.kh½ e/;izns”k Hkksiky ds dk;kZy; esa yfEcr gSA izLrko e/;izns'k jkT; oU;izk.kh oksMZ dh vkxkeh cSBd esa fopkFkZ j[kk tkuk izLrkfor gSA Lohd`fr mijkUr izLrko dh Lohd`fr gsrq Hkkjr ljdkj i;kZoj.k] ou,oa tyok;q ifjorZu ea=ky;] ubZ fnYyh dks Hkstk tkosxkA

Chambal river water supply

Water supply line morena town

A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH A Presentation by : MORENA MUNICPAL CORPORATION MORENA, MADHYA PRADESH Atal Mission for Rejuvenation and Urban Transformation (AMRUT)

1lhoj ifj;kstuk djksM djksM Mhihvkj rS;kj gksdj “kklu dks Hksth tk pqdh gSA ve`r ;kstuk esa 125 djksM dh Lohd`fr gks pqdh gSA dk;Z ds Vs.Mj vkeaf=r fd;s x;s gSA fuxe {ks= es cuus okyh lhojst dh ykxr

Existing Sewerage System Presently, there is no sewer system functional in the city. The sewage either drains in roadside drain or people have made soak pit/ soakage well outside their houses. There are thee main nallas in the city viz. nalla no1, 2 and 3 all these nalla carry city effluent and storm. During rainy season the situation become worsen when city effluent containing raw sewage sprawl over roads. Alike sewage system solid waste management system is totally absent in the city. (Stagnated Waste in Talab near Navodaya Colony) (Waste stagnated in Talab near Prem Nagar) (Choked Nalla No-1)

Proposed Project Cost S. No.DescriptionAmount 1PART : "A" Providing, laying, jointing & commissioning of sewer system for Morena including Facility of connection PART-"B" Provision tor Pumping station, Rising Main and Pumping Machineries (Total 7 Nos SPS) 3PART-"C" Construction, Supply, Installation, Testing and Commissioning of Civil, Mechanical, Electrical Works of 30.0 MLD in Ph-I and 40 MLD in PH-II Sewage Treatment Plants including disposal of effluent on Turnkey Basis at Moren 4Power generation Plant for Bio Gas produced at proposed 30 MLD STP for Phase-I. Excluding the 5 year O&M cost Total Estimated Cost (in Lacs) Total Estimated Cost (in Crores)299.60

Zone Drawing of Proposed Sewerage Network Total 26 Zones Proposed in Morena Town