DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor.

Slides:



Advertisements
Similar presentations
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
Advertisements

29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Research Infrastructures in the European Research Area Presentation NuPECC LRP 2010 Brussels, 9 December 2010 Christian Kurrer European Commission, DG.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
EURISOL Transition period MYRRHA and
IRINA KUKLINA, RICHARD BURGER BRUSSELS, 25 NOVEMBER 2014 CO-FUNDING MECHANISMS OF RUSSIAN-EUROPEAN S&T COOPERATION.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Research Infrastructures The Research Infrastructures in FP7.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
1 Framework Programme 7 Guide for Applicants
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
The Preparatory Phase Proposal a first draft to be discussed.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
1 DG RTD-B ERA: Research Programmes and Capacity Research Infrastructures Unit Maria Theofilatou FP7 Community actions Research Infrastructures of Social.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
FINUPHY Instrumentation for radioactive nuclear beam facilities Rauno Julin FINUPHY Madeira, February 9, 2005.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
“European Nuclear Science and Applications Research 2” (ENSAR2)
Atlantic Innovation Fund Round VIII February 5, 2008.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
ATTRACT is a proposal for an EU-funded R&D programme for sensor, imaging and related computing devlopment Its purpose is to demonstrate the value of European.
Maria J. G. Borge 10th November 2015 News of the Group Courtesy of M. Huyse on behalf of IS557.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
EU context (networks & initiatives) and expectations EU context (networks & initiatives) and expectations Michel Viaud and/or Ingrid Weiss EPIA, Brussels,
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
What is ATTRACT? A proposal has been made to the European Commission (EC) for a dedicated EC-funded program to develop new (ionizing) radiation sensor.
AMICI WP1 – Management, coordination and dissemination
Discussions on preparations for future (joint) research projects
for the EURISOL Steering Committee
Session 2 European Regulatory Environment (just a part!)
Spanish Presidency: Priorities in the field of Cohesion Policy
Setting up an ERIC 11 May 2012 Richard Derksen
AMICI WP1 – Management, coordination and dissemination
GPC WG and GPC meeting 5th of June “Future of Joint Programming”
Green Infrastructure: Working method
Presentation transcript:

DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor WG4 “Spectrometers & detectors”

DF 2 LNL-SPES JYL CERN-ISOLDE ALTO-CNRS EURISOL – Distributed Facility (DF) GANIL-SPIRAL2 Members Initially: GANIL-SPIRAL2 HIE-ISOLDE/CERN SPES-INFN Members Initially: GANIL-SPIRAL2 HIE-ISOLDE/CERN SPES-INFN Project to be submitted for the 2018 update of the ESFRI roadmap Candidate - future facility: Smaller scale ISOL facilities: ALTO, JYFL? EURISOL MoU member: COPIN Consortium Poland COPIN

DF Where we want to go? Goals of the EURISOL-DF project: Goals : Prepare strong scientific case for RIB science and applications Support, upgrade, optimize and coordinate ISOL-based European facilities and projects as a necessary step towards EURISOL Foster R&D on RIB production and Instrumentation towards EURISOL Get EURISOL-DF on the ESFRI list as a candidate project by 2018 EURISOL as a single site facility as a long term goal EURISOL – Distributed Facility (DF) Initiative

DF ALTO IN2P3 Where we want to go? EURISOL – Distributed Facility (DF) Initiative EURISOL Science Case & Experiments Dedicated beamtime for EURISOL-DF experiments Dedicated EURISOL-DF Scientific Council & PAC R&D for EURISOL Dedicated Technical Advisory Committee Legal entity (ERIC,…) EURISOL Science Case & Experiments Dedicated beamtime for EURISOL-DF experiments Dedicated EURISOL-DF Scientific Council & PAC R&D for EURISOL Dedicated Technical Advisory Committee Legal entity (ERIC,…) Proposed EURISOL-DF scheme: DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN

DF Methodology (1) Working groups (Science, technical R&D, legal structure,…) 1.Science & applications (together with EURISOL User Group?): Coordinator R. Raabe Define complementarities in programs of each facility Joint meeting of SC of all facilities? 2.Technical R&D – accelerators: Coordinator A. Facco 3.Technical R&D – beam handling, targets and ion sources: Coordinator M. Borge 4.Technical R&D – spectrometers & detectors: Coordinator H. Savajols 5.EURISOL-DF & relationships with ESFRI & EC and its future legal structure: Coordinator: A. Bracco Is ERIC possible/acceptable for all partners? Other legal structures? EURISOL – Distributed Facility (DF) Initiative

DF EURISOL – Distributed Facility (DF) Initiative Tasks of Working Groups Based on the EURISOL-DF context described above and the worldwide international competition, the role of the working groups is to: prepare science & application case of EURISOL-DF propose necessary R&D in the domain of accelerators, RI beam handling, targets and ion sources, spectrometers & detectors to be performed by the EURISOL-DF partners towards EURISOL propose the legal framework for EURISOL-DF and the methodology to ensure a coherent and efficient interaction with ESFRI, NuPECC, European Commission and national ministries and funding agencies. The report of the Working Groups should contain information allowing to prepare the EURISOL-DF proposal to be submitted for the ESFRI roadmap 2018 update following the ESFRI submission Form

DF EURISOL – Distributed Facility (DF) Initiative March 10th 2016, EURISOL SC meeting Trento – WGs Status Draft reports of WG submitted to the EURISOL Steering Committee by April 15 th, 2016 Final reports of WG submitted to the EURISOL Steering Committee by June 1 st, 2016 Deliverables and milestones 1.Presentation of EURISOL-DF and round table session at the EURORIB’15 conference: June 7-12, 2015 in Hohenroda, Germany 2.Reports of the WG by June Draft of the full EURISOL-DF proposal by September EPS Conference dedicated to EURISOL-DF in Autumn Submission of the EURISOL-DF project to ESFRI by March 2017 Schedule of actions for EURISOL-DF proposal:

DF EURISOL – Distributed Facility (DF) Initiative Members

DF EURISOL – DF Helpful Documentation Final report of the Physics&Instrumentation task of EURISOL-NET January 19, 2015 on 7:49 pm | In Eurisol user group news, Physics and Instrumentation, User Group | No Comments The final report of the Physics&Instrumentation task of EURISOL-NET is now available at 5th EURISOL Topical Meeting 2014 “Innovative Instrumentation for EURISOL” December 20, 2013 on 1:53 pm | In Conferences, Eurisol user group news, Physics and Instrumentation, User Executive Committee, User Group | 1 CommentConferencesEurisol user group newsPhysics and InstrumentationUser Executive CommitteeUser Group1 Comment

DF ENSAR 2 JRAs  PASPAG: Particle and gamma detection  PSeGe: AGATA detector + applications  TheoS: Theory of Nuclear Structure & Reactions  RESIST: Resonant ionisation techniques for separators  SATNuRSE: Simulations and analysis tools  EURISOL facility (all stages)  TecHIBA: Stable ion beams + medical isotopes Synergies with ENSAR 2 JRAs

DF EURISOL – DF WG4 – Spectrometer & Detectors WG4.1 : Instrumentation for beam handling Storage rings Separators, spectrometers Traps WG4.2 : Instrumentation for radiation detection Charged particles Gamma-rays Neutrons Electrons WG4.3 : Spectroscopic techniques Electron scattering Fast timing Recoil Decay tagging Ground state properties WG4.4 : Instrumentation technique for Application WG4.5 : Electronics – DAQ - Computing Proposed classification :

DF GANIL/SPIR AL2 MYRRHA ALTOCOPIN JYU… WG4.1 : Instrumentation for beam handling Storage rings Separators, spectrometers VAMOS LISE WF S3 RFQ+HRS- DESIR MR-TOF-MS Traps MLLTRAP PIEPERADE LPC-TRAP … EURISOL – DF WG4 – Spectrometers & Detectors Identification of “innovative” instrumentation for EURISOL Red : Travelling equipments for EURISOL type experiments Blue : In house equipments for EURISOL type experiments

DF GANIL/SPIR AL2 MYRRHA ALTOCOPIN JYUEU WG4.2 : Instrumentation for radiation detection Charged particles ACTAR_TPC GASPARD FAZIA Gamma-rays PARIS EXOGAM2 TAS AGATA Neutrons NEDA MONSTER TETRA Electrons EURISOL – DF WG4 – Spectrometer & Detectors Red : Travelling equipments Blue : In house equipments Identification of “innovative” instrumentation for EURISOL

DF GANIL/S PIRAL2 MYRRHA ALTOCOPIN JYU… WG4.3 : Spectroscopic techniques Electron scattering Fast timing Recoil Decay tagging SIRIUS Ground state properties S3-LEB LUMIERE EURISOL – DF WG4 – Spectrometers & Detectors Red : Travelling equipments Blue : In house equipments Identification of “innovative” instrumentation for EURISOL

DF R&DIndustrial partners WG4.1 : Instrumentation for beam handling Storage rings Separators, spectrometers Traps WG4.2 : Instrumentation for radiation detection Charged particles Gamma-rays Neutrons WG4.3 : Spectroscopic techniques Electron scatteing Fast timing Recoil Decay tagging Ground state properties Identification of substantial R&D needed in future & possible collaboration with industrial partners EURISOL – DF WG4 – Spectrometers & Detectors

DF PART C: IMPLEMENTATION EURISOL – DF Proposal Guideline 5.2 Design study Has a design study been carried out with formal national, European and/or international support? (maximum 1000 characters with spacing) (WG 2,3,4) Please upload references and outcome. (Maximum 1 MB) Concerning the Technical Design Report (TDR): are all the relevant technologies available or substantial R&D is needed (how many years) in order to assess the full technical feasibility and draw a reliable cost-book? (WG 2,3,4) (maximum 1000 characters with spacing) Is industrial capacity already in place (EU or international market) or does it need to be developed/installed in relation to the project (spin off companies, joint- ventures)? (maximum 2000 characters with spacing) (WG 2,3,4)

DF PART C: IMPLEMENTATION EURISOL – DF Proposal 10. FINANCIAL ASPECTS AND COMMITMENTS 10.1 What are the current cost estimates and budget projections, construction/implementation, operation and, if applicable, for decommissioning? Please indicate the confidence levels of your estimates. Please indicate if they are based on suppliers’ quotations.(maximum 4000 characters with spacing) (WG 2,3,4) Please upload cost models and cost-book analysis, if available. In case of distributed RI, please take into account estimates for hub, national nodes and main upgrades (maximum 1 MB). (WG 2,3,4)

DF 11. FEASIBILITY AND RISKS 11.1 Are there scientific developments or competing projects elsewhere that could affect the research foreseen at the infrastructure? (WG 1,2,3,4,5) (maximum 1000 characters with spacing) 11.2 What are the risks that in your view could delay, increase costs of or make realisation of the infrastructure tasks impossible? Do you have any specific technical risks? Have you undertaken a technical options analysis? (WG 2,3,4) (maximum 1000 characters with spacing) 11.3 What are the main schedule uncertainties? (maximum 1000 characters with spacing) (WG 2,3,4,5) 11.4 Please identify the main technological and construction/operation-related challenges and how the RI will tackle them. (maximum 2000 characters with spacing) (WG 2,3,4) EURISOL – DF Proposal

DF Methodology ? Schedule of actions ? EURISOL – DF Proposal