1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)

Slides:



Advertisements
Similar presentations
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Advertisements

ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Low Emittance RF Gun Developments for PAL-XFEL
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
SIS 100 Vacuum chamber Recooler String system Components
LCLS-II Technical Requirements
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements  T Böckmann1, Y Bozhko1, W Gay2, P Halczynski2, B Petersen1, S Putselyk3,
Process Simulation for the LCLS-II Cryogenic Systems
WP5 Elliptical cavities
at STFC Daresbury laboratory
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
SC Quadrupole Magnets in ILC Cryomodules
Project X: Cryogenic Segmentation Issues
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ILC Cryogenic Systems Draft EDR Plan
Commissioning and First Cooldown of XFEL Linac
BriXS – MariX WG 8,9 LASA December 13, 2017.
Wolfgang Anders, BESSY, Berlin
CW Operation of XFEL Modules
Review of the European XFEL Linac System
ILC Experimental Hall Cryogenics An Overview
ILC Cryogenics -- Technical Design Report Planning
Cryomodules Challenges for PERLE
ERL Director’s Review Main Linac
Presentation transcript:

1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)

2 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Outline XFEL accelerator structure ‘TESLA’ technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)

3 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL Photon Parameters

4 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL Accelerator requirements: 14 – 20 GeV electron beam energy About superconducting RF cavities at 23 MV/m -> TESLA –technology pulsed 10 Hz operation two independent injectors (1.3 GHz cm GHz cm each) Main linac: 1.65 km cryomodules Booster 12 cryomodules two bunch-compressor sections -> transferline bypasses needed 0.1 nm Photons X-ray FEL

5 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL-Accelerator Tunnel XTL

6 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS 10 Hz pulsed operation each cryomodule consist of: GHz 9-cell Nb cavities (2K) 1 magnet package (2K) 2 thermal shields (5-8K;40-80K) 8 main RF couplers 8 cold tuners Main features of XFEL-cryomodule design based on the TESLA/TTF –type III design -> use of ‚TESLA‘-technology Cryomodule cross-section XFEL requirement: 23.6 MV/m

7 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Accelerator Module (Cryomodule) The XFEL accelerator module is based on the 3 rd cryomodule generation tested at the TESLA Test Facility and designed by INFN. Already 12 cryomodules have been built and commissioned for the TTF Linac. Length 12.2 m Total weight 7.8 t 38” carbon steel vessel 300 mm He gas return pipe acting as support structure 8 accelerating cavities cavity to cavity spacing exactly one RF wavelength inter-module cavity to cavity spacing a multiple of one RF wavelength one beam position monitor / magnet unit manually operated valves to terminate the beam tube at both ends longitudinal cavity position independent from the contraction / elongation of the HeGRP during cool-down / warm-up procedure 16

8 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS 2.2 K forward 40 K forward 2 K 2-phase cavity 2 K return 80 K return 8 K return RF main coupler magnet current feedthrough 5 K forward 4 K shield 70 K shield Accelerator Module (Cryomodule) 17

9 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Safety Measures Safety flaps (up to DN300) installed on the vacuum vessel of each cryomodule LHC event : we reviewed helium release in XFEL tunnel

10 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL Magnet Package and Cold BPM At the downstream end of the cavity string of each module a magnet package and an attached BPM is placed. a super-ferric quadrupole a vertical and a horizontal dipole BPM is either re-entrant (SACLAY design) or pick-up (DESY design) type. Quadrupole to BPM alignment is 0.3 mm and 3 mrad. The magnet design is done in collaboration with CIEMAT. The current leads are based on the CERN design used at LHC. 19 magnet package current leads beam position monitor 2 K two-phase line SC Magnet Package at 2K

11 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Choice of cryogenic parameters 2K Helium II – bath: well below lambda transition close to heat conductivity maximum of saturated liquid Qo>10**10 for TESLA cavities (lower temperature has only limited advantage for pulsed RF operation) Low vapor pressure enables relative pressure stability in the order of less than +/- 1 % (problems with CCs !?) 5-8K circuit: 5K traditional from TESLA TDR (TESLA quad cooling,still main coupler thermal intercepts), fits to HERA cryo plant 40-80K circuit: Standard layout, fits to HERA plant

12 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS TESLA Cavities show BCS temperature dependence in Cryomodule

13 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL-Linac-Cryogenic tasks (TDR) sc Nb 1.3 ‑ GHz 9 ‑ cell cavities have to be cooled in a Helium II bath at 2K, Qo= 10**10, 23.6 MV/m, 10 Hz GHz cavities (in 2 cryomodules) ,3 GHz cryomodules in RF operation - 12 cryomodules in ‘cold stand-by’ - 2 ‚Cryo-Bypass-Transfer-Lines‘ (BCBTL) - at warm Bunch-Compressor sections - 2 independent injectors ( 1.3 GHz GHz cm each) (NEW start ) Very new start version

14 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL project realization in stages Start version: 80 cryomodules 14 GeV Could be up-graded already during construction to 100 cryomodules 17.5 Gev Final up-grade (according to TDR): 120 cryomodules 20 Gev + cw injector

15 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Heat loads & mass flows of final 20 GeV stage Subjects of process optimization 13.4 KW 4.5K eq

16 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Heat loads & mass flows of 17.5 GeV stage 10.8 KW eq 4.5K

17 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Continous operation of the refrigerator 24 h per day / 7 days per week Operation periods of 2 – 3 years without scheduled break of cold helium supply Avialability > 99% (without ‘utilities’ and process control) Operating conditions of XFEL Linac-Cryogenic

18 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Use of HERA cryogenic plant Preliminary studies from TU Dresden and a detailed industrial study by LINDE KRYOTECHNIK AG -> 2 HERA refrigerators (8 KW eq 4.5K each) could be modified to XFEL- refrigerator ( + 2K system) Advantages: Only ½ of investment costs compared to new refrigerator No extra civil engineering effort Utilities exist Dis-advantages: Lower efficiency compared to new plant Re-use of worn equipment Parallel operation of 2 cold boxes challenging (symmetrical operation) There is still hope that only one CB will be sufficient to operate the 14 GeV linac ( or even the 17.5 GeV linac, if we’ll not need all the capacity of the overhead)

19 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Concept of XFEL-cryogenic Distribution Box VALVE BOX 2K BOX CC F BCBTL MAIN LINAC INJECTORS BCBTL BOOSTER 3.9 GHz CMS CM F SCB VC Valve BOX CB AMTF SC

20 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Main Transfer Line Piping Bridge to XSE

21 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Cryogenic installations in XSE Distribution Box

22 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Concept of XFEL-Linac Cryogenic 2 K return 40/80 K forward 40/80 K return, shield cooling 2.2 K forward lead cooling 5 K forward 8 K return, shield cooling 2 K return Injector 1 40/80 K forward 40/80 K return, shield cooling 2.2 K forward 5 K forward 8 K return, shield cooling module string 2 module string 1 warm gas collection pipe Up-graded HERA plant module string 9-10 cryogenic unit (9-10 strings), 1.7 km JTHEX Simplified flow scheme 40K -> 80K shield circuit (in series) 5K -> 8K shield circuit (in series) 2K circuit (supply in parallel,return in series) Injector 2 (not shown) DB-box simplified moved to XSE

23 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Linac cryogenic ‚string‘ Cryogenic units of 12 cryomodules = ‚strings‘ String Connection Boxes contain all cryogenic instrumentation Breaking news: All individual cavity helium vessels will get a thermometer !

24 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Beam direction Laser-straight XFEL-linac BC Liquid Helium II supply Length [m] Deviation from gravity equipotential [mm] String 1String 11String 10String 9 72,761,552,334,726,017,70,0426,336,3 5 String 4 JT 8 Modules Gravity equipotential surface Disadvantage: 2-phase flow affected by gravitational forces One ‚String‘ = 12 cryomodules each of 12 m length

25 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Bunch Compressor Bypass Transferline (only 1-phase helium) Feed-Box JT Cool-down/warm-up End-BOX ‚regular‘ string connection box Linac cryogenic components

26 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Spec of Cold Turbo Compressors (CCs) DESY MKS has NO experience with the operation of CCs We need advice from CERN,J-Lab, SNS Up to now, we learned from our CERN/LHC colleagues: - ‘mixed-cycle’ approach mandatory - to increase CCs dynamic range - to restart from sub-atmospheric conditions of the linac - 5 stages approach too risky - make up of T,P, mass flow is a touchy operation

27 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS CCs mixed-cycle approach DESY ‘mixed-cycle’ approach: we could use the JT-screw (minimum 650 mbar) and/or make use of our helium pump units of the Accelerator Module Test Facility (AMTF) 2 X 20 g/s at 20 mbar (sufficient for static loads) 100 g/s at 200 mbar for mixed cycle + Extra heat exchanger in distribution box

28 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS 2K reference specification ( simplified) Cold Compressors T bath = f ( P bath ) 4.5 K load 40/80 K load HEX JT subcooler HEX VC SC Existing Refrigerator ‚mixed cycle‘ Critical for HERA CBs Details are subject of call for tender ! ?

29 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Sources of pressure variations: heavy single cavity quench in FLASH Pressure [mbar] Mass flow [g/s] Temp [K] P at linac endcap P at helium pumps He mass flow T cavity He vessel 5 min !!!

30 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS XFEL pressure stability Spec RF change of TESLA cavities vs pressure change : about 50 Hz / mbar Note from DESY RF experts: fluctuations not larger than +/- 35 Hz to avoid RF phase shifts -> pressure stability better than +/- 0.7 mbar required We specify 1% relative pressure stability -> 31 mbar +/- 0.3 mbar (LHC 5 % relative pressure changes caused by the accelerator components) Our question in call for tender: How does the CCs regulation react on a sudden mass flow change of 10% ?

31 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Pressure variations expected in XFEL linac Arkadiy‘s questions: 1. Range of presures during normal operations ? -> 31 mbar +/- 0.3 mbar ( 1%) 2. Timescale ? -> Hours ! From FLASH experience we expect very stable conditions 3. Occasional/rare pressure variations ? -> Switching on/off RF, Quenches (see FLASH example) For the switching of RF we‘ll need some ‚ramping‘ by means of electrical heaters Trips of CCs ?

32 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS CW-operation of TESLA cavities -> BESSY(1) W.Anders, J.Knobloch et al. at DESY: see SRF2009 paper D.Kostin, WD Möller et al.

33 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS CW-operation of TESLA cavities -> BESSY(2)

34 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS CW-operation of TESLA cavities -> BESSY(3)

35 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS CW-operation of TESLA cavities -> BESSY(4)

36 Project X collaboration meeting, FNAL, September 8-9, 2010 Bernd Petersen DESY MKS Summary XFEL accelerator structure ‘TESLA’ technology Basic cryogenic parameters Tasks & up-grade scenarios Heat load capacities of XFEL refrigerator Use of former HERA refrigerators Lay out of XFEL cryogenic system Cold turbo compressor issues Pressure variations/stability CW operation of TESLA cavities (reference to BESSY)