Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.

Slides:



Advertisements
Similar presentations
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
ICRA Panel System Installation Instructions
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
Physics 111 Practice Problem Statements 05 Force and Motion II – Friction, Circular Motion SJ 8th Ed.: Ch. 5.8, 6.1 – 6.3 Contents: 6-4E, 6-5E*, 6-19P,
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Michael White & Erik Mueller.  The thruster involved works by the principle of chemical decomposition  Catalyst renders the mixture unstable  Propellant.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
SQXF Shell & Yoke Assembly Procedure
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Design Progress Allen Ellis 18-September
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Vaccon Vacuum Pump 2” Diameter flexible tubing to fit inside U-Bolt (not shown) will be used to attach tubing to framework. Vaccon Inline Venturi Vacuum.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Physics 101: Lecture 27, Pg 1 Forces: Equilibrium Examples Physics 101: Lecture 02 l Today’s lecture will cover Textbook Sections No LAB preflights.
A Straightness Monitor Made from Distance Meters First installations fall 2006 First results spring A B.
BPM support and beam pipe length FD support status A.Jeremie.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Classical Mechanics Lecture 5
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
MONALISA Update David Urner ATF2 Meeting Dec
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
© Oxford University Press How are the plates moving?
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Alignment and stability session
GSI, for the CBM Collaboration
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Summary FD Support System
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Free Body Diagram of Cable-Pulley System
Investigating Fluid Power Rig
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Anjuman I Islam Kalsekar Technical Campus New Panvel
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
Additional Upstream Coil Shielding
IP configuration session
Cryomodule Assembly Plan
XY Scanner Mount.
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Presentation transcript:

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 2 MONALISA vacuum enclosure

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 3 Double bellows system (DBS)

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 4 Test programme Lateral spring constant Longitudinal forces (free) Longitudinal forces (attached to frame)

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 5 Lateral spring constant set-up Double bellows off floor at one end Force gauge under bias tension Lateral spring constant Ambient pressure 35±5 N/mm Inner Evacuated 35±5 N/mm

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 6 Longitudinal forces (free DBS) Force gauge under bias tension Double bellows upright resting on floor on one end (see next slide)

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 7 Longitudinal forces (free DBS) N.B. Force remains within ±50 N

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 8 Longitudinal forces (in-situ) We assembled parts into wooden frame –(Quadrupole end box not fitted) Placed force sensor –on downstream face of “Shintake monitor” –measures F in (electron beam) z direction Set up shown in next slide

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 9 Longitudinal forces (in-situ): Set-up Shintake top plate Shintake end box

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 10 Longitudinal forces (in-situ): Set-up Strain sensor (see next slide) mounted behind Shintake monitor plate mounted on independent block Mounting rods removed for forces test

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 11 Force sensor close-up Force sensor

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 12 Forces on Shintake end: 1

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 13 Forces on Shintake end: 2

Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 14 Entire assembly holds vacuum Breaking news