WP5 1 year activity report Niko Neufeld CERN/PH. WP5 (people)  6 ESRs working in ALICE, ATLAS, CMS and LHCb  Adriana Telesca  Luca Magnoni, Dan Octavian.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

IEEE NPSS 17 th Real Time Conference The ALICE Electronic Logbook Vasco Barroso for the ALICE Collaboration.
Applications developed by EN-ICE clients. 2 EN-ICE Workshop – 23 April 2009 Developed by people outside EN-ICE making use of: Our integrated solutions.
Slide 1 ACEOLE Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October.
R4 Educational Activities Report S. Hossein Mousavinezhad, REA Chair IEEE Region 4 Meeting January 27-28, 2007 Marriott.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Use Cases. Summary Define and understand slow transfers – Identify weak links, narrow down the source – Understand what perfSONAR measurements mean wrt.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
System performance monitoring in the ALICE Data Acquisition System with Zabbix Adriana Telesca October 15 th, 2013 CHEP 2013, Amsterdam.
Robert McLaren CERN 25 th February 2009www.cern.ch/aceole/meetings This started as a one slide presentation: Messages from Brussels and finance info But....
NANOSTRUCTURED AND FUNCTIONAL POLYMER- BASED MATERIALS AND NANOCOMPOSITES NANOFUN-POLY, NETWORK OF EXCELLENCE WP14 : Spreading of Excellence - Communication.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Yi Ling Hwong (ESR), CMS DAQ Yi Ling Hwong CMS.
Work Package 2: ASIC building blocks for SLHC ACEOLE Twelve Month Meeting 1 st October 2009 CERN – Geneva, Switzerland Paulo Moreira.
M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 Network, common training programme and outreach M. Silari.
Work Package 5 Data Acquisition and High Level Triggering System Jean-Christophe Garnier 3/08/2010.
> 1 ENGINE WP2 Special Meetings, Orléans, France, 13&15/02/2006 ENGINE ENhanced Geothermal Innovative Network for Europe WP2 Special Meetings Information.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project Report 2012 Ok, you learned a lot … But what did I learn.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
WP 9: Dissemination of results and exploitation RENESENG kick off, Athens, Nov 2013.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
ICE-DIP Mid-term review Data Transfer WP4a - ESR4: Aram Santogidis › 16/1/2015.
Slide 1 ACEOLE Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October 2008.
Kick-off meeting, CERN, 2-Oct-08 M. Letheren 1 ACEOLE Marie Curie Initial Training Network Data Acquisition, Electronics and Optoelectronics for LHC Experiments.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Adriana Telesca Mid Term Review 3 rd August 2010.
ACEOLE Review Early Stage Researcher, WP5 Dan Octavian SAVU.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
SIforAge Partner Presentation Of Your Organization February 2013 YOUR Organizations Logo.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Background Overview of the work Secondments, conferences.
AMVA4NewPhysics Work Packages 5,6,7 Tommaso Dorigo (INFN-Sezione di Padova) CERN, Kick-Off meeting, September 16 th 2015.
…building the next IT revolution From Web to Grid…
Summary Collaborative tools track Eva Hladká Masaryk University & CESNET Czech Republic.
Report on CHEP ‘06 David Lawrence. Conference had many participants, but was clearly dominated by LHC LHC has 4 major experiments: ALICE, ATLAS, CMS,
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.
Geneva, November 2013 Speaker: Peter Keinz
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WLCG and the India-CERN Collaboration David Collados CERN - Information technology 27 February 2014.
SLHC-PP WP2: Coordination for the SLHC accelerator implementation, agenda for the kick-off meeting 1. Introduction to WP2(20’, G. de Rijk) 2. Work plan:
23/2/2000Status of GAUDI 1 P. Mato / CERN Computing meeting, LHCb Week 23 February 2000.
2nd annual ARTEMIS meeting Le Carré des Sciences Paris 3-4 July 2008 Rosy Nikolaidou CEA Saclay.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CERN 1st October 2009www.cern.ch/aceole/meetings ACEOLE: WP6 From Annex I: “Work package 6 covers research contributions, transfer of knowledge and planning.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ACEOLE WP4 Optical Transmission Systems.
Senior European Volunteers Exchange Network 3rd Network Meeting Vienna November 30 – December 3, 2009 Charlotte Strümpel Status quo of the on-going evaluation.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Myself Training Technical Dissemination Impact.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
CERN 1sr October 2009www.cern.ch/aceole/meetings ACEOLE: Twelve Month Meeting  Welcome, news of upcoming events, EC related events  Reports from Work.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.
J. Templon Nikhef Amsterdam Physics Data Processing Group Large Scale Computing Jeff Templon Nikhef Jamboree, Utrecht, 10 december 2012.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Spyridon.
FUSE TEMPUS Project Coordination Meeting Belgrade University, 27 and 28 November, 2014 WP 5 - Dissemination of Project- Related Information ACTION PLAN.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
CMS – The Detector Control System
Work Package 5: Data Acquisition
Mid-term review presentation 3rd August 2010
Marie Curie, CMS & I : When People and Ideas Come Together
Development and Maintenance of CMS ElogBook
Results of the 2nd year of the program Title
Results of the 2nd year of the program Title
Results of the 3rd year of the program Title
Presentation transcript:

WP5 1 year activity report Niko Neufeld CERN/PH

WP5 (people)  6 ESRs working in ALICE, ATLAS, CMS and LHCb  Adriana Telesca  Luca Magnoni, Dan Octavian Savu  Sebastian Bukowiec, Yi Ling Hwong  Jean-Christophe Garnier  2 ERs to work in ATLAS and CMS (still to be hired)  6 supervisors, 1 coordinator  1 visiting scientist WP5 12-months Niko Neufeld

WP5 – Associated Partners  Force10 networks  Laboratori Nazionali di Legnaro (LNL) WP5 12-months Niko Neufeld

WP5: Work  All researchers are deeply involved in core projects in their respective Online system.  In broad terms of fields we have  storage (2)  experiment control (3)  collaborative tools (1)  network (2) WP5 12-months Niko Neufeld

Training  WP5 students have followed a lot of training courses (many of them outside CERN)  languages: from German to Java  data-bases  storage technologies  Ethernet networking (router configuration)  control systems & SCADA  but arguably the most valuable training is what they learn and learned at CERN from their supervisors on-the-job! WP5 12-months Niko Neufeld

Papers, presentations  ACEOLE students are very active participants in conferences such as CHEP, TWEPP, IEEE RealTime (and very soon) ICALEPCSCHEPTWEPPIEEE RealTimeICALEPCS  6 conference contributions, 4 oral presentations, 2 posters, two papers to appear in peer- reviewed journals  And this is just the beginning… (most students do not even have a full year yet!) WP5 12-months Niko Neufeld

WP5 in year 2  Secondments  easy for networking guys (Force10)  not so easy for some other fields (no direct associated partner)  Visiting scientist  ER hiring  LHC startup!!! WP5 12-months Niko Neufeld

Summary & Status  WP5 ESRs well integrated in the LHC experiments with exciting projects  Lots of good results already! (Deliverable D51!)  After the LHC startup we are sure to see (more) R&D results on SLHC (Deliverable D52)  Lots of training in and outside CERN, conference papers & presentations WP5 12-months Niko Neufeld

WP5 is fun! WP5 12-months Niko Neufeld