Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)

Slides:



Advertisements
Similar presentations
Experimental Evaluation of an Informational and Behavior Change Program to Increase Undergraduate Students’ Energy Conservation Marcie Desrochers, Hilary.
Advertisements

Multi-parameter Water-Quality Probes (YSI/Hydrolab) Lecture 4.
Slide 1 of 10 Job Event Basics A Job Event is the name for the collection of components that comprise a scheduled job. On the iSeries a the available Job.
Please log in to the ASTRA server: Open in Firefox, Click ‘I Understand the Risks’ then ‘Add Exception’
11 MAINTAINING THE OPERATING SYSTEM Chapter 5. Chapter 5: MAINTAINING THE OPERATING SYSTEM2 CHAPTER OVERVIEW  Understand the difference between service.
By: Hunter Williams. I do yard work for people in my neighborhood I do it once a week for $75 per session.
TWU Student Union Online Reservation System Training Session.
Struts Portlet Redirect Copyright © Liferay, Inc. All Rights Reserved. No material may be reproduced electronically or in print without written.
Microsoft Project User Group September Chapter Meeting Resource Pooling Presented by James Nuthall Brentford Technologies, Inc.
1 © 2001, Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID SQL 2005.
©2010 Micron Technology, Inc. All rights reserved. Products are warranted only to meet Micron’s production data sheet specifications. Information, products,
Patricia Méndez Lorenzo & Roberto Alvarez Alonso (IT-DI/SM) 03/10/2013 Calendars Facility in ServiceNow2.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Infection Adjudication on REDCAP Module 1 Version: Feb 1st, 2012.
Train the Force I Introduce the class by discussing Training, its importance to the success of the army. This lesson will first focus on the principles.
SPIFe In Operations for NEEMO 14 Jack Li Mel Ludowise Michael McCurdy Jessica Marquez 0.
Considerations for the Service Package Request/Service Package Recommended Standard October 2013 San Antonio, TX John Pietras Global Science and.
1 Chapter Overview Monitoring Access to Shared Folders Creating and Sharing Local and Remote Folders Monitoring Network Users Using Offline Folders and.
1 Equipment Search. 2 Equipment Inquiry There are multiple ways to search the equipment rental file. Searches can be done on: Serialized Equipment And/Or.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
Overview of the Inc Experiments supported by CADMOS Hélène RUGET - Maurice MARNAT.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
Payload Operations Integration Working Group (POIWG) July 2012 Human Research Program (HRP) Andres Ovalles HRP Increment 33/34 Overview Increment Manager.
Payload Operations Integration Working Group (POIWG) Jan th, 2011 Human Research Program (HRP) Blue Bradley Human Research Program (HRP) Lyndon B.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
Payload Operations Integration Working Group (POIWG) Increment 31/32 Overview January 24-26, 2011 Charles (Casey) Joyce Robotics.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Payload Operations Integration Working Group (POIWG) February 3-5, 2009 Human Research Program (HRP) Marc Perry HRP Increment 19/20 Overview Increment.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Page No. 1 Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 01/29/13 Increment Manager/Ben Pawlik Increment Engineer/Maria Baugh-Horstman,
1 July 2008 POIWG #24 – Inc 18 Overview ISS Medical Project (ISSMP) S. Johnston/K. Spicer Human Research Program (HRP) Increment 18 Overview Increment.
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
I29/30 Robonaut Training Strategy Team (TST) Mike Joseph Robonaut Training Coordinator Notice: Material contained.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
CADMOS-POIWG#31 I Jan , 2012 I Huntsville POIWG #31 – Jan , 2012 Stéphanie HERR - Alain MAILLET Overview of the Experiments supported.
ISS Medical Program (ISSMP) Inc. 39/40 Training Strategy Team (TST) Sondra Fabian Inc. 39/40 Training Coordinator May.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
Spinal Ultrasound Training Strategy Team (TST) Joyce Schultz Crew Training Coordinator
Sona Software Workshop University of Sussex Department of Psychology.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
CADMOS for ESA Inc 25&26 supported activities Maurice MARNAT CADMOS - CNES POIWG #28: July 27-29, 2010.
Overview of the Inc Experiments supported by CADMOS Alain MAILLET.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
Damec Research Aps POIWG Meeting, July 2011 Upcoming Damec Operations by Thomas A. E. Andersen 1.
POIWG #32 – Jul , 2012 François NUYTTENS – Cécile THEVENOT Overview of the Inc Experiments supported by CADMOS.
Damec Research Aps POIWG July 2008 CARD Long-term microgravity: A model for investigating mechanisms of heart disease and sympatho adrenal activity during.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
Payload Operations Integration Working Group (POIWG) July 2013 Human Research Program (HRP) Andres Ovalles Human Research Program (HRP) HRP Increment 37/38.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
Multi camera.
BYLAWS of SHENANDOAH UNIVERSITY MUSIC THERAPY ASSOCIATION
Oracle Sales Cloud Sales campaign
Investigation X – Increment 33 & 34 Scenario (it’s only a template)
Gradebook & The Content management system
Presentation transcript:

Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days) sessions required per subject.  At least 7 days between FD15 and FD30 sessions; at least 3 weeks between all other sessions; final session within 2 weeks of landing, but at least 3 weeks from the previous session.  Frozen blood collection sessions are combined with concurrent sessions for Biochem Profile and/or Repository when subjects also participate in these experiments. When combined, refer to this slide. Session Day -1 (Day 4) :15 HRF-F/BLD-OPS25_SUB (ProK, ProK/Repo sessions post-sleep) OR HRF-F/BLD-OPS35_SUB (ProK/Biochem/Repo session post-sleep) HRF-RC-SPIN 30 Session Day (Day 5) HRF-F/BLD-SETUP :10 HRF-RC-CNFG HRF-F/BLD-STOWHRF-SPIN-CNCLD HRF-MELFI-INS OR HRF-GLCR-INS < 1:10 HRF2-RACK PWRUP-CMD :05:10 :20 :25 OR :35 HRF2-RC-TRACK :30 ESA-HRF2-ACT (ESA) HRF2-RACK/PC-TRACK :30 mDPCmDPC CREWWAKECREWWAKE HRF-MED TRNR-CONSULT 1:00 ESA-HRF2-DEACT (ESA) :30 :05 HRF2-RACK PWRDN-CMD HRF Generic Frozen Blood Collection Crew Commanding Additional Activities Unattended TEXTFlexible HRF-F/BLD-COAG :15 HRF-SAMPLE-PHOTO (one FD session/subject, any photo camera operator) HRF-F/BLD-OPS_OPR REMINDER-HRF F/BLD (pre-sleep)

Revision G 8/22/13 PARC/T. Cassady Pro K HRF-URINE-OPS_SUB :20 24 hrs :20:05:20 HRF-URINE-STOW HRF-URINE-OPS_SUB (post-sleep) HRF-URINE-OPS_SUB HRF-MELFI-INS OPS OR HRF-GLCR-INS OPS :05:20 :05 HRF-MELFI-R/INS OPS OR HRF-GLCR-R/INS OPS HRF-MELFI-R/INS OPS OR HRF-GLCR-R/INS OPS HRF-URINE-SETUP OR HRF-URINE-SETUP1 (1 st performance/subject) REMINDER-HRF URN END (post-sleep) HRF-URINE-OPS_SUB (post-sleep) HRF-URINE-OPS_SUB REMINDER-HRF URN CLT (pre-sleep) :05:20:05 :20 :05 HRF Generic Urine Collection :05 Crew TEXTFlexible Session Day -1 (Day 4/Start) Session Day -2 (Day 3/Day Before) Session Day (Day 5/Closeout)  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days) sessions required per subject.  The start of the 24-hour urine collection window occurs 24 hours before blood collection. FD session windows correspond to blood collection day.  If urine ops/inserts are scheduled on off-duty days, schedule 3 urine ops/inserts on first day of collection and 2 urine ops/inserts on second day of collection.  Urine collection sessions are combined with concurrent sessions for Biochem Profile and/or Repository when subjects also participate in these experiments. When combined, refer to this slide.  Urine collection sessions should be combined with concurrent sessions for Salivary Markers when subjects also participate in that experiment, when possible. When combined, refer to this slide.  Urine collection sessions for multiple subjects should be scheduled concurrently or on consecutive days when possible. HRF-SAMPLE-PHOTO (one FD session/subject, any photo camera operator) HRF-MELFI-INS OPS OR HRF-GLCR-INS OPS HRF-MELFI-INS OPS OR HRF-GLCR-INS OPS :05

Revision G 8/22/13 PARC/T. Cassady Pro K Session Day -2 (Day 3) Session Day -5 (Day Before) Session Day -4 (Day 1/Start) Session Day -3 (Day 2) Session Day (Day 5/Closeout) :10 PROK-URN PH-TEST_SUB (post-sleep) PROK-DIET C-LOG1_SUB (midday) OR PRK-DIET M-LOG1_SUB (FD30 session midday) :05 PROK-LOG-PHOTO :05:10:05 PROK-DIET C-LOG_SUB (midday) OR PROK-DIET M-LOG_SUB (FD30 session midday) PROK-URN PH-TEST_SUB (post-sleep) PROK-DIET C-LOG_SUB (midday) OR PROK-DIET M-LOG_SUB (FD30 session midday) PROK-URN PH-TEST_SUB (post-sleep) PROK-URN PH-TEST_SUB (post-sleep) PROK-URN PH-TEST_SUB (post-sleep) :05 REMINDER-PROK DIET-C (pre-sleep) OR REMINDER-PROK DIET-M (FD30 session pre-sleep) PROK-PH KIT-UNSTOW PROK-DIET C-LOG_SUB (midday) OR PROK-DIET M-LOG_SUB (FD30 session midday) Session Day -1 (Day 4) Controlled Diet and Log and Urine pH Test Crew TEXTFlexible  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days) sessions required per subject.  The start of the 4-day controlled diet (monitored FD30) window occurs 96 hours before blood collection, 72 hours before 24-hour urine collection start. FD session windows correspond to blood collection day.

Revision G 8/22/13 PARC/T. Cassady Pro K :30 HRF1-SLAMMD-BMM_SUB (all subjects, sequentially, in any order) HRF1-SLAMMD-SETUP OR HRF1-SLAMMD-SETUP1 OR (1 st time operator performance) HRF1-SLAMMD-SU CTRL OR HRF1-SLAMMD-SU CTRL1 OR (control run performed) (control run performed, 1 st time operator performance) HRF1-SLAMMD-SU PARTL OR HRF1-SLAMMD-SU PRTL CR (SLAMMD partially deployed) (SLAMMD partially deployed, control run performed) HRF1-SLAMMD-STOW OR HRF1-SLAMMD-STOW TMP OR HRF1-SLMD-STW TMP CR (SLAMMD left partially deployed) (SLAMMD left partially deployed, control run performed) HRF1-SLAMMD-CTRL RUN (control run performed, assume 1 st session/increment) :20 OR :30 OR :15 OR :20 :15:10 :20 OR :10 OR :20 HRF1-SLAMMD-TRACK SLAMMD Body Mass Measurement Crew Commanding Unattended HRF1-RACK-PWRDN CMD ESA-HRF2-DEACT (ESA) ESA-HRF1-ACT (ESA) HRF1-RACK/PC-TRACK 1:00 HRF1-RACK-PWRUP CMD  FD14 and every 30 days thereafter (all once/month) sessions required per subject.  SLAMMD BMM sessions are combined with concurrent sessions for Biochem Profile and Body Measures. When combined, refer to this slide.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline27/2812/8/10 EO10-PPO Baseline27/28 & Subs 4/1/11 Nutrition Nominal: Reserve: 0.75 Pro K Nominal: 1.83 Reserve: 0.00 Repository Nominal: 3.25 Reserve: 0.00 Inc 27/28 Working PTP 11/1/10 Nutrition Nominal: Reserve: 0.75 Pro K Nominal: 1.67 Reserve: 0.00 Repository Nominal: 3.25 Reserve: 0.00 Nutrition Nominal: -Coleman (I27 FE6): 2 sessions and 2 monthly SLAMMD BMMs. - Nespoli (I27 FE5): 2 sessions and 2 monthly SLAMMD BMMs. - Garan (I27/28 FE3): 5 sessions and 6 monthly SLAMMD BMMs (includes 1 cntrl run). - Fossum( I28 FE6): 3 sessions and 4 monthly SLAMMD BMMs. - Furukawa (I28 FE5): 3 sessions and 4 monthly SLAMMD BMMs. Reserve: Photo ops (Garan, Furukawa, & Fossum). Pro K Nominal: Nespoli (I27 FE5): 2 sessions w/Nutrition. Reserve: N/A Repository Nominal: - Coleman I27 FE6): 2 sessions w/Nutrition. - Nespoli (I27 FE5): 2 sessions w/Nutrition. - Garan (I27/28 FE3): 5 sessions w/Nutrition. - Fossum (I28 FE6): 3 sessions w/Nutrition. - Furukawa (I28 FE5): 3 sessions w/Nutrition. Reserve: N/A PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision A29/30 & Subs 6/23/11 Nutrition Nominal: Reserve: 0.25 Pro K Nominal: Reserve: 0.25 Repository Nominal: 2.83 Reserve: 0.00 Inc 29/30 Working PTP 4/22/11 Nutrition Nominal: Reserve: 0.25 Pro K Nominal: Reserve: 0.00 Repository Nominal: 2.83 Reserve: 0.00 Nutrition Nominal: - Fossum (I29 CDR): 2 sessions (27S FD120 & FD180) and 2 SLAMMD sessions (monthly). - Furukawa (I29 FE5): 2 sessions (27S FD120 & FD180) and 2 SLAMMD sessions (monthly). - Pettit (I30 FE6): 3 sessions (29S FD15, FD30, & FD60) and 4 SLAMMD sessions (monthly) with Control Run included in first session. Reserve: Photo ops (Pettit). Pro K Nominal: - Pettit (I30 FE6): 3 sessions w/Nutrition (29S FD15, FD30, & FD60). - Kuipers (I30 FE5): 3 sessions (29S FD15, FD30, & FD60) and 4 SLAMMD sessions (monthly). Reserve: Photo ops (Kuipers). Repository Nominal: - Fossum (I29 CDR): 2 sessions w/Nutrition (27S FD120 & FD180). - Furukawa (I29 FE5): 2 sessions w/Nutrition (27S FD120 & FD180). - Pettit (I30 FE6): 3 sessions w/Nutrition (29S FD15, FD30, & FD60). - Kuipers (I30 FE5): 3 sessions w/Pro K (29S FD15, FD30, & FD60). - UMS Maintenance Flush: 4 sessions. Reserve: N/A PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision B31/32 & Subs 12/8/11 Nutrition Nominal: Reserve: 0.25 Pro K Nominal: Reserve: 0.50 Repository Nominal: 1.25 Reserve: 0.00 Inc 31/32 Working PTP 10/31/11 Nutrition Nominal: Reserve: 0.25 Pro K Nominal: Reserve: 0.50 Repository Nominal: 3.25 Reserve: 0.00 Nominal: - Kuipers (I31 FE5): 2 Nutrition/Repository/Pro K sessions (29S FD120 & FD180) and 2 SLAMMD sessions (monthly). (Crewtime booked under Pro K/Repository). - Pettit (I31 FE6): 2 Nutrition/Repository/Pro K sessions (29S FD120 & FD180) and 2 SLAMMD sessions (monthly). (Crewtime booked under Nutrition/Repository). - Acaba (I31/32 FE3): 5 Nutrition/Repository/Pro K sessions (30S FD15, FD30, FD60, FD120, & FD180) and 6 SLAMMD sessions (monthly). (Crewtime booked under Pro K/Repository). - Williams (I32 FE5): 3 Nutrition/Repository/Pro K sessions (31S FD15, FD30, & FD60) and 4 SLAMMD sessions (monthly) with Control Run included in first session. (Crewtime booked under Nutrition/Repository). - Hoshide (I32 FE6): 3 Nutrition/Repository/Pro K sessions (31S FD15, FD30, & FD60) and 4 SLAMMD sessions (monthly). (Crewtime booked under Pro K/Repository). - Nutrition PTP crewtime does not include first-time increases for SLAMMD ops (additional 10 min/initial setup performance/crew; assume one initial setup/inc). - Crewtime does not include UMS Prefilter Replace ops (the crewtime will be included once UMS is operational). - Crewtime for UMS Maintenance Flush ops is included in the UMS crew roll-up. Reserve: Photo ops (Williams, Acaba, & Hoshide). PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision C33/34 & Subs 6/28/12 Nutrition Nominal: Reserve: 0.25 Pro K Nominal: Reserve: 0.50 Repository Nominal: 1.25 Reserve: 0.00 Inc 33/34 Working PTP 5/11/12 Nutrition Nominal: Reserve: 0.00 Pro K Nominal: Reserve: 0.50 Repository Nominal: 1.25 Reserve: 0.00 Nutrition: 4.33 hrs/subject/FD session, no crewtime when performed with Pro K; add 0.83 hrs/subject/SLAMMD session, 0.17 hrs for initial SLAMMD session (time increase for first performance), and 0.25 hrs for control run; add 0.25 hrs/subject for photos. Nominal: - Ford (I33/34 FE3/CDR): 5 FD sessions (32S FD15, FD30, FD60, FD120, and FD180/R-14) and 6 SLAMMD sessions (monthly) with setup/stow per session and control run in first session. - Williams (I33 CDR): 2 FD sessions w/Pro K (31S FD60/FD120 and FD180/R-14). - Hoshide (I33 FE6): 2 FD sessions w/Pro K (31S FD60/FD120 and FD180/R-14). - Hadfield (I34 FE5): 3 FD sessions w/Pro K (33S FD15, FD30, and FD60). - Marshburn (I34 FE6): 3 FD sessions w/Pro K (33S FD15, FD30, and FD60). Reserve: Photos: Ford (I33/34 FE3/CDR). Pro K: 5.25 hrs/subject/FD session; add 0.17 hrs/subject/SLAMMD session; add 0.25 hrs/subject for photos. Nominal: - Williams (I33 CDR): 2 FD sessions (31S FD60/FD120 and FD180/R-14) and 2 SLAMMD sessions (monthly). - Hoshide (I33 FE6): 2 FD sessions (31S FD60/FD120 and FD180/R-14) and 2 SLAMMD sessions (monthly). - Hadfield (I34 FE5): 3 FD sessions (33S FD15, FD30, and FD60) and 4 SLAMMD sessions (monthly). - Marshburn (I34 FE6): 3 FD sessions (33S FD15, FD30, and FD60) and 4 SLAMMD sessions (monthly). Reserve: Photos: Hadfield (I34 FE5) and Marshburn (I34 FE6). Repository: 0.08 hrs/subject/FD session when performed with Nutrition or Pro K. Nominal: - Williams (I33 CDR): 2 FD sessions w/Pro K (31S FD60/FD120 and FD180/R-14). - Hoshide (I33 FE6): 2 FD sessions w/Pro K (31S FD60/FD120 and FD180/R-14). - Ford (I33/34 FE3/CDR): 5 FD sessions w/Nutrition (32S FD15, FD30, FD60, FD120, and FD180/R-14). - Hadfield (I34 FE5): 3 FD sessions w/Pro K (33S FD15, FD30, and FD60). - Marshburn (I34 FE6): 3 FD sessions w/Pro K (33S FD15, FD30, and FD60). Reserve: N/A PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision D33/34 & Subs 8/30/12--- OCR hops…1063 incorporated (3x5 Mesh Bag Usage). - GJOP Action incorporated (De-chunkify HRF Generic Blood Collection). - No change to crew roll-up from last revision. EO10-PPO Revision E35/36 & Subs 12/19/12 Pro K Nominal: Reserve: 0.75 Nutrition Nominal: 0.00 Reserve: 0.00 Repository Nominal: 1.00 Reserve: 0.00 Inc 35/36 Working PTP 10/24/12 Pro K Nominal: Reserve: 0.75 Nutrition Nominal: 0.00 Reserve: 0.00 Repository Nominal: 1.00 Reserve: 0.00 Pro K: 5.42 hrs/subject/FD session, 0.25 hrs/subject for photo ops; 0.83 hrs/SLAMMD session for one subject, 0.17 hrs for each additional subject on the same day, 0.17 hrs for first time SLAMMD session (time increase for first performance), 0.25 hrs for control run. Nominal: - Hadfield (I35 CDR): 2 FD sessions (33S FD120, FD180/R-14) and 2 SLAMMD sessions (monthly). - Marshburn (I35 FE6): 2 FD sessions (33S FD120, FD180/R-14) and 2 SLAMMD sessions (monthly). - Cassidy (I35/36 FE3): 5 FD sessions (34S FD15, FD30, FD60, FD120, FD180/R-14) and 6 SLAMMD sessions (monthly) with control run in first session. - Parmitano (I36 FE5): 3 FD sessions (35S FD15, FD30, FD60) and 4 SLAMMD sessions (monthly). - Nyberg (I36 FE6): 3 FD sessions (35S FD15, FD30, FD60) and 4 SLAMMD sessions (monthly). Reserve: -Photo ops: Cassidy (I35/36 FE3), Nyberg (I36 FE5), and Parmitano (I36 FE6). Nutrition: No additional time when performed with Pro K. Nominal (0.00 hrs for I35/36): - Marshburn (I35 FE6): 2 FD session w/Pro K (33S FD120, FD180/R-14). Reserve (0.00 hrs for I35/36): - N/A Repository: 0.08 hrs/subject/FD session when performed with Pro K or Nutrition. Nominal: - Hadfield (I35 CDR): 2 FD sessions w/Pro K (33S FD120, FD180/R-14). - Marshburn (I35 FE6): 2 FD sessions w/Pro K (33S FD120, FD180/R-14). - Cassidy (I35/36 FE3): 5 FD sessions w/Pro K (34S FD15, FD30, FD60, FD120, FD180/R- 14). - Parmitano (I36 FE5): 3 FD sessions w/Pro K (35S FD15, FD30, FD60). Reserve: -N/A PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision F35/36 & Subs 5/6/13 Pro K Nominal: Reserve: 0.75 Nutrition Nominal: 0.00 Reserve: 0.00 Repository Nominal: 0.17 Reserve: 0.00 Inc 35/36 Working PTP 2/19/13 Pro K Nominal: Reserve: 0.75 Nutrition Nominal: 0.00 Reserve: 0.00 Repository Nominal: 1.00 Reserve: 0.00 Ops: - Pro K (FD15, FD30, FD60, FD120, & FD180/R-14): 5.50 hrs/session, additional 0.25 hrs for photos (one session/subject). - Nutrition (FD15, FD30, FD60, FD120, & FD180/R-14): 0.00 hrs/session when performed with Pro K. - Repository (FD15, FD30, FD60, FD120, & FD180/R-14): 0.00 hrs/session when performed with Pro K; 0.08 hrs/session/subject when performed with Nutrition. - SLAMMD BMM (once/month): 0.83 hrs/session for one subject, 0.17 hrs for each additional subject on the same day, additional 0.17 hrs for 1 st SLAMMD session (time increase for 1 st performance), additional 0.25 hrs for control run (once/Inc during 1 st monthly session). Nominal: - Hadfield (33S CDR): FD120 and FD180/R-14 ProK/Repo sessions and 2 monthly SLAMMD sessions (1x/month). - Marshburn (33S FE6): FD120 and FD180/R-14 ProK/Nutr/Repo sessions and 2 monthly SLAMMD sessions (1x/month). - Cassidy (34S FE3): FD15, FD30, FD60, FD120, and FD180/R-14 ProK/Repo sessions and 6 monthly SLAMMD sessions (1x/month) with control run during 1st monthly session. - Parmitano (35S FE5): FD15, FD30, and FD60 ProK/Repo sessions and 4 monthly SLAMMD sessions (1x/month). - Nyberg (I35S FE6): FD15, FD30, and FD60 ProK sessions and 4 monthly SLAMMD sessions (1x/month). Reserve: - Photos: Cassidy (34S FE3), Nyberg (35S FE5), and Parmitano (35S FE6). PPO Change Log *Crew Roll-up is not maintained real-time.

Revision G 8/22/13 PARC/T. Cassady Pro K Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Revision G37/38 & Subs 8/22/13 Pro K Nominal: Reserve: 0.25 Repository Nominal: 0.67 Reserve: 0.00 Inc 37/38 Working PTP 2/19/13 Pro K Nominal: Reserve: 0.25 Repository Nominal: 0.92 Reserve: 0.00 Ops: - Pro K Blood Collection and Urine Collection (FD15, FD30, FD60, FD120, FD180/R-14): 4.17 hrs/session, 0.25 hrs for HISD photo (one FD session/subject). - Pro K Controlled Diet and Log and Urine pH Test (FD15, FD30, FD60, FD120, FD180/R- 14): 1.08 hrs/session. - Pro K SLAMMD Body Mass Measurement (FD14, every 30 days thereafter): 0.83 hrs/session for one subject, 0.17 hrs for each additional subject on the same day, 0.17 hrs for first time operator setup performance (assume once/increment), 0.25 hrs for control run (once every 6 months). Nominal: - Parmitano (35S FE5): FD120, FD180/R-14 ProK/Repo blood/urine sessions and ProK diet/log/pH sessions; 2 monthly ProK SLAMMD sessions (once/month; crewtime for setup/stow carried under Hopkins). - Nyberg (35S FE6): FD120, FD180/R-14 ProK blood/urine/diet/log/pH sessions; 2 monthly ProK SLAMMD sessions (once/month; crewtime for setup/stow carried under Hopkins). - Hopkins (36S FE3): FD15, FD30, FD60, FD120, FD180/R-14 ProK/Biochem/Repo blood/urine sessions and ProK diet/log/pH sessions; 3 monthly ProK/Biochem/BodyM and 3 monthly ProK/Biochem SLAMMD sessions, 6 total (once/month; crewtime for setup/BMM/stow carried by Pro K), control run (1st monthly session). Reserve: - HISD photo: Hopkins (36S FE3). *Crew Roll-up is not maintained real-time. PPO Change Log