Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.

Slides:



Advertisements
Similar presentations
SESSION 2.2 Programme of Assessment Grades
Advertisements

Changing Nutritional Needs During Pregnancy. Maternal Diet and Infant Health  Recommended weight gain  1# month 1 st Trimester  1# week 2 nd and.
Return of Title IV Funds - Modules Dan Klock NASFAA 2013.
October 20 and 21, 2014 Faculty Meeting. Dr. Brantley Briley President WELCOME.
TROUTMAN ELEMENTARY MAY 6 TH, 2013 Preparing for End-of-Grade Tests.
Segment 2: Meetings with the Intern Schedule Topics 1.
NSP1 The Five C’s of Closing. 1 st C Calculate….. Calculate…..Calculate Calculate the NSP Sales Price Calculate the Subsidy/ DHCD Match Calculate the.
Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Property-Carrying Vehicles
Placement for Certificate IV in Youth Work Placement documentation, contacting agencies and reflective learning.
Office of Research and Information Technology Flexible Sleeper Berth Pilot Program October 27, 2014 Martin R. Walker, Chief Research Division.
Compliance # e-Worksite Solutions sm Strategic Alliance Program For DiversityBusiness.com Members Presented to you by: Eddie Graves The Diversity.
Federal Motor Carrier Safety Administration
Title IV Administration of Clock Ho Title IV Administration of Clock Hours Craig D, Rorie, Training Officer Federal Student Aid U.S. Department of Education.
The Diabetic Retinopathy Clinical Research Network
Educator Effectiveness Update September Training Outcomes Review the WPSD Evaluation System – Overall Focus – New & Modified Components – System.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
New Indicator 14 Frequently Asked Questions Frequently Asked Questions 3 rd Annual Secondary Transition State Planning Institute Charlotte, NC May12-14,
Education Unit The Practicum Experience Session Two.
Clock Hour Disbursement MAFAA Fall Training Day Presented by Ginny Dodds October 28, 2014.
Jobs & Drawings (Deliverables) in New TIMESHEET system TIMESHEET Screens.
Sequences & Series. Sequence: A function whose domain is a set of consecutive integers. The domain gives the relative position of each term of the sequence:
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Overview of the Inc Experiments supported by CADMOS Hélène RUGET - Maurice MARNAT.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
Payload Operations Integration Working Group (POIWG) February 3-5, 2009 Human Research Program (HRP) Marc Perry HRP Increment 19/20 Overview Increment.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
CADMOS-POIWG#31 I Jan , 2012 I Huntsville POIWG #31 – Jan , 2012 Stéphanie HERR - Alain MAILLET Overview of the Experiments supported.
Urine Collection and Pill Ingestion E255/SMO 021 Bisphosphonates Johnson Space Center, Houston, Texas Curtis KershnerKaren Lawrence 1 Bisphosphonates:
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
ISS: Nom Ops P.I. P.A. Whitson, Ph.D. Johnson Space Center, Houston, Texas E057: Renal Stone Risk During Space Flight: Assessment and Countermeasure Validation.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
CADMOS for ESA Inc 25&26 supported activities Maurice MARNAT CADMOS - CNES POIWG #28: July 27-29, 2010.
Overview of the Inc Experiments supported by CADMOS Alain MAILLET.
Damec Research Aps POIWG July 2008 CARD Long-term microgravity: A model for investigating mechanisms of heart disease and sympatho adrenal activity during.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
Introduction to Materials Management
Focused, Connected, Ready September 2014
The Greater Miami Valley EMS Council
Payroll Processing pay period end for HR Professionals
May be used for: Sick Leave Personal illness.
SAMPLE SENIOR HS SCHEDULE
Grade one First term Second term Learning unit Learning unit
Introduction to Materials Management
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Welcome to “TRC-170” Training
The REDOXS© Study REducing Deaths from OXidative Stress PART 2 of 4
FTE Recalibration Kendra Jahnke June 2018.
Secondary Ramadan Schedule
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Bell Schedule Regular 1st Hour – 8:17 - 9:10 -- CBA
Ambient Monitoring Initial Report
Secondary 3(2019) Subject Combination
Presentation transcript:

Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond to blood collection day: FD15 scheduled +/- 5 days All other FDs scheduled +/- 14 days except: - No less than 7 days between FD15 and FD30 - No less than 3 weeks between other FDs If mission not exactly 180 days, final session scheduled within 2 weeks of landing, but greater than 3 weeks from previous session Day 1 Urine Setup Urine pH Testing Diet Logging Urine pH Testing Diet Logging Urine pH Testing Diet Logging Urine pH Testing Diet Logging 24-Hr Urine Collection (day 1) Urine pH Testing Closeout 24-Hr Urine Collection Closeout (day 2) Blood Collection & Processing Diet & pH Log Photo Blood Setup Blood Ops Day 2Day 3Day 4Day 5 Nutrition - Repository - PRO K Diet & pH Log Photo OCA Downlink Blood Stow Urine Stow

Baseline 06/10/10 TDC PRO K Crew Ground 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled over 5 consecutive days beginning 96 hrs prior to blood ops and 72 hrs prior to start of 24-hr urine ops (4-day diet period: days 1 - 4; diet closeout: day 5): - Urine pH testing scheduled daily preferably in post-sleep (or at same time of day) for 5 consecutive days during 4-day diet period and diet closeout day - Diet logging scheduled daily mid-day during 4-day diet period - Diet & pH test log photos scheduled at end of session on diet closeout day (after urine and blood ops) - OCA downlink scheduled ASAP after photos Minimum 1-week separation between SOLO and PRO K sessions PROK-URN PH-TEST_SUB PROK-DIET-LOG1_SUB 4-Day Controlled/Monitored Diet Urine pH Testing & Diet Logging :05 Day 1 1st Day of Diet Day 5 Closeout Day of Diet Day 2 2nd Day of Diet Day 3 3rd Day of Diet Day 4 4th Day of Diet PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-DIET-LOG2-4_SUB PROK-URN PH-TEST_SUB PROK-LOG-PHOTO_SUB :15 PROK-OCA-DNLK :05

Baseline 06/10/10 TDC 24-Hour Urine Sample Collection 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled over 24-hr period (first morning void on day 1 through post-sleep void on day 2 to capture first morning void on both days); For planning purposes, 5 voids per crew per 24-hr period chosen as basis of calculation: - First and last urine collects/inserts of each 24-hr period scheduled in post-sleep - CS represents Cold Stowage unit: CS = MELFI for MELFI; CS = GLCR for Glacier - If urine ops scheduled on off-duty days, use 3 urine collect/insert placeholders on day 1 and 2 urine collect/insert placeholders on day 2 to ensure 24 hrs of collection For NUTR/REP/PROK combined sessions (X = A): Scheduled to begin 72 hrs after start of 4-day diet period and 24 hrs prior to blood ops For NUTR/REP combined sessions (X = B): Scheduled to begin within 24 hrs of blood ops Crew Nutrition - Repository - PRO K Once/Subject (any session) Day prior to 24-Hr Collection start HRF-URINE-STOW 1st Day of 24-Hr Collection2nd/Closeout Day of 24-Hr Collection HRF-URINE-SETUP :20 3 times throughout the day :20:05 24 hrs HRF-URN-CLCT_SUB_X HRF-URINE CS-INS :20:05 HRF-URN-CLCT_SUB_X HRF-URINE CS-INS HRF-URN-CLCT_SUB_X HRF-URINE CS-IN1 :10:20 :05 NUTR-HISD-PHOTO

Baseline 06/10/10 TDC HRF-BLOOD-COAG Day prior to Blood Collection :20 HRF-BLOOD-SETUP_X ESA-HRF2-ACT CMD PRO-HRF2-ACT CMD HRF2-RACK-PWRUP CMD HRF2-RC-TRACK HRF2-RACK/PC-TRACK HRF-BLOOD-STOW Blood Collection & Processing Day Blood Sample Collection & Processing Nutrition - Repository - PRO K < 1 hr HRF-BLOOD-DRAW_OPR HRF-BLOOD CS-INS HRF-RC-CNFG_X HRF2-RC-SPIN 30 HRF-SPIN-CNCLD HRF-RC-SETUP_X :05 :15 :20:10 :30:15 :05 :10 1:00 NUTR-HISD-PHOTO Crew Ground Time Critical Optional (Subject preference) Once/Subject 5 Sessions/Subject: Scheduled for each FD session (FDs 15, 30, 60, 120, & 180): Scheduled on FD session day: - Blood draws: Scheduled in post-sleep; Not scheduled two weeks prior to EVA unless approved and supervised by crew surgeon or his/her designee - CS represents Cold Stowage unit: CS = MELFI for MELFI; CS = GLCR for Glacier For NUTR/REP/PROK combined sessions (X = A): Scheduled 96 hrs after start of 4-day diet period and 24 hrs after start of 24-hr urine ops For NUTR/REP combined sessions (X = B): Scheduled within 24 hrs of 24-hr urine ops start :10 1:00 :30 HRF2-RACK-PWRDN CMD PRO-HRF2-DEACT CMD ESA-HRF2-DEACT CMD HRF-BLOOD-DRAW_SUB_X :10 :15 HRF-PHOTO OCA-DNLK Scheduled within 5 days after Nutrition photo series (3 photos: 1 for urine ops & 2 for blood ops)