A Designer’s View on the Road Safety Audit Process Mark Connelly 18 November 2008.

Slides:



Advertisements
Similar presentations
PROJECT STUDY AREA Route Selection. Stage 1 Environmental Assessment Guidelines to underpin the effectiveness of the National Roads Project Management.
Advertisements

2014 Baldrige Performance Excellence Program | Ensuring Quality Feedback Reports: The Tech Editing Process for 2014 Briefing for.
© Pathways Forward Transitional Ministry Consulting 2010 An Introduction to Transitional Ministry A Resource for Churches in Transition.
Writing Task F – Implementation Evaluation. Evaluations Overview You have to write 3 evaluations for this unit each focusing on a different theme: Your.
Infrastructure Planning Commission Workshop 2b Working with the IPC: Guidance and issues for promoters.
ScreenACT INFORMATION SESSION. On the Agenda ACT Screen Development Fund Cannes 2015 Screen Industry Pod.
Alcohol Treatment Pathways Don Lavoie Alcohol Policy Team.
Building & Leading Teams for Impact December 20, 2011.
Software Quality Assurance Inspection by Ross Simmerman Software developers follow a method of software quality assurance and try to eliminate bugs prior.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
Introducing the New College Scheme Seevic Performance Appraisal.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
WGITA Project Governance Wayne Jones Executive Director Australian National Audit Office.
BA Year 2 SBT Briefing for Class Mentors Wednesday, 29 th April 2015 Ben Wye Year 2 Cohort Leader - Crewe Tel Archana Hinduja.
University of Bath Peer tutor training programme in the mathematical sciences A joint initiative between Mathematical Sciences and the Students’ Union.
Road Safety Audits Ghazwan al-Haji PhD student ”On whats goes wrong in road design and how to put it right safely”
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
CEDR SG Road Safety Meeting April 6th 2005 Safey Audits. E xplanation of Audits and the Requirements at each Stage of the Audit Process. Presented by Harry.
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
Workforce Engagement Survey Engaging the workforce in simple and effective action planning.
Risk Assessment – An Essential Standard
UK higher education: quality assurance at home and abroad Carolyn Campbell The Quality Assurance Agency for Higher Education.
Internal Auditing and Outsourcing
The Heart of the Matter: supporting family contact for fostered children.
Service Organization Control (SOC) Reporting Options and Information
Photo © Rainforest Alliance Strengthening Verification in Sustainability Standards: the Development of the ISEAL Assurance Code Patrick Mallet ISEAL Credibility.
Lead Practitioner (Safeguarding) Briefings Autumn 2013.
Overview of the RSACRP project Road Safety Audit and Crash Reduction Workshop Bandung, 27 & 28 May, 2011 Gerard Neilson VicRoads International Projects.
NAVCA Quality Award Andrea Allez Performance Improvement Manager Excellent service for local groups.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
Software Development Process and Management (or how to be officious and unpopular)
UK Wide Core Skills & Training Framework Findings of 2 nd Stage Consultation and Implications for Development of the Framework.
Commissioning Self Analysis and Planning Exercise activity sheets.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Insert Your Firm’s Logo Here
Click the left mouse button to continue. If at any time you wish to end the presentation, press the Esc (Escape) key at the top left of the keyboard,
LEADING LEARNING CONFERENCE 5 June Leading Learning 1November 2005Management of complex change. The Knoster model. Leading Learning 2April/May 2006Developing.
Thames Tunnel PINS Meeting with London Boroughs Janet Wilson & Mark Wilson.
Management of road adoption of active and historic road schemes Steve Johnson Head of Network Management.
November 15, 2007 The “ABC” of Effective Field Monitoring & Supervision November 15, 2007.
@theEIFoundation | eif.org.uk Early Intervention to prevent gang and youth violence: ‘Maturity Matrix’ Early intervention (‘EI’) is about getting extra.
Chapter 12 Auditing Projects.
Section B 8 Mark questions Comparison of Key People who improved Public Health Comparison of how much progress was made in different time periods Comparison.
1 Professional Discussion An Additional Method November 2007.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
IAIA Conference on international experience & perspectives in SEA, Prague, September 2005 IAIA Conference on international experience & perspectives.
Tom McBride.  This report on the PPIR Project proposes a way of defining and formally recognising how professional engineers interact with, and respond.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
Town Hall Meeting MLK Community Center July 21, pm.
Overview Interim Advice Note 85/06 Minor Improvements to Existing National Roads Development of Approach / Issues Identified NRA TA 85/11 Guidance on.
Section C 8 Mark questions Comparison of Key People who improved Surgery and Anatomy Comparison of how much progress was made in different time periods.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
KTP Assessment Criteria May Assessment system changes New system in place for May 2016 KTP close Aligns with other Innovate UK assessment systems.
Internal Audit & Accounting Systems Review
Update on the Latest Developments in Government Auditing Standards
Approval of Assessments
Contracting Officer Podcast Slides
Sales Process March 2017.
Revised engagement approach for draft GTAC
Documentation Standards
G Project Sponsor & Business Lead : Anna Stamp & Jane Johnston
Solvency Assessment Management (SAM) Tax Task Group – submission to Standing Committee on Finance – 9 November Taxation Laws Amendment Bill –
Alignment of Part 4B with ISAE 3000
Approach to Market Cutover - Draft for Discussion
Approval of Assessments
G Project Sponsor & Business Lead : Anna Stamp & Jane Johnston
HE the Minister involved
DIMENSIONS OF POWER & AUTHORITY IN RELATIONSHIPS FRANCIS FERNANDEZ.
Presentation transcript:

A Designer’s View on the Road Safety Audit Process Mark Connelly 18 November 2008

From a Designer’s viewpoint Audits - a help or a hindrance? Does the process bring value? Designer / Auditor interface Common “problem” areas Feedback for future schemes Some case studies

Help or Hindrance? It doesn’t matter – it’s a legal requirement It can be both a help and a hindrance It often depends on the clarity of information provided to the Audit team The information presented for audit should be in keeping with the stage of the design Stage 1 should give enough information on the cross-section of the road and the likely types of road features – this helps the audit team assess the “setting” Stage 2 should give as much detail as possible to allow the audit team envisage what the scheme will look like in 3-Dimensions (or 5- Dimensions if you take movement and environment into account) Stage 3 there should be no surprises and no hangovers from the Stage 2 audit

Help or Hindrance? Consider the audit team as an integral part of the process, not just something to be ‘tagged on’ at the end Try to ensure that the process concentrates on safety issues Details are often important – if requested both parties need to consider

Does the process bring value? It will always bring value as it is an independent view – and a link reminding the design team of the “real-life” impact of the design Again, how much value will depend on what level of information you make available to the audit team Timing is important – consider this at all stages Should concentrate solely on safety and standards relating to safety

Designer/Auditor interface Roles need to be clear and agreed The process needs to be agreed and the flow of Design information and audit reports A “first round of comments” can often help to clarify any uncertainty over the design intent prior to issue of report(s) Independence of the audit team is important, but this does not mean that you cannot engage with them and talk over any issues Try and get to the root of potential problems to ascertain the degree of severity Be prepared to provide additional details if this will help

Common “problem” areas Highly restrictive land space constraints, often found in a Design & Build type of project Design programme and phasing of Design release to audit team Departures from standard* Junctions and trying to “squeeze” designs between existing roads How to deal with “flat” areas of carriageway Road markings Roundabouts

Feedback for future schemes Early feedback before the final report(s) Consider the timing of the audit in the Design programme Details are important to both parties Always meet for a thorough de-brief before each stage

Feedback for future schemes Problems often re-occur Example – dropped kerbs DTR guidance published to reduce bull-nose kerb upstands from 20/25mm to 0/6mm No standard production kerbs The requirement for 20mm up-stands still in contract requirements and still no production kerbs suitable for 0/6mm upstands

Case studies M8 Junction 10 Broxden Roundabout Glasgow Harbour M77/GSO A830 Arisaig M74 Completion

Case studies – M8 Junction 10 Roundabouts Road Markings (arrows) Slip road width

Case studies – Broxden Roundabout Road markings (spiral on the circulatory carriageway) Segregated left-turn lane (draft tech memo)

Case studies – Glasgow Harbour Signs & road markings Junctions Gyratory

Case studies – M77/GSO Mearns Junction Roundabouts

Case studies – A830 Arisaig 30mph section through AGLV Departures

Case studies – M74 Completion Junctions

Key points Earlier the better – good/clear relationships Departures process – “safety” section should have input from RSA Should concentrate solely on safety and standards relating to safety Wholly independent RSA team and leader should be highly trained/experienced Continuity of Audit team is important 3-D thinking and imagination (supplemented by perspective views), but the quality of Design information plays a large part in this