CLARIFICATION MEETING FOR PPE ACCESSORIES CORP 2902R THE SUPPLY & DELIVERY OF PPE ACCESSORIES ON AN “AS AND WHEN REQUIRED” BASIS TO ESKOM SOC LTD NATIONWIDE.

Slides:



Advertisements
Similar presentations
Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
Advertisements

COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session 31 March 2014 Centurion.
Event Management for the RAF National Sports Day Compulsory Briefing Session 2 September 2013.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021 Date: 30 July 2012 Time: 10:00.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session 05 August 2013 The Road Accident Fund.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007 Date: 22 May 2015 Time: 11:00.
Workplace Safety and Health Program
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(I) and (II) Date: 25 June 2015 Time: 11:00.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date: 04.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028 Date: 12 November 2012 Time: 11:00.
Tender Briefing Session The Development of Monitoring and Evaluation Tool CQO/2013/0004.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009 Date: 27 May 2013 Time: 11:00.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session 06 August 2013 The Road Accident Fund.
COMPULSORY BRIEFING SESSION PANEL OF ACTUARIES FOR A PERIOD OF 5 YEARS RAF /2015/00018 Date: 28 September 2015 Time: 10:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV) Date: 23 June 2015 Time: 14:00.
ENQUIRY NO. CORP 3140R CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING, SUPPLY, DELIVERY AND OFF- LOADING OF ESTIMATED.
ENQUIRY NO. CORP 3035 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING AND SUPPLY OF ESTIMATED QUANTITIES OF COMPOSITE,
Contractor Health & Safety Requirements Project :GSU Transformer System Date: 16 May 2014 A Stuart SHEQ Manager – Gx Coal 2.
26 March 2015 Clarification meeting: Scaffolding and Insulation material.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
16 July 2014 Development of Eskom Real Estate Master Plan detailing Asset Management Solution, Property Management Solution, Procurement and Financial.
Clarification Meeting: Provision of laundry services at the Kendal Contractor’s Village and Wilge Artisan Village 14 August 2015 Tender no: Tender no:
GROUP TECHNOLOGY & COMMERCIAL TACTICAL PROCUREMENT PROCUREMENT PROCESS PRESENTED BY MARTHA DE BRUYN 24 NOVEMBER
CORP 3239 Enterprise Historian Supplier Clarification Meeting Date: 17 June 2015 Time: 09h00 to 11h00 Venue: Eskom Conference Centre, MWP.
THE PROVISION OF CATERING SERVICES FOR THE MKONDENI OFFICE COMPLEX IN THE KZN OPERATING UNIT Date: 23 OCTOBER 2015 Venue: MKONDENI Time: 11H00.
Clarification Meeting: Drifling and Testing of boreholes and Water Reticulation design and Construction for the relocated communities at Kusile Power Station.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF LAND VALUATION SERVICES CORP March 2015.
Tender Clarification Meeting for Batteries: CORP3320 Date: 18 September 2015.
23 Sept 2014 The supply of spare parts and special tools for five (5) peaking generation Open Cycle Gas Turbines (OCGT) units at Gourikwa Power Station.
Environmental Requirements for BENBURG SUBSTATION 3RD 250MVA 275/132KV TRANSFORMER - CIVIL WORKS.
CLARIFICATION MEETING FOR THE PROPOSED CONTRACT FOR THE REMOVAL OF INCANDESCENT LIGHT BULBS AND THE REPLACEMENT WITH COMPACT FLORESCENT LAMPS (CFL) BULBS.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Kusile Power Station Project Enquiry clarification meeting Kusile Power Station Project Provision of two (02) independent environmental control officers.
16 March 2015 RFP GEN3261 Clarification meeting: Tutuka Coal Terminal Handling Service.
Civil works at Upington Substation. Commercial Presentation Date: 19 October 2015 Presenter: Ngiphile Nkwanyana Ref: PS(PDP)/2015/NN/07.
ENQUIRY NO. CORP 3282 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE MANUFACTURE, TESTING, SUPPLY AND DELIVERY (TRANSMISSION, DISTRIBUTION AND.
04 March 2014 Request for Proposal (RFP) the provision of professional services for the Eskom Academy of Learning (EAL) Refurbishment project for a period.
Clarification Meeting : CORP 3309 FOR THE PROVISION OF CONFIGURATION MANAGEMENT SERVICES FOR A PERIOD OF FIVE (5) YEARS Auditorium 1, Eskom Enterprise.
Event Management for the RAF National Sports Day
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
Tender Briefing Session COR34/2016
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(III)
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(I) and (II) Date: 25 June 2015 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV)
Enterprise Project Portfolio Management Solution RAF/2014/00020 Compulsory Briefing Session Centurion 15 July 2014.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session Centurion 31 March 2014.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
How to conduct Effective Stage-1 Audit
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session The Road Accident Fund 05 August 2013.
Presentation transcript:

CLARIFICATION MEETING FOR PPE ACCESSORIES CORP 2902R THE SUPPLY & DELIVERY OF PPE ACCESSORIES ON AN “AS AND WHEN REQUIRED” BASIS TO ESKOM SOC LTD NATIONWIDE ON A PROVINCIAL BASIS FOR A PERIOD OF 5 YRS 10 JULY 2014

AGENDA: CORP 2902R 2 ITEMSUBJECTRESPONSIBLE 1Opening and WelcomeNtswaki Fedile-Ditshoene 2Evacuation ProcedureEskom Safety Representative 3BackgroundNtokozo Ngubane 4Commercial PresentationNokuthula Ntshingila 5DTI-Local Procurement & ProductionRendani & Jaywant Irkhede 6Finance PresentationSuni John & Brian Muriwa 7Technical PresentationNtokozo Ngubane 8SHEMthokozisi Mhlanga 9Quality PresentationMarga Kruger 10Supplier Development & LocalisationIshmael Modiko 11QuestionsAll 12Closing

Commercial Nokuthula Ntshingila

NEC SUPPLY CONTRACT TERMS AND CONDITIONS – CORP 2902R NEC Supply contract will apply with the following options: X1 – Price adjustment for inflation X2 – Changes in the Law X4 – Parent Company Guarantee X7 – Delay Damages Z – Additional conditions of Contract 4

CONTACTS & SUBMISSION DEADLINES – CORP 2902R Eskom Contact for Corp 2902R: Name – Nokuthula Ntshingila Landline – – Timelines/Deadlines: Clarification Queries Closing Date: 29 th July 2014 (2 working days prior closing date) Enquiry Closing Date: 01 st Aug 2014 Enquiry Closing Time: 10:00am SA Telkom Time (no late submission/s will be accepted under any circumstances) – not even by a second Tender Submission Address: Corp 2902R The Tender Office Advice Centre Opposite the Main Reception Eskom Megawatt Park Maxwell Drive, Sunninghill 5 Free of Charge

SUBMISSION DOCUMENTS – CORP 2902R Your Company Return Address (In case your submission is late) Enquiry Submission: (a)The tender shall be submitted as an original hard copy, plus one (1) copy (identical to the original), and one (1) soft copy in CD / USB containing the prices only in both Pdf and excel format (See Price Schedule). The soft copy is not a substitute for hardcopy which must still be provided. (b)Tender Submission Folders to be arranged and labelled as follows: 1.Commercial (as per Commercial Tender Returnables) 2.Financial / Price 3.Supplier Development and Localisation (as per SD&L Tender Returnables) 4.SHE (as per SHE Tender Returnables) 5.Quality (as per Quality Tender Returnables) 6.Technical (as per Technical Tender Returnable) 6

EVALUATION METHOD – CORP 2902 NB! All the tenders will be evaluated centrally in Megawatt Park; the suppliers will be selected according to the province they have tendered for. This provincial tender is expected to provide the services to (9) nine provinces of South Africa.  Basic Compliance Review tender submissions for compliance to all submission requirements Ensure mandatory requirements are met. NEC contract document completed in full Declaration certificate for Local content SBD 6.2  Step 1: Functionality Technical – 40% SHE – 30% Quality – 30% Tenders which do not meet Eskom’s functionality requirements will not be evaluated further. 7

EVALUATION METHOD – CORP 2902 Cont…..  Step 2: Local Production and Content All service providers will be required to submit a Declaration Certificate for Local Production and Content SBD 6.2 (Annexure B). If the raw material to be used for a specific item is not available locally, tenderers should obtain written authorisation from the Department of Trade and Industry (DTI) should there be a need to import such raw material. A copy of the authorisation letter must be submitted together with the tender documents at the tender closing date.  Step 3: Financial Analysis An analysis of the tenderers financial statements will be conducted for the purposes of establishing the tenderers financial viability.  Step 4 – Price and Preference Eskom, as a State Owned Enterprise will use the PPPFA evaluation criteria to evaluate all bids that fully meet the above stated gate keepers. The 90/10 preference points system will be used. Calculate price points out of 90 (Tendered price). Preference points out of 10, for B-BBEE level contribution will be applied. 8

EVALUATION METHOD – CORP 2902 Cont.…..  Skills Development for Project (not a weighted criterion) PPPFA will be applicable in this transaction. Over and above the 10% allocated for B-BBEE; tenderers will also be encouraged to participate in skills development initiative during the negotiations with the shortlisted tenderers. This will form part of the contractual obligation with the successful suppliers. 9

Tender Returnables List of Tender Returnables is accessible on pages 13 to 20 of the Invitation to Tender document Non-submission of “ mandatory for evaluation” documents will render your tender non-responsive. Although all other documents are mandatory for contract award, tenderers are encouraged to submit all tender returnable documents for completeness purpose. 10

Supplier Development & Localisation (SD&L) Ishmael Modiko

We have a mandate to contribute positively to the development of the country 12 Our mandate is to achieve maximum and sustainable local development impact through leveraging Eskom’s procurement spend in a manner that allows flexibility within the business in order to accommodate government local development initiatives and policies

13 SD&L measures impact along these key performance areas Definition Key performance areas Increasing the skill base (number and skill level) of South African workers in areas relevant to the energy sector and where there is a national scarcity of skills Skills development Utilisation of Eskom and suppliers’ spend to develop South African based suppliers relevant to the energy sector (focusing primarily on BBB-EE Black Owned and youth owned suppliers) Local content Utilisation of Eskom and suppliers’ spend to foster the establishment of new competitive industries in the energy sector Industrialisation Creation of new jobs by suppliers as a direct result of Eskom business Employment and job creation Providing a platform to develop emerging suppliers, and further contribution to local developmental opportunities for national and international suppliers Supplier development

SD&L evaluation criteria (Condition of Tendering) Special Conditions of Tender (Application of other criteria in terms of section 2(1)(f) of PPPFA) 14 The objective criteria for this tender are the following: o Transformation of this sector by the appointment of a Black Owned Firm(s), o Job creation for previously disadvantaged people. o Development of small black manufacturers To achieve the above the following aspects will apply  Appoint a 100% Black Owned firm or joint venture where the lead firm with more than 50% black owned or in the event where Non-black firm get awarded the tender: 30% of spent will be with black owned distributor/supplier. NB. The joint venture may be: i)black and black or ii)black women and black owned Please note Local content will form part of DTI requirements and skills development will be negotiated prior tender award.

SD&L evaluation criteria under PPPFA The evaluation criteria seeks to increase SD&L evaluation score allocation in the overall scoring and to ensure all dimensions of local development are considered: 10%  B-BBEE - Levels (see below score card) 15

SD&L Skills Development Compliance Matrix Example {It will form part of negotiations} 16

17 B-BBEE Evaluation Scorecard

18 Occupational Health and Safety Specification (SHE) Presented by : Mthokozisi Mhlanga Contractor management OH&S

Eskom’s Core Values: ZERO HARM 2016/06/0719 Excellence Acknowledged by all for exceptional standards, performance and professionalism. Innovation Value-adding creativity and results oriented. Lead through excellence in innovation. Customer Satisfaction A commitment to meet and strive to exceed the needs of the receivers of products and services. IntegrityHonesty of purpose, conduct and discipline in actions, and respect for people. Zero HarmEskom will strive to ensure that zero harm befalls its employees, contractors, the public and the natural environment. Applicability : All Eskom Employees, Agents, Consultants, Suppliers, Contractors & Visitors. Eskom Values

Tenderer SHE Returnables Contractor Risk Category: Low Risk Non- negotiable minimum requirements that tenderers have to address and respond to when submitting tender returnables for evaluation are: Acknowledgement Form for Eskom’s Rules and Requirements (in Annexure B) signed & submitted by the Tenderer Health and Safety Plan Baseline Risk Assessment Valid Letter of Good Standing SHE Policy Failure to submit any of the above documentation will result to disqualification for further evaluation. 20

Eskom’s Rules and Requirements This is the acknowledgement form issued to the tenderer for his or her own acknowledgement of a clear understanding of all the SHE requirements at Eskom. Signing the Annexure B form will be deemed as your acceptance to conform to the following documentation and application of such within your scope of work. The following Policies/Procedures are in support of Eskom SHE requirements: Eskom SHEQ Policy Eskom Cardinal Rules Eskom Substance Abuse Policy Eskom Vehicle & Driver Procedure Incident Management Procedure The Policies & Procedures above are not tender returnables but for guidance and reference purposes. 21

Health & Safety (SHE) Plan A detailed SHE plan must address but not limited to the following : - Implementation of a SHE system, how it will be monitored and controlled - Training and competency for employees - Access and monitoring and control of visitors - Fire and Emergency preparedness - SHE risk management - How the culture of Zero harm will be entrenched into the company’s operations - The induction programme for all employees and visitors - Incident management - Personal protective equipment and safeguarding of employees - Safety initiatives, SHE awareness and communication - Housekeeping - Medical certificates - Vehicle and Driver safety 22

Baseline Risk Assessment The purpose of conducting a Baseline Risk Assessment is to establish a risk profile or a set of risk profiles. It is used to prioritise action programmes for issue-based risk assessments. The output of a Baseline Risk Assessment - is a risk profile or set of risk profiles; and It is a clear description of the methodology, system, terminology etc. used in the scoping exercise, and what may be required for the improvement of the Baseline Risk Assessment in the future. 23

Valid Letter of Good Standing It is essential to ensure that all suppliers which perform work at Eskom premises be registered with the Compensation Fund in terms of the Compensation for Occupational Injuries and Diseases Act (COID Act). In order to ensure that the above mentioned is adhered to, the tenderer needs to submit a valid letter of good standing from the Compensation Commissioner, based on Legislation in section 89, of the Compensation for Occupational Injuries and Diseases Act. 24

SHE Policy A SHE policy is a written statement of principles and goals embodying the company's commitment to workplace health and safety signed by the CEO. There are no hard and fast rules about what to include in a policy. The tenderer should create a policy that is suitable and sufficient in order to address the health and safety needs of the company. The Occupational Health and Safety Act, Act 85 of 1993, requires the employer to provide and maintain as far as reasonable and practical a work environment that is safe and without risk to the health of employees. Section 7 of the Act provides direction to employers concerning the health and safety policy of the organisation. 25

26

Technical Ntokozo Ngubane & Technical Team

Technical requirements a) Manufacturer requirements Phase 1 Completed Annexure A clearly stating the products they can manufacture and supply, also confirmation that their products comply with the Eskom specification. Phase 2 Prepare samples for the products they have tendered for to be evaluated during the site visits. Prepare the required supporting documentation for review during the site visit. The Eskom Technical Evaluating team will inspect the samples provided for compliance with the Eskom’s PPE Specification. NB: Phase 2 will be conducted on the shortlisted tenderers during Technical Evaluation. Only shortlisted tenderers will be notified of the Phase 2 requirements as well as preparation of samples & documentation. 28

Technical requirements Distributors requirements Phase 1 Obtain and submit a Letter of Agreement signed by the Manufacturer or a person in the similar level confirming that they will be sourcing their products from that Manufacturer. A completed Annexure A clearly stating products they are tendering for and confirmation that they comply with Eskom’s Specification. Phase 2 Request the Manufacturer to prepare samples for evaluation. Accompany the evaluation team to the Manufacturer’s premises during the site visit. Ensure that the required supporting documentation is prepared before site visit and is available during the site evaluation. NB: Phase 2 will be conducted on the shortlisted tenderers during Technical Evaluation. Shortlisted tenderers will be notified of the Phase 2 requirements as well as preparation of samples & documentation. 29

Technical requirements 30

Questions 31 ? 11 July 2013

Dankie Enkosi Thank you Siyabonga kakulu Ke a leboga Ke a leboha Ngiyabonga Ndi a livhuwa Ndzi khense ngopfu Commercial Finance