Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.

Slides:



Advertisements
Similar presentations
RF-Gun cavity for high charge electron generation Takuya Natsui.
Advertisements

February 17-18, 2010 R&D ERL Dmitry Kayran R&D: G5 test and Commissioning Plan Eduard Pozdeyev, Dmitry Kayran BNL R&D ERL Review February 17-18, 2010 R&D.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Reduced Gun Simulations 1. Comparison 60MV/m Gun vs 50MV/m Gun, Flat Top Laser Pulse 2. Comparison for the worst case: Gun50+Gauss Laser Pulse 3. Summary.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
POSTECH PAL Development of S-band RF gun and advanced diagnostics in PAL 박용운 (Yong Woon Park, Ph.D.) 포항 가속기 연구소 (Pohang Accelerator Laboratory, PAL) 포항공과대학교.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
I.V. Bazarov, ERL advisory mtg, Sept 2012 CLASSE Cornell University CHESS & ERL Cornell Laboratory for Accelerator-based ScienceS and Education (CLASSE)
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Summary of Accelerator System (WG2) 김귀년 경북대학교. Presentations for WG2 -Polarized Electron Source for ILC in Korea - ( 김귀년 ( 경북대 ), 박성주 (PAL)) - ILC Bunch.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Overview of PAL XFEL Project October 22, 2012 EPICS Collaboration Meeting In Soo Ko on behalf of PAL XFEL Team.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Parameter [units]Tune-up beam"low" chargehigh currenthigh charge Kin. injection energy [MeV]2.0 – Maximum beam energy [MeV]16 –
People Xavier Stragier Marnix van der Wiel (AccTec) Willem op ‘t Root Jom Luiten Walter van Dijk Seth Brussaard Walter Knulst (TUDelft) Fred Kiewiet Eddy.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
MAX IV linac overview and scope of automation Sara Thorin.
Heung-Sik Kang Pohang Accelerator Laboratory
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
S.M. Polozov & Ko., NRNU MEPhI
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
Beam dynamics simulation with 3D Field map for FCC RF gun
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
Plans of XFELO in Future ERL Facilities
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Have a chance to operate your own beam at CERN
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Accelerators in a new light
Thermal emittance measurement Gun Spectrometer
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
LCLS Gun Commissioning Status & Plans David H
What did we learn from TTF1 FEL?
LCLS Commissioning Parameters
Injector: What is needed to improve the beam quality?
Simulation Calculations
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Injector Commissioning C
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
LCLS Commissioning Parameters
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
SuperKEKB required (e+ / e-)
Presentation transcript:

Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y. Kim, J. H. Han, H. S. Kang, I. S. Ko (Pohang Accelerator Laboratory), and M. S. Chae (Physics Department, POSTECH) To be presented at the 17th International Conference on Accelerators and Beam Utilizations 1

ITF Location in PAL 2

Requirements for PAL XFEL Injector Energy139 MeV Charge0.2 nC Emittance< 0.5 mm mrad Energy Spread~10 -4 Rep. Rate60 Hz Bunch Length< 10 ps (FWHM) 3

3D Model of ITF 4

Overall Views of ITF Tunnel and Klystron Gallary 5

ITF Gallery view 6

Some Detail Views of Tunnel View from Gun TDS Laser System (in a dedicated clean room) 7

RF gun Brazed in house 8

ITF Beamline & ASTRA Simulations Current profile at injector end rms slice emttance at injector end Transverse normalized rms emittance and rms beam size J. H..Han 0.26 μm with flat-top laser pulse (0.34 μm with Gaussian pulse) M. S. Chae 9

ASTRA simulation Current profile at injector end rms slice emttance at injector end Transverse normalized rms emittance and rms beam size Simulation by J.-H.Han 0.26 μm with flat-top laser pulse * 0.34 μm with Gaussian 10

4-hole TypeCoaxial Type OldNew Frequency [MHz]2856 Mode Separation [MHz] β Repetition rate [Hz]60120~ 1000 Maximum Field Cathode [ MV/m] Coupling TypeDual Feed Side CouplingDual Feed side CouplingCoaxial Coupling Cathode TypeChangeable Cu CathodeFixed Cu CathodeChangeable(in vacuum) Various Material Cathode Iris ShapeCircleEllipse Cell-edge Rounding [mm]NA45 Cell-field ProbeNA2 EA in full cellNA Photocathode RF Guns for PAL XFEL 11

FPGA PC FPGA PC LLRF System Short-term RF stability measurements L0a : amplitude ~ 0.02 %, phase ~ 0.02  L0b : amplitude ~ 0.05 %, phase ~ 0.1  12

Transverse Deflecting Cavity rms bunch length ~ 1.53 ps ~ mm ~ 1.57 degS Streaked beam at downstream screen Calibration is done by measuring beam centriod offsets with varying phase shifts TDC in the ITF tunnel M. S. Chae J. H. Hong 13

Wire Scanner Tests I. Y. Kim N. S. Chung 14

Measurement of Laser-to-RF Timing Jitter C. K. Min J. H. Hong Gun phase (°) Phase jitter (°) Positive phase: Emission Negative phase: No emission Electron bunch rf-to-beam phase Charge fluctuation is the convolution of time-jitter and z-distribution of bunch charge 15

BPM Tests C. Kim S. J. Lee In-situ calibration of cavity BPMs for PAL-XFEL undulator section Cavity BPMs BEAM 16

Quad and Screen for Emittance Measurement Emittance Measurement by Quad scan what we want to measure M. S. Chae 17

Beam Image Processing original image background image Image within ROI 18

Nominal measurement condition parametervalue Beam energy139 MeV Beam charge~200 pC Laser injection phase25˚ Minimum measured emittance … measured on Mar 14 ε x ~0.71 μm (100 %) / ~0.39 μm (90 %) ε y ~0.78 μm (100 %) / ~0.43 μm (90 %) 19

Measurement result Measured on Mar 5 Laser injection phase 35˚ Measured on Mar 14 Laser injection phase 30˚ Measured on Mar 14 Laser injection phase 25˚ Measured on Mar 25 Laser injection phase 20˚ ε ~ 0.87 μm ε ~ 0.94 μm ε ~ 0.75 μm ε ~ 1.08 μm 20

gun sol. (A)L0a=0 AL0a=5 AL0a=10 A A A A A A A Measurement result Measured on Mar 27 Laser injection phase 25˚ 90% emittance gun sol. (A)L0a=0 AL0a=5 AL0a=10 A A A A A A A

Best Emittance Achieved as of October 8, 2013 (rms normalized, projected) ε x ~0.41 μm (95%) ε y ~0.48 μm (95%) ε x ~0.41 μm (95%) ε y ~0.48 μm (95%) M. S. Chae J. H. Han Emittance Measurements 22

Conclusions 1.The Injector Test Facility (ITF) for the PAL XFEL has been successfully constructed, commissioned in , and operated stably in The fast progresses was possible due to the 10-year preceding R&Ds. 2.Emittance goal has been already met with core emittance (< 90%) values far exceeding the goal. 3.Slice emittance measurements will be done in Various accelerator components including precision diagnostics are being tested with “real” low-emittance beams. 5.High-profile experiments including the “de-chirper” have been hosted with good results. 6.Focus efforts devoted to the ITF have been possible owing to the stable operation of the PLS-II. 23